AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Tuesday, July 11, 2017
ITEMS 105 6054 TO 161 6022
ItemsItemsBid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1000 - 1133
2000 - 2228
3000 - 3267
4000 - 4191
5000 - 5969
6000 - 6920
7001 - 7135
8020 - 8947
9010 - 9063
100 2002 - 105 6049
105 6054 - 161 6022
161 6023 - 192 6003
192 6004 - 193 6024
Item NoDescriptionUnitsJune 30, 2017Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
105 6054REMOVING STAB BASE & ASPH PAV (18")SY  7,375.0008.735052
105 6057REMOVE STAB BS & ASPH PAV (5"-10")SY  7,342.0002.720001
105 6058REMOVING STAB BASE & ASPH PAV (10"-12"SY39,782.0004.03538154,652.0006.980163
105 6059REMOVING STAB BASE & ASPH PAV(13"-18")SY  3,216.00026.400001
105 6061REMOV STAB BASE & ASPH PAV (8"-20")SY  17,432.0007.000001
105 6063REMOVE STAB BASE AND ASPH PAV (1"-3")SY  43.00020.000001
105 6069REMOVING STAB BASE & ASPH PAV (4" - 6"SY45,219.0002.58974148,699.0002.612566
105 6070REMOVING STAB BASE & ASPH PAV (6" - 8"SY  18,505.6003.807983
105 6072REMOVING STAB BASE & ASPH PAV(26"-32")SY  309.00021.000001
105 6073REMOV STAB BASE AND ASPH PAV (22")SY  12,717.00015.830382
105 6074REMOVING STAB BASE AND ASPH PAV (4")SY  135,938.0001.713963
105 6075REMOV STAB BASE AND ASPH PAV (10"-18")SY13,417.0006.3000013,796.0006.676362
105 6076REMOV STAB BASE AND ASPH PAV (2"-15")SY  136,350.0005.170533
105 6077REMOVING STAB BASE & ASPH PAV (8")SY  11,033.0006.791083
105 6078REMOVE STAB BASE & ASPH PAV (24"-38")SY  8,826.00014.158062
105 6081REMOV STAB BASE & ASPH PAV (4"-14")SY8,850.0004.630008,850.0004.630001
105 6082REMOVING STAB BASE & ASPH PV(10 TO 16"SY  8,844.00010.500001
105 6084REM STAB BASE & ASPH (6"-12")SY  32,758.0002.213442
105 6087REMOVING STAB BASE AND ASPH PAV(8.5")SY  6,810.0003.250001
105 6092REMOVING STAB BASE AND ASPH PAV (5"-8"SY  303,617.0001.900001
105 6094REMOVING STAB BASE & ASPH PAV(12"-27")SY28,009.0007.00000123,386.0009.562204
105 6096REMOV STAB BASE AND ASPH PAV (0"-12")SY404,888.0004.04168741,370.3003.253068
105 6105REMOVING STAB BASE AND ASPH PAV(15")SY  28,935.0007.796744
105 6108RMV STAB BASE & ASPH PV (17")SY  17,866.0007.000001
105 6111REMOVE STAB BASE & ASPH (8")CY  1,749.0002.250001
105 6114REMOVING STAB BASE & ASPH PAV (12.5")SY  3,842.0006.000001
105 6115REMOVE STAB BS & ASPH PAV (7.5"-15.5")SY  32,929.0004.050842
105 6117REMOV STAB BASE & ASPH PAV (9.5"-15")SY  12,131.00011.000001
105 6118REMOVE TRTD BASE & ASPH (11 )CY  260.0005.000001
105 6119RMV TRT BASE & ASPH PAV (0"-19")SY  46,046.0006.100001
105 6120REMOVING STAB BASE AND ASPH PAV (3"-5"SY  111,804.0001.830001
105 6122REMOVE TRT BASE & ASPH PAV (20"-30")SY19,911.20011.5000019,911.20011.500001
106 6001OBLITERATING ABANDONED ROADSTA10.3301,664.5692230.7561,669.666415
106 6002OBLITERATING ABANDONED ROADSY  25,511.0002.206908
110 2001EXCAVATION (ROADWAY)CY  72,363.0006.132584
110 6001EXCAVATION (ROADWAY)CY1,327,117.0408.134648,135,927.7808.33918272
110 6002EXCAVATION (CHANNEL)CY3,635.00017.63109253,160.60011.0115964
110 6003EXCAVATION (SPECIAL)CY660.00020.00000158,485.22010.0514028
110 6004EXCAVATION (ROADWAY AND CHANNEL)CY1,136.0008.000005,593.00012.005194
112 6001SUBGRADE WIDENING (ORD COMP)STA  6,419.970411.9525637
112 6002SUBGRADE WIDENING (DENS CONT)STA296.160525.000004,044.650567.4977223
112 6003SUBGRADE WIDENING (DENS CONT)SY  14,012.0006.924352
132 2001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY  110.00012.000001
132 2006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY  44,886.00010.174712
132 2036EMBANK(FINAL)(DC)(TY E)(CSBE)CY  301.00040.000001
132 2037EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  768.00040.000001
132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY2,696.00030.3783498,412.80014.0623624
