AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Friday, August 1, 2014
ITEMS 400 2001 TO 420 2018
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1003 - 1146
2021 - 2271
3042 - 3285
4001 - 4679
5050 - 5997
6004 - 6986
7380 - 7642
8008 - 8999
9009 - 9059
400 2001 - 420 2018
420 2019 - 425 2002
425 2003 - 430 2076
430 2079 - 432 2035
432 2036 - 450 2043
450 2044 - 454 2008
454 2009 - 464 2003
464 2004 - 465 2116
465 2117 - 465 2459
465 2475 - 466 2021
466 2022 - 466 2300
466 2304 - 467 2158
467 2159 - 467 2344
467 2348 - 476 2100
479 2001 - 499 2001
Item No Description Units July 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2001 STRUCT EXCAV CY 79,947.000 1.06354 185,750.800 1.52790 16
400 2002 STRUCT EXCAV (BOX) CY     20,261.000 4.07704 14
400 2003 STRUCT EXCAV (PIPE) CY 1,022.000 5.80431 22,867.000 5.31749 15
400 2004 STRUCT EXCAV (BRIDGE) CY 408.000 23.98000 860.600 27.87885 4
400 2005 CEM STABIL BKFL CY 44,981.600 47.12537 232,698.260 45.52124 192
400 2006 CUT & RESTORING PAV SY 1,265.700 76.91534 26,336.680 77.95095 82
400 2007 STRUCT EXCAV (SPECIAL) CY 429.000 35.00000 891.000 53.84400 3
400 2008 CUT & RESTORING PAV (ASPH) SY 6,620.800 76.28066 12,671.000 80.82535 34
400 2009 CUT & RESTORING PAV (CONC) SY 408.800 131.62304 5,728.920 72.58996 9
400 2010 CUT & RESTORING PAV (FLEX BASE) SY 444.000 36.00000 2,001.000 45.41529 7
400 2011 SAND BACKFILL CY     978.000 46.48294 4
400 2016 CEMENT STAB BACKFILL (INLET OR MH) CY 2,267.500 38.42218 10,419.800 32.39960 20
400 2017 CEM STABIL BKFL F CY 5,661.000 30.00000 5,824.600 33.65141 2
400 2018 CUT & RESTORING PAV F SY 1.000 400.00000 251.000 80.22908 2
400 2020 CEM STAB BCKFL (UNDER APPR SLAB) CY     263.400 121.52316 2
400 2023 CEM STAB BKFL (BEHIND ABUTMENT) CY 6.000 150.00000 2,235.000 141.63494 8
401 2001 FLOWABLE BACKFILL CY 1,499.000 106.12779 16,563.300 126.18462 81
401 2002 FLOWABLE BACKFILL (MEDIAN) CY 69.000 220.00000 308.000 154.04221 2
402 2001 TRENCH EXCAVATION PROTECTION LF 99,613.000 1.19881 562,866.490 2.32079 162
403 2001 TEMPORARY SPL SHORING SF 195,538.500 15.09697 1,522,072.200 7.34819 135
403 2002 TEMPORARY SPL SHORING (SOIL NAIL) SF 1,383.000 37.00000 11,791.100 29.01425 3
403 2003 TEMPORARY SPL SHORING (BASE BID) SF     28.000 100.00000 1
403 2007 TEMPORARY SPL SHORING (ROCK NAIL) SF 147.000 52.50000 147.000 52.50000 1
403 2010 TEMPORARY SPL SHORING (COFFERDAM) SF 16,936.000 27.94000 38,048.000 16.51135 3
403 2011 TEMPORARY SPL SHORING (RAILROAD CANT) SF     751.000 135.00000 1
407 2001 SHEET PILING (PZ - 27) SF     3,878.000 48.61681 2
407 2002 STL H - PILING (HP 14 X 73) LF 4,496.000 80.00000 6,098.000 92.93842 2
407 2005 SHEET PILING (PZ - 22) SF     7,278.000 30.89805 4
