AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Tuesday, September 19, 2017
ITEMS 105 6054 TO 161 6022
ItemsItemsBid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0789
0800 - 0800
1000 - 1133
2000 - 2228
3000 - 3061
4000 - 4191
5000 - 5969
6000 - 6834
7000 - 7147
8020 - 8861
9021 - 9063
100 2002 - 105 6052
105 6054 - 161 6022
161 6023 - 192 6015
192 6016 - 193 6024
Item NoDescriptionUnitsAugust 31, 2017Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
105 6054REMOVING STAB BASE & ASPH PAV (18")SY  96,612.0008.000002
105 6057REMOVE STAB BS & ASPH PAV (5"-10")SY  7,342.0002.720001
105 6058REMOVING STAB BASE & ASPH PAV (10"-12"SY  154,652.0006.980163
105 6059REMOVING STAB BASE & ASPH PAV(13"-18")SY  3,216.00026.400001
105 6063REMOVE STAB BASE AND ASPH PAV (1"-3")SY  43.00020.000001
105 6065REMOVING STAB BASE AND ASPH PAV (1")SY30,146.0001.5000030,146.0001.500001
105 6069REMOVING STAB BASE & ASPH PAV (4" - 6"SY3,509.0002.50000152,208.0002.609977
105 6070REMOVING STAB BASE & ASPH PAV (6" - 8"SY  18,197.0003.363802
105 6072REMOVING STAB BASE & ASPH PAV(26"-32")SY  309.00021.000001
105 6073REMOV STAB BASE AND ASPH PAV (22")SY106,377.2004.54000106,377.2004.540001
105 6074REMOVING STAB BASE AND ASPH PAV (4")SY  136,138.0001.786364
105 6075REMOV STAB BASE AND ASPH PAV (10"-18")SY75,349.0002.0000099,732.0004.354914
105 6076REMOV STAB BASE AND ASPH PAV (2"-15")SY  136,350.0005.170533
105 6077REMOVING STAB BASE & ASPH PAV (8")SY  7,699.0007.350182
105 6078REMOVE STAB BASE & ASPH PAV (24"-38")SY  2,477.00012.000001
105 6081REMOV STAB BASE & ASPH PAV (4"-14")SY  8,850.0004.630001
105 6084REM STAB BASE & ASPH (6"-12")SY  18,130.0004.315502
105 6085REMOVING STAB BASE & ASPH PAV (0-19 INSY2,831.00010.000005,442.0008.728562
105 6087REMOVING STAB BASE AND ASPH PAV(8.5")SY  6,810.0003.250001
105 6092REMOVING STAB BASE AND ASPH PAV (5"-8"SY  303,617.0001.900001
105 6094REMOVING STAB BASE & ASPH PAV(12"-27")SY  196,894.0008.043806
105 6096REMOV STAB BASE AND ASPH PAV (0"-12")SY910.1004.13000741,700.4003.244958
105 6105REMOVING STAB BASE AND ASPH PAV(15")SY  25,070.0008.921673
105 6108RMV STAB BASE & ASPH PV (17")SY  17,866.0007.000001
105 6111REMOVE STAB BASE & ASPH (8")CY  1,749.0002.250001
105 6114REMOVING STAB BASE & ASPH PAV (12.5")SY  3,842.0006.000001
105 6115REMOVE STAB BS & ASPH PAV (7.5"-15.5")SY  32,929.0004.050842
105 6118REMOVE TRTD BASE & ASPH (11 )CY  260.0005.000001
105 6119RMV TRT BASE & ASPH PAV (0"-19")SY  46,046.0006.100001
105 6120REMOVING STAB BASE AND ASPH PAV (3"-5"SY  111,804.0001.830001
105 6122REMOVE TRT BASE & ASPH PAV (20"-30")SY  19,911.20011.500001
106 6001OBLITERATING ABANDONED ROADSTA2.0005,000.0000022.6562,461.754505
106 6002OBLITERATING ABANDONED ROADSY  22,338.0001.680986
110 2001EXCAVATION (ROADWAY)CY  25,320.0004.023262
110 6001EXCAVATION (ROADWAY)CY2,611,624.0009.4651110,526,233.0808.23377281
110 6002EXCAVATION (CHANNEL)CY13,608.00011.80243241,043.20011.3148266
110 6003EXCAVATION (SPECIAL)CY166,400.0007.27594294,125.2208.3142628
110 6004EXCAVATION (ROADWAY AND CHANNEL)CY  3,643.00014.684333
112 6001SUBGRADE WIDENING (ORD COMP)STA1,380.500418.544068,210.230382.2898043
112 6002SUBGRADE WIDENING (DENS CONT)STA13.1501,215.969583,095.090440.9776121
112 6003SUBGRADE WIDENING (DENS CONT)SY2,928.0008.0000016,940.0007.110273
132 2001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY  110.00012.000001
132 2006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY  3,921.00012.000001
132 2036EMBANK(FINAL)(DC)(TY E)(CSBE)CY  301.00040.000001
132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY39,475.00014.63272122,820.80016.1435924
132 6002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY93,825.8004.73045270,958.5005.8010916
132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY97,184.00010.05578989,736.0008.1888473