132 6002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY12,690.0007.75000136,022.70013.7605812
132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY34,022.0007.77827714,194.4004.7780366
132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY77,493.0005.575121,641,760.0009.4688641
132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY80,867.00010.86451289,341.90011.3463441
132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY699,532.4205.035495,700,261.4707.31024103
132 6007EMBANKMENT (FINAL)(ORD COMP)(TY D)CY  4,885.00015.251904
132 6008EMBANKMENT (FINAL)(DENS CONT)(TY D)CY150,457.0003.15000177,335.2004.431026
132 6011EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)CY  14,090.80013.492564
132 6013EMBANKMENT (ORIGINAL)(ORD COMP)(TY C)CY  889.50050.962902
132 6017EMBANKMENT (VEHICLE)(ORD COMP)(TY A)CY  257.00090.061173
132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY  42,481.00016.1655924
132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY  53,732.00011.4204615
132 6022EMBANKMENT (VEHICLE)(DENS CONT)(TY C)CY  639.00020.000001
132 6025EMBANKMENT (FINAL) (DENS CONT) (TY C1)CY158,715.0009.288531,747,642.8008.3484217
132 6026EMBANKMENT (FINAL) (DENS CONT) (TY C2)CY54,033.00010.511151,305,748.5006.1793819
132 6033EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPRCY  493.00070.000001
132 6035EMBANK(FINAL)(DC)(TY E)(CSBE)CY32,595.00035.6238790,096.00035.5082810
132 6036EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY4,839.00057.1308111,196.00044.473564
132 6037EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPRCY  4,279.00040.993223
132 6044EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  4,211.00030.000001
132 6055EMBANKMENT (FINAL)(ORD COMP)(TY C1)(ASCY  817.00058.000001
132 6056EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DSCY  9,231.00058.000001
134 6001BACKFILL (TY A)STA476.20098.9017213,011.990156.3646142
134 6002BACKFILL (TY B)STA532.060157.6889817,664.640137.7482452
134 6003BACKFILL (TY C)STA  1,618.310314.375465
134 6004BACKFILL (TY A OR B)STA287.100408.2549612,536.080165.4554352
134 6005BACKFILL TY ACY  1,569.00032.510044
134 6010BACKFILL (TY B)LF  39,050.0001.157825
134 6011BACKFILLING PAVEMENT EDGESCY  2,020.60038.708603
150 6001BLADINGSTA363.550301.125023,548.080201.4470126
150 6002BLADINGHR135.111115.550994,337.111117.8290688
150 6003BLADINGLF350.0007.5000011,855.000.706662
152 6001ROAD GRADER WORK (ORD COMP)STA  2,166.090220.5542211
156 6001BULLDOZER WORKHR  215.000100.604654
158 6002SPEC EXCAV WORK (BACKHOE)HR  85.00051.400003
158 6003SPEC EXCAV WORK (HYD EXCAVATOR)HR200.000171.150001,222.00078.8216713
158 6005SPEC EXCAV WORK (ORIGINAL)CY32,690.00015.9406532,690.00015.940652
158 6006SPEC EXCAV WORK (VEHICLE)CY  61.000100.000001
160 2006FURNISHING AND PLACING TOPSOIL (3")SY  4,262.00011.000002
160 6001FURNISHING AND PLACING TOPSOIL (4")STA354.900478.82998788.740413.341235
160 6003FURNISHING AND PLACING TOPSOIL (4")SY295,475.0001.777153,085,393.0001.30708109
160 6004FURNISHING AND PLACING TOPSOIL (6")SY83,280.0001.25000382,146.0001.369743
160 6005FURNISHING AND PLACING TOPSOILCY  4,310.80027.7957514
160 6006FURNISHING AND PLACING TOPSOIL (3")SY18,725.0003.50000491,427.000.732453
160 6008FURNISHING AND PLACING TOPSOIL (12")SY  1,809.0004.190001
161 2009EROSION CONTROL COMPOSTCY  64.00043.750002
161 2017COMPOST MANUF TOPSOIL (BIP) (4")SY  22,986.0001.000001
161 6005COMPOST MANUF TOPSOIL (4")SY  2,712.0003.000001
161 6008EROSION CONTROL COMPOST (2")SY  8,345.0001.650001
161 6009EROSION CONTROL COMPOSTCY7.00088.0000030,346.00030.402839
161 6012GENERAL USE COMPOSTCY1,050.00035.0000023,023.50034.1053212
161 6017COMPOST MANUF TOPSOIL (4")SY908,336.000.965335,804,698.0001.1532972
161 6022GENERAL USE COMPOST (4")SY19,213.0005.2500089,207.0004.708766