AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Monday, September 15, 2014
ITEMS 528 2032 TO 531 2018
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1003 - 1150
2021 - 2314
3042 - 3286
4001 - 4681
5050 - 5997
6004 - 6986
7380 - 7642
8008 - 8999
9009 - 9059
500 2001 - 528 2031
528 2032 - 531 2018
531 2019 - 544 2006
544 2007 - 560 2036
Item No Description Units August 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
528 2032 LANDSCAPE PAVERS (BRICK) (CROSSWALK) SY     376.000 70.65000 1
529 2001 CONC CURB (TY I) LF 1,820.000 9.58462 88,527.200 7.73696 23
529 2002 CONC CURB (TY II) LF 1,129.000 19.21623 75,050.000 11.91941 40
529 2003 CONC CURB & GUTTER (TY I) LF 6,807.000 11.83246 33,790.100 16.14618 16
529 2004 CONC CURB & GUTTER (TY II) LF 110,649.000 14.16470 491,258.200 14.99048 74
529 2005 CONC CURB (MONO) (TY I) LF 12,871.000 7.15713 46,011.000 5.25653 10
529 2006 CONC CURB (MONO) (TY II) LF 83,368.000 2.45935 677,276.000 3.02507 56
529 2007 CONC CURB (DOWEL) LF 32,341.000 11.48139 148,728.000 8.49482 21
529 2008 CONC CURB & GUTTER (SPECIAL) LF     614.000 18.00000 1
529 2009 CONCRETE CURB (SPECIAL) LF 96.000 20.40000 16,689.000 16.40265 10
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF 2,661.000 14.00000 37,777.000 18.95984 9
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     1,444.000 14.46958 5
529 2012 CONC CURB & GUTTER (TY A) (BARRIER) LF     4,008.000 19.75524 2
529 2013 CONC CURB (TY A) (BARRIER) LF     50.000 44.00000 1
529 2014 CONC CURB (TY C) LF 6,284.000 10.00000 10,615.000 11.83316 3
529 2015 CONC CURB (TY I) (REINF) LF     5,421.000 1.00000 1
529 2016 CONC CURB (TY F) LF     13,341.000 20.80000 1
529 2017 CONC CURB & GUTTER (VALLEY GUTTER) LF     706.000 61.68739 2
529 2018 CONC CURB (MONO) (TY II) (SPECIAL) LF 8,098.000 2.00000 8,098.000 2.00000 1
529 2020 CONC CURB & GUTTER (TY A) (VALLEY GUTTER LF     168.000 33.00000 1
529 2021 CONC CURB (DOWEL) (REINF) (TY II) LF     3,331.000 13.52498 5
529 2023 CONC CURB (MONO) LF     200.000 22.50000 1
529 2024 CONC CURB (MOUNTABLE) LF 2,771.000 7.00000 2,771.000 7.00000 1
529 2026 CONC CURB (ARMOR CURB SLOT) LF     527.000 196.04516 6
529 2029 CONC CURB & GUTTER (TY II A) LF     3,916.000 16.50000 1
529 2030 CONC CURB (MONO) (TY II A) LF     337.000 16.50000 1
529 2032 CONC CURB (TY B) MOUNTABLE LF     7,133.300 7.85000 1
529 2035 CONC CURB & GUTTER (TY II) (MOD) LF     4,444.000 13.99436 4
529 2037 CONC CURB (TY II) (REINF) LF     165.000 24.10303 2
529 2038 CONC CURB AND GUTTER (TY A) LF     628.000 14.23726 2
529 2040 CONC CURB (TY II) (MOD) LF     6,595.000 15.20470 2
529 2052 CURB AND GUTTER (TYPE I - C) LF     327.000 25.00000 1
529 2057 CURB AND GUTTER (TYPE II - C) LF     1,006.000 17.00000 1
529 2059 CONC CURB & GUTTER (TY I) (MOD) LF     1,538.000 19.64109 3
529 2060 CONC CURB & GUTTER (RIBBON) (MOD) LF     673.000 15.00000 1
529 2061 CONC CURB (TY C1) LF     2,671.000 57.59876 9
529 2062 CONC CURB (TY C2) LF     942.000 83.89490 3
529 2064 CONC CURB (TY F1) LF     1,701.000 73.69885 4
529 2065 CONC CURB (TY F2) LF     3,044.000 95.41106 5
529 2066 CONC CURB (RIBBON) (MOD) LF 533.000 15.40000 6,138.000 14.96137 5
529 2070 CONCRETE CURB (TYPE U - TURN) (SPECIAL) LF     7,092.000 33.00474 5
529 2071 CONC CURB (SLOTTED) LF 150.000 25.20000 595.000 25.29412 3
529 2075 CONC CURB (TY 1) (MOD) LF     120.000 30.00000 1
529 2076 CONC GUTTER (2') LF     169.900 33.00000 1
529 2083 CONC CURB & GUTTER (SPANDREL) LF     1,298.000 44.65000 1
529 2084 CONC CURB (ARMOR CURB SLOT) (MOD) LF     144.000 204.75000 1
529 2086 CONC CURB (DOWEL) (SLOTTED) LF 260.000 18.00000 3,290.000 17.54498 5
529 2094 CONC CURB (TY F3) LF     9,364.000 115.93343 7
