AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Thursday, November 20, 2014
ITEMS 105 2084 TO 164 2012
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
0800 - 0800
1003 - 1151
2021 - 2328
3042 - 3287
4007 - 4682
5050 - 5997
6005 - 6986
7224 - 7661
8008 - 8999
9009 - 9059
100 2001 - 105 2078
105 2084 - 164 2012
164 2013 - 192 2065
192 2066 - 193 2036
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
105 2084 REM STAB BASE & ASPH (6" - 12") SY     56,333.000 3.00000 1
105 2088 REMOVING STAB BASE AND ASPH PAV (0" - 5") SY     365.000 10.00000 1
105 2094 REMOVING STAB BASE & ASPH PAV (12" - 27") SY     70,536.000 6.80000 1
105 2097 REMOVING STAB BASE & ASPH PV (5" TO 13" SY     313.000 10.50000 1
105 2104 REMOVING STAB BASE AND ASPH PAV (10.5" SY     32,576.000 5.31000 1
105 2106 REMOVING STAB BASE AND ASPH PAV (6" - 9") SY     1,666.000 10.00000 1
105 2108 RMV STAB BASE & ASPH PV (17") SY     3,745.000 6.53000 1
105 2109 REMOVING STAB BASE & ASPH PAV (19") SY     3,667.000 14.80000 1
106 2001 OBLITERATING ABANDONED ROAD STA     322.827 534.61241 15
106 2002 OBLITERATING ABANDONED ROAD SY     29,669.500 6.86833 8
110 2001 EXCAVATION (ROADWAY) CY 297,517.000 7.18946 9,136,288.770 6.42406 323
110 2002 EXCAVATION (CHANNEL) CY 37,008.000 6.71168 248,910.600 9.57887 99
110 2003 EXCAVATION (SPECIAL) CY     465,554.600 5.63145 29
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY     1,320.500 18.80348 5
110 2009 EXCAVATION (ROADWAY) (INTEL COMP) CY     62,217.000 7.00000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA 709.000 147.00000 7,703.820 278.96811 34
112 2002 SUBGRADE WIDENING (DENS CONT) STA 9.690 2,900.00000 3,346.475 688.06969 27
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     197,364.800 10.53139 22
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY 212.000 22.00000 1,009,774.000 6.11123 15
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 12,719.000 6.27113 995,619.020 6.83258 95
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY 62,300.000 1.50000 2,986,110.000 7.42445 53
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 166.000 35.53012 381,459.900 17.11422 52
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 11,211.000 1.83101 6,674,945.100 5.22061 114
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY 6,341.000 13.00000 176,568.240 4.10651 9
132 2008 EMBANKMENT (FINAL) (DENS CONT) (TY D) CY     244,751.000 4.26488 11
132 2010 EMBANKMENT (ORIGINAL) (DENS CONT) (TY A) CY     759.400 21.00000 1
132 2015 EMBANKMENT (ORIGINAL) (ORD COMP) (TY D) CY     12,379.000 20.00000 1
132 2017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY 1,210.000 55.00000 3,597.000 39.46372 3
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY 384.000 23.00000 50,536.700 16.59137 22
132 2020 EMBANKMENT (VEHICLE) (DENS CONT) (TY B) CY     62,458.000 .56404 2
132 2021 EMBANKMENT (VEHICLE) (ORD COMP) (TY C) CY 285.000 37.00000 1,794.000 33.11427 6
132 2022 EMBANKMENT (VEHICLE) (DENS CONT) (TY C) CY     6,500.000 4.00000 1
132 2025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY 122,446.000 2.00000 813,729.000 5.16790 13
132 2026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 202,025.000 10.00000 432,666.000 15.16169 14
132 2034 EMB (FNL) (DC) (TYC) (CSBE) (RWALL FND IMPR CY     4,222.000 44.00000 1
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     171,371.390 23.18148 10
132 2037 EMB (FNL) (DC) (TYE) (CSBE) (RWALL FND IMPR CY     19,381.000 21.36938 3
132 2038 EMB (FINAL) (DC) (TYE) (CSBE) (EMB FND IMPR CY     10,272.000 44.00000 1
132 2044 EMBANKMENT (FINAL) (DC) (TY C) (RWAL FND) CY     11,476.000 33.89000 1
132 2049 EMBANKMENT (FINAL) (ORD COMP) (TY C1) CY     8,617.000 20.00000 1
132 2054 EMB (FINAL) (DENS CONT) (TY B) (INTEL COM CY     54,672.000 9.76875 2
132 2055 EMB (FINAL) (DENS CONT) (TY C) (INTEL COM CY     6,763.000 20.00000 2
132 2056 EMB (FINAL) (DENS CONT) (TY D) (INTEL COM CY     17,710.000 2.30000 1
134 2001 BACKFILL (TY A) STA 1,258.060 192.19000 20,991.390 170.10929 45