132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY26,644.0006.104191,652,823.0008.9000336
132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY1,089.00032.26814297,902.90010.9953143
132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY1,329,194.2006.228206,701,749.8707.09251104
132 6007EMBANKMENT (FINAL)(ORD COMP)(TY D)CY1,100.0005.000004,335.00018.040495
132 6008EMBANKMENT (FINAL)(DENS CONT)(TY D)CY3,786.00016.57493180,672.2004.675288
132 6011EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)CY1,549.00010.0000013,799.80012.899534
132 6013EMBANKMENT (ORIGINAL)(ORD COMP)(TY C)CY  889.50050.962902
132 6017EMBANKMENT (VEHICLE)(ORD COMP)(TY A)CY177.00046.86102362.00076.158564
132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY4,423.00018.2236037,678.00015.5075422
132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY13,880.00011.7087926,903.00017.8581920
132 6022EMBANKMENT (VEHICLE)(DENS CONT)(TY C)CY  639.00020.000001
132 6025EMBANKMENT (FINAL) (DENS CONT) (TY C1)CY162,286.00010.974551,884,241.1007.9213519
132 6026EMBANKMENT (FINAL) (DENS CONT) (TY C2)CY452,473.0005.008193,912,331.0005.3351619
132 6033EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPRCY  493.00070.000001
132 6035EMBANK(FINAL)(DC)(TY E)(CSBE)CY3,859.00040.0000079,862.00035.270098
132 6036EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY9,841.00040.0000021,037.00042.380855
132 6037EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPRCY1,946.00040.000006,042.00041.006293
132 6044EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPRCY  4,211.00030.000001
132 6055EMBANKMENT (FINAL)(ORD COMP)(TY C1)(ASCY9,193.64040.0000010,010.64041.469042
132 6056EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DSCY  9,231.00058.000001
134 6001BACKFILL (TY A)STA735.990188.4014211,747.380158.9366143
134 6002BACKFILL (TY B)STA1,904.160137.6627619,596.610137.3885355
134 6003BACKFILL (TY C)STA  1,618.310314.375465
134 6004BACKFILL (TY A OR B)STA1,851.550100.4880815,649.020150.3099360
134 6005BACKFILL TY ACY  360.00043.989582
134 6006BACKFILL (TY A)LF  5,962.00010.000001
134 6008BACKFILL (TY A OR B)CY  233.00025.000001
134 6010BACKFILL (TY B)LF3,542.0004.5409442,592.0001.439167
134 6011BACKFILLING PAVEMENT EDGESCY  967.00030.764222
150 6001BLADINGSTA715.96080.971454,823.100184.0892528
150 6002BLADINGHR555.000137.028833,797.111125.3902792
150 6003BLADINGLF  350.0007.500001
152 6001ROAD GRADER WORK (ORD COMP)STA630.680146.655342,632.740237.3185412
156 6001BULLDOZER WORKHR  255.00092.666675
158 6002SPEC EXCAV WORK (BACKHOE)HR20.00068.40000105.00054.638104
158 6003SPEC EXCAV WORK (HYD EXCAVATOR)HR396.00040.000001,538.00065.2536312
158 6005SPEC EXCAV WORK (ORIGINAL)CY  33,420.00015.876423
160 2006FURNISHING AND PLACING TOPSOIL (3")SY  2,131.00011.500001
160 6001FURNISHING AND PLACING TOPSOIL (4")STA  707.400380.379934
160 6003FURNISHING AND PLACING TOPSOIL (4")SY1,389,795.0001.124955,050,453.000.8855196
160 6004FURNISHING AND PLACING TOPSOIL (6")SY7,050.0002.00000389,196.0001.381164
160 6005FURNISHING AND PLACING TOPSOILCY150.00017.000004,054.80026.6528912
160 6006FURNISHING AND PLACING TOPSOIL (3")SY  496,589.000.745624
160 6008FURNISHING AND PLACING TOPSOIL (12")SY  1,809.0004.190001
161 2009EROSION CONTROL COMPOSTCY  32.00068.500001
161 2017COMPOST MANUF TOPSOIL (BIP) (4")SY  22,986.0001.000001
161 6005COMPOST MANUF TOPSOIL (4")SY  2,712.0003.000001
161 6008EROSION CONTROL COMPOST (2")SY  8,345.0001.650001
161 6009EROSION CONTROL COMPOSTCY10,130.00033.8677224,560.00024.728067
161 6012GENERAL USE COMPOSTCY6,778.00030.5609217,581.00027.9072411
161 6017COMPOST MANUF TOPSOIL (4")SY899,686.0002.024535,507,436.0001.2933775
161 6019EROSION CONTROL COMPOST (1.5")SY  16,205.0002.030001
161 6022GENERAL USE COMPOST (4")SY  44,520.0004.484434