407 2009 STL H - PILING (HP 12 X 84) LF     1,227.000 106.37000 1
407 2015 STEEL H - PILING (HP 12 X 53) LF 18,960.000 51.06000 19,424.000 51.99020 2
409 2001 PRESTR CONC PIL (16 IN SQ) LF 36,806.000 40.31488 45,995.000 54.17793 19
409 2002 PRESTR CONC PIL (18 IN SQ) LF 480.000 90.00000 57,032.000 70.96010 14
409 2003 PRESTR CONC PIL (20 IN SQ) LF 2,886.000 38.19000 8,492.000 120.95694 4
409 2004 PRESTR CONC PIL (24 IN SQ) LF     8,594.000 110.00000 1
409 2015 PRESTR CONC PIL (16 IN SQ) (HPC) LF     564.000 130.00000 1
409 2016 PRESTR CONC PIL (18 IN SQ) (HPC) LF     550.000 130.00000 1
409 2017 PRESTR CONC PIL (20 IN SQ) (HPC) LF     1,300.000 160.00000 1
409 2019 PRESTR CONC PIL (16 IN SQ) (SULF) LF 1,960.000 60.00000 1,960.000 60.00000 1
409 2025 PRESTR CONC SHEET PIL (12") (HPC) SF     5,868.000 34.00000 1
416 2001 DRILL SHAFT (18 IN) LF 5,045.000 60.20985 16,484.000 55.95545 40
416 2002 DRILL SHAFT (24 IN) LF 17,715.000 70.16877 44,664.000 105.74604 57
416 2003 DRILL SHAFT (30 IN) LF 15,069.000 121.21624 75,065.000 125.34634 52
416 2004 DRILL SHAFT (36 IN) LF 26,366.000 146.42274 124,870.000 145.53362 98
416 2005 DRILL SHAFT (42 IN) LF 6,452.000 246.95955 23,024.400 203.75249 22
416 2006 DRILL SHAFT (48 IN) LF 11,497.000 244.93085 27,839.000 256.49136 19
416 2007 DRILL SHAFT (54 IN) LF 476.000 275.00000 16,226.000 335.65704 11
416 2008 DRILL SHAFT (60 IN) LF 508.000 325.00000 1,264.000 340.79747 4
416 2009 DRILL SHAFT (66 IN) LF     1,065.000 430.00000 1
416 2010 DRILL SHAFT (72 IN) LF     3,834.800 368.92417 4
416 2012 DRILL SHAFT (84 IN) LF 266.000 860.00000 21,886.000 516.40176 4
416 2015 DRILL SHAFT (NON - REINFORCED) (12 IN) LF     403.500 66.84932 15
416 2016 DRILL SHAFT (SIGN MTS) (12 IN) LF 77.000 158.63636 269.000 102.08309 9
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF 127.500 157.90431 2,437.400 120.33576 40
416 2019 DRILL SHAFT (SIGN MTS) (30 IN) LF     204.000 177.69853 5
416 2020 DRILL SHAFT (SIGN MTS) (36 IN) LF     1,221.400 199.19393 13
416 2021 DRILL SHAFT (SIGN MTS) (42 IN) LF     2,391.800 221.51036 13
416 2022 DRILL SHAFT (SIGN MTS) (48 IN) LF 1,074.000 276.77426 2,718.330 294.58051 17
416 2023 DRILL SHAFT (SIGN MTS) (54 IN) LF 666.000 640.00000 1,767.000 475.06467 14
416 2025 DRILL SHAFT (HIGH MAST POLE) (54 IN) LF     256.000 383.58594 2
416 2026 DRILL SHAFT (HIGH MAST POLE) (60 IN) LF 1,536.000 600.01953 3,547.000 517.87123 10
416 2027 DRILL SHAFT (HIGH MAST POLE) (66 IN) LF     2,430.000 591.88375 3
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 1,034.000 183.67505 11,853.000 149.40170 64
416 2030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF 54.000 138.66667 1,281.400 134.58157 25