134 2002 BACKFILL (TY B) STA 1,057.960 196.22704 15,077.170 183.70472 63
134 2003 BACKFILL (TY C) STA     804.990 224.81677 6
134 2004 BACKFILL (TY A OR B) STA 9.690 1,000.00000 15,740.280 148.36497 58
134 2005 BACKFILL TY A CY     426.800 55.00000 1
134 2006 BACKFILL (TY A) LF     156.000 50.74000 1
134 2010 BACKFILL (TY B) LF     80,206.000 .88410 2
150 2001 BLADING STA 514.000 220.00000 4,487.410 120.67721 20
150 2002 BLADING HR 35.000 134.85714 3,384.900 127.79595 85
150 2003 BLADING LF     4,925.000 2.00000 1
152 2001 ROAD GRADER WORK (ORD COMP) STA 774.200 186.36916 4,641.340 171.77819 19
152 2003 ROAD GRADER WORK (DENS CONT) STA     1,049.950 545.15453 3
156 2001 BULLDOZER WORK HR     79.000 181.34177 4
158 2002 SPEC EXCAV WORK (BACKHOE) HR     113.000 109.58973 5
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 26.000 139.00000 1,066.000 96.26482 11
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     2,910.000 6.61512 2
158 2006 SPEC EXCAV WORK (VEHICLE) CY     6,790.000 4.17084 2
160 2001 FURNISHING AND PLACING TOPSOIL (4") STA     1,142.350 97.98354 5
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 111,819.000 1.50963 4,644,589.500 .84317 91
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY 21.000 10.00000 4,885.000 5.19595 5
160 2005 FURNISHING AND PLACING TOPSOIL CY 50.000 60.00000 19,966.000 19.13391 23
160 2006 FURNISHING AND PLACING TOPSOIL (3") SY     387,222.000 .25000 1
160 2008 FURNISHING AND PLACING TOPSOIL (12") SY     866.000 50.00000 1
160 2009 FURNISHING AND PLACING TOPSOIL (8") SY     3,270.000 40.00000 1
161 2001 COMPOST MANUF TOPSOIL (BOS) (4") STA     801.430 91.46526 2
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY 262,063.000 .81693 3,542,202.000 1.23163 49
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     239,780.100 3.97953 12
161 2008 EROSION CONTROL COMPOST (2") SY     121,370.000 .71837 3
161 2009 EROSION CONTROL COMPOST CY     26,653.000 18.78500 8
161 2011 GENERAL USE COMPOST (1") SY     8,530.000 1.77000 1
161 2012 GENERAL USE COMPOST CY     26,008.000 20.30921 8
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY     497,139.000 1.34619 12
161 2015 COMPOST MANUF TOPSOIL (BOS OR PB) CY     483.000 42.40000 1
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY 1,338.000 3.25000 507,967.340 .77951 14
161 2020 COMPOST MANUF TOPSOIL (BIP) (6") SY     148.000 19.00000 1
161 2022 GENERAL USE COMPOST (4") SY     37,361.000 4.05013 3
161 2023 EROSION CONTROL COMPOST (4") SY     897.000 4.00000 1
161 2025 GENERAL USE COMPOST (2") SY     3,091.000 2.33600 1
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY 1,417.440 4.35000 3,066.440 10.09708 5
161 2028 EROSION CONTROL COMPOST (3") SY     275.000 5.00000 1
161 2029 COMPOST MANUF TOPSOIL (BOS) (2") SY     697,831.000 .64759 4
162 2002 BLOCK SODDING SY 180,801.000 2.14713 3,606,072.240 2.74787 140
162 2003 STRAW OR HAY MULCH SY 1,338.000 .40000 1,468,752.650 .19189 25
162 2004 MULCH SODDING SY     462,515.000 .45915 2
162 2005 MULCH SODDING CY     422.000 25.00000 1
162 2008 ROLL SODDING SY     20,300.000 3.50000 1
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 739.000 1.29000 1,428,455.000 .14799 33
164 2002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC     305.938 526.75568 14
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 89,004.000 .20846 1,173,549.500 .12497 31
164 2004 BROADCAST SEED (PERM) (RURAL) (CLAY) AC     16.050 622.68847 3
164 2005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY     86,203.000 .09634 2
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 740.000 1.50000 289,317.000 .54027 12
164 2008 BROADCAST SEED (PERM) (URBAN) (CLAY) AC     .275 802.00000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY 55,017.000 .09037 2,161,042.390 .09297 89
164 2010 BROADCAST SEED (TEMP) (WARM) AC     207.320 414.38072 16
164 2011 BROADCAST SEED (TEMP) (COOL) SY 55,017.000 .08256 1,955,363.500 .09375 77
164 2012 BROADCAST SEED (TEMP) (COOL) AC     365.530 447.14538 20