529 2095 CONC CURB (MONO) (TY II) (DOWEL) (SAWTOOTH LF     27.000 40.00000 1
529 2096 CONC CURB (MONO) (TY II) (DOWEL) (REINF) LF     703.000 14.00000 1
529 2108 CONC CURB (MONO) (TY I) (REINF) LF     5,077.000 1.00000 1
529 2109 CONC CURB (MONO) (TY II) (REINF) LF     4,601.000 1.34000 1
530 2001 INTERSECTIONS (CONC) EA     1.000 7,500.00000 1
530 2002 INTERSECTIONS (ACP) EA 5.000 3,500.00000 63.000 3,794.26381 8
530 2003 INTERSECTIONS (SURF TREAT) EA     62.000 2,064.60226 5
530 2004 INTERSECTIONS (CONC) SY 267.000 70.00000 942.000 85.88471 6
530 2005 INTERSECTIONS (ACP) SY 5,241.000 35.74272 132,409.510 17.72480 46
530 2006 INTERSECTIONS (SURF TREAT) SY     20,521.400 18.85361 18
530 2007 DRIVEWAYS (CONC) EA 1.000 2,500.00000 68.000 5,826.10074 12
530 2008 DRIVEWAYS (ACP) EA 262.000 662.21374 1,370.000 1,536.80474 25
530 2009 DRIVEWAYS (SURF TREAT) EA 22.000 500.00000 477.000 769.56614 14
530 2010 DRIVEWAYS (CONC) SY 32,383.600 58.53135 207,403.570 56.34436 163
530 2011 DRIVEWAYS (ACP) SY 50,539.050 36.44479 270,206.690 29.95887 131
530 2012 DRIVEWAYS (SURF TREAT) SY 12,758.000 31.79932 112,141.000 22.09636 48
530 2014 TURNOUTS (ACP) EA 1.000 2,000.00000 438.000 1,189.88543 18
530 2015 TURNOUTS (SURF TREAT) EA 33.000 700.00000 630.000 459.40343 14
530 2017 TURNOUTS (ACP) SY 2,451.000 37.27271 13,267.640 42.26796 24
530 2018 TURNOUTS (SURF TREAT) SY 1,414.710 17.01989 16,358.710 19.71703 23
530 2020 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY 174.000 40.00000 9,188.700 37.93620 3
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     12,152.000 27.17068 2
530 2023 DRIVEWAYS AND TURNOUTS (ACP) SY     1,570.000 18.60191 2
530 2024 DRIVEWAYS AND TURNOUTS (SURF TREAT) SY     8,481.000 25.32402 3
530 2029 DRIVEWAYS (OTHER) SY     7,374.270 14.50550 7
530 2030 DRIVEWAYS (ACP) (TYPE 1) SY 1,373.000 34.10000 13,770.000 25.66574 7
530 2031 DRIVEWAYS (ACP) (TYPE 2) SY 170.000 52.37000 7,659.000 31.96941 4
530 2036 DRIVEWAYS (CONC) (TYPE 2) SY     5,133.000 64.08635 3
530 2037 DRIVEWAYS (CONC) (TYPE 1) SY     1,814.000 61.07222 5
530 2038 DRIVEWAYS (CONC) (HES) SY 5,934.000 93.22225 19,516.000 77.43968 12
530 2050 DRIVEWAYS (SURF TREAT) (TYPE 1) SY     2,433.000 24.68763 3
530 2058 DRIVEWAYS (OTHER) EA 44.000 700.00000 45.000 740.00000 2
530 2075 DRIVEWAYS (GRAVEL) SY 53.000 30.00000 24,611.500 12.25979 12
530 2078 DRIVEWAYS (SURF TREAT) (TYPE 3) SY     2,031.000 14.73757 3
530 2090 DRIVEWAYS (FL BS) SY 2,812.000 15.80855 3,510.000 16.24221 6
531 2002 CONC SIDEWALKS (4') (6") LF     16.000 70.00000 1
531 2003 CONC SIDEWALKS (5') (6") LF     15,835.000 26.95590 3
531 2004 CONC SIDEWALKS (6") SY 18,194.000 39.58027 96,260.200 45.38987 33
531 2005 CURB RAMPS (TY 1) EA 54.000 1,482.30852 1,368.000 1,308.53072 84
531 2006 CURB RAMPS (TY 2) EA 35.000 1,440.66914 425.000 1,390.77866 50
531 2007 CURB RAMPS (TY 3) EA 16.000 1,920.14500 867.000 1,332.58930 16
531 2008 CURB RAMPS (TY 4) EA 6.000 2,218.33333 20.000 1,556.58250 7
531 2009 CURB RAMPS (TY 6) EA 1.000 1,100.00000 851.000 1,367.24925 15
531 2010 CURB RAMPS (TY 7) EA 116.000 1,680.92664 2,770.000 1,153.44363 84
531 2011 CURB RAMPS (TY 8) EA 2.000 800.00000 28.000 1,145.53571 4
531 2012 CURB RAMPS (TY 9) EA 18.000 2,709.44444 35.000 2,019.42857 7
531 2013 CURB RAMPS (TY 20) EA 4.000 1,616.58250 62.000 1,443.36016 10
531 2014 CURB RAMPS (TY 22) EA 7.000 2,421.34286 113.000 2,205.11717 34
531 2015 CONC SIDEWALKS (4") SY 15,144.990 53.27362 209,802.200 45.10547 70
531 2016 CONC SIDEWALKS (6') (6") LF     23,539.000 39.80768 5
531 2017 CURB RAMPS (TY 21) EA 20.000 1,519.96600 235.000 1,572.39596 50
531 2018 CURB RAMPS (SPECIAL) EA 4.000 2,894.48500 25.000 3,015.11760 7