416 2031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF 186.300 238.06763 1,496.900 196.71479 37
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 1,110.400 248.01366 8,842.100 209.68492 116
416 2033 DRILL SHAFT (TRF SIG POLE) (42 IN) LF 52.000 215.28500 407.000 262.76671 12
416 2034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF 374.000 300.67412 4,994.600 307.03656 64
416 2038 DRILL SHAFT (108 IN) LF     123.000 800.00000 1
416 2039 DRILL SHAFT (144 IN) LF     153.000 2,000.00000 1
416 2043 DRILL SHAFT (54 IN) (BASE BID) LF     18.000 380.00000 1
416 2047 DRILL SHAFT (96 IN) LF     3,805.000 718.93561 2
416 2051 DRILL SHAFT (120 IN) LF     2,937.000 1,317.22430 3
416 2052 DRILLED SHAFT (12 IN) LF     20.000 20.00000 1
416 2055 DRILL SHAFT (TRF SIG POLE) (30 IN) (ROCK LF     80.600 255.52072 4
416 2056 DRILL SHAFT (TRF SIG POLE) (36 IN) (ROCK LF     255.400 264.22733 4
416 2068 DRILL SHAFT (SIGN MTS) (60 IN) LF 588.000 350.00000 916.000 385.80786 2
416 2086 DRILL SHAFT (RDWY ILL POLE) (24 IN) LF 27.500 100.00000 699.500 100.48034 2
416 2087 CORE HOLE EA     9.000 500.00000 1
416 2089 0416 2010 CASING (72") (REMAIN IN PLACE LF     100.000 1,736.78000 1
416 2091 0416 2010 CASING (120") (REMAIN IN PLACE LF     20.000 590.00000 1
416 2093 0416 2010 CASING (54") (REMAIN IN PLACE LF     320.000 448.95000 1
416 2094 DRILL SHAFT (60 IN) (CORED) LF     216.000 1,025.00000 1
416 2095 CASING (60") (REMAIN IN PLACE) LF     80.000 710.00000 1
420 2001 CL A CONC (MISC) CY 707.400 250.00000 1,478.300 352.60716 11
420 2002 CL B CONC (FLUME) CY 39.000 375.00000 1,341.500 289.69253 8
420 2003 CL C CONC (ABUT) CY 1,369.500 843.24085 11,378.890 727.92917 114
420 2004 CL C CONC (BENT) CY 3,999.400 851.67868 14,826.500 874.78119 71
420 2005 CL C CONC (FOOTING) CY 1,294.000 626.66067 5,140.100 636.75196 15
420 2006 CL C CONC (RAIL FOUNDATION) CY 422.500 382.84024 2,731.500 452.73746 32
420 2007 CL C CONC (CULV) CY     1,057.700 700.62967 6
420 2008 CL C CONC (WINGWALLS) CY     64.500 817.98450 3
420 2009 CL C CONC (HDWL) CY     8.000 2,207.50000 2
420 2010 CL C CONC (SIGN COLUMN) CY 365.120 500.00000 1,833.570 564.79436 5
420 2011 CL C CONC (RETAINING WALL) CY 9.100 1,000.00000 85.000 806.05882 3
420 2013 CL C CONC (MISC) CY 250.400 772.63578 888.220 728.76228 29
420 2014 CL C CONC (CURB OUTLET) (TY I) EA     3.000 1,666.66667 2
420 2015 CL C CONC (CURB OUTLET) (TY II) EA     6.000 1,591.66667 2
420 2016 CL C CONC (COLLAR) EA 10.000 1,700.00000 224.000 552.81830 23
420 2017 CL C CONC (BENT) (MASS PLACEMENT) CY     1,900.400 690.00000 1
420 2018 CL C CONC (FOOTING) (MASS PLACEMENT) CY 1,243.900 423.94966 8,471.300 439.57297 4