AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Monday, April 27, 2015
ITEMS 529 2015 TO 540 2047
Items Items Bid Code Range
0100 - 0192
0204 - 0292
0305 - 0361
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
1000 - 1122
2144 - 2303
3004 - 3288
4002 - 4581
5049 - 5935
6000 - 6986
7000 - 7666
8020 - 8999
500 2001 - 506 2027
506 2031 - 529 2013
529 2015 - 540 2047
540 2048 - 556 2010
556 2011 - 560 6013
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
529 2015 CONC CURB (TY I) (REINF) LF     310.000 30.64516 2
529 2019 CONC CURB & GUTTER (TY B) (MOUNTABLE) LF     100.000 35.00000 1
529 2032 CONC CURB (TY B) MOUNTABLE LF     40.000 61.00000 1
529 2069 CONC CURB AND GUTTER (TY I) (REINF) LF     140.000 17.00000 1
529 2070 CONCRETE CURB (TYPE U - TURN) (SPECIAL) LF     19.000 11.60000 1
529 6001 CONC CURB (TY I) LF 1,135.000 8.30000 1,190.000 9.30294 2
529 6002 CONC CURB (TY II) LF 100.000 10.00000 100.000 10.00000 1
529 6005 CONC CURB (MONO) (TY II) LF 805.000 19.29193 2,038.000 14.16634 6
529 6008 CONC CURB & GUTTER (TY II) LF 5,182.000 27.14966 5,413.000 26.94413 5
529 6009 CONC CURB (DOWEL) (SLOTTED) LF 10.000 50.00000 10.000 50.00000 1
530 2003 INTERSECTIONS (SURF TREAT) EA     7.000 3,786.07143 2
530 2005 INTERSECTIONS (ACP) SY     2,587.000 18.66000 1
530 2006 INTERSECTIONS (SURF TREAT) SY 829.000 8.25000 27,235.000 4.00681 11
530 2007 DRIVEWAYS (CONC) EA     8.000 2,416.50000 3
530 2008 DRIVEWAYS (ACP) EA 5.000 1,700.00000 32.000 942.68750 7
530 2009 DRIVEWAYS (SURF TREAT) EA 57.000 20.00000 143.000 369.82517 6
530 2010 DRIVEWAYS (CONC) SY 384.000 89.62240 1,169.900 79.93846 10
530 2011 DRIVEWAYS (ACP) SY 431.000 58.65000 6,638.000 33.51323 13
530 2012 DRIVEWAYS (SURF TREAT) SY     6,887.000 22.18060 5
530 2015 TURNOUTS (SURF TREAT) EA 5.000 600.00000 193.000 558.93782 8
530 2017 TURNOUTS (ACP) SY 230.000 7.83000 252.000 10.63849 2
530 2018 TURNOUTS (SURF TREAT) SY 450.000 14.75000 14,709.000 16.07226 7
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     1,840.000 39.05000 1
530 2057 TURNOUTS (RAP) SY     22,019.000 10.13814 2
530 2058 DRIVEWAYS (OTHER) EA 13.000 450.00000 183.000 267.59563 8
530 2075 DRIVEWAYS (GRAVEL) SY     518.000 9.00000 1
530 6004 DRIVEWAYS (CONC) SY 84.000 75.00000 134.000 54.47761 2
530 6005 DRIVEWAYS (ACP) SY 1,768.000 44.04412 2,621.000 38.63342 4
530 6006 DRIVEWAYS (SURF TREAT) SY     90.000 108.20000 1
530 6008 TURNOUTS (ACP) SY 1,196.000 45.00000 1,196.000 45.00000 1
530 6009 TURNOUTS (SURF TREAT) SY     390.000 59.00000 1
530 6016 DRIVEWAYS (BASE) SY 105.000 25.00000 471.000 23.56242 2
531 2001 CONC SIDEWALKS (3') (6") LF     10.000 165.00000 1
531 2004 CONC SIDEWALKS (6") SY     222.000 67.81982 5
531 2005 CURB RAMPS (TY 1) EA     76.000 1,742.94237 13
531 2006 CURB RAMPS (TY 2) EA 2.000 2,000.00000 24.000 1,513.74750 7
531 2007 CURB RAMPS (TY 3) EA     10.000 1,750.00000 1
531 2008 CURB RAMPS (TY 4) EA     15.000 1,898.48667 3
531 2009 CURB RAMPS (TY 6) EA     10.000 1,400.00000 1
531 2010 CURB RAMPS (TY 7) EA     40.000 1,573.16350 11
531 2011 CURB RAMPS (TY 8) EA     17.000 1,617.64706 4
531 2012 CURB RAMPS (TY 9) EA     22.000 1,400.00000 2
531 2013 CURB RAMPS (TY 20) EA     10.000 1,750.00000 1
531 2014 CURB RAMPS (TY 22) EA     10.000 1,750.00000 1
531 2015 CONC SIDEWALKS (4") SY     883.000 63.64700 11
531 2017 CURB RAMPS (TY 21) EA     13.000 1,436.53846 3
531 2022 CURB RAMPS (TY 7) (MOD) EA     1.000 2,000.00000 1
531 2024 CONC SIDEWALK (5") SY     150.000 125.00000 1
531 2029 CONC SIDEWALKS (5") LF     230.000 29.13043 2
531 2035 CONCRETE SIDEWALKS (5') (4") LF     400.000 25.00000 1
531 2040 CURB RAMPS (TY 5) EA     9.000 2,362.57778 4
531 2041 CURB RAMPS (TY 10) EA     21.000 1,439.52381 2
531 2054 CURB RAMPS SY     44.000 350.00000 1
531 2062 CURB RAMPS (TY 21) (MOD) EA     5.000 3,135.26000 1
531 2084 CONC SIDEWALKS (4') (4") LF     400.000 22.00000 1
531 2103 CONC SIDEWALKS (6") (RMA) SY     550.000 10.00000 1
531 6001 CONC SIDEWALKS (4") SY 25.000 40.00000 38.000 60.52632 2
531 6003 CONC SIDEWALKS (6") SY     11.000 80.00000 1
531 6004 CURB RAMPS (TY 1) EA     4.000 1,650.00000 1
531 6005 CURB RAMPS (TY 2) EA     4.000 1,650.00000 1
531 6011 CURB RAMPS (TY 8) EA     4.000 2,150.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF 31,070.000 0.25000 2,396,214.000 0.15988 16
536 2001 CONC MEDIAN LF     100.000 61.41000 1
536 2002 CONC MEDIAN SY     273.000 75.22388 4
536 2004 CONC DIRECTIONAL ISLAND SY     291.000 81.45790 2
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 7,573.000 16.58385 54,067.640 17.55056 57
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF 1,170.000 20.07265 8,419.000 17.58800 17
540 2003 MTL THRIE - BEAM GD FEN (TIM POST) LF     1,210.000 11.66942 8
540 2004 MTL THRIE - BEAM GD FEN (STEEL POST) LF     375.000 3.33333 2
540 2005 TERMINAL ANCHOR SECTION EA 1.000 750.00000 127.000 311.41307 23
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     35,561.000 2.24324 18
540 2008 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     855.000 1.50234 6
540 2009 TERMINAL ANCHOR SECTION ADJUSTMENT EA     57.000 58.68421 4
540 2010 TRANSITION ADJUSTMENT EA     38.000 615.13158 10
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 20.000 1,850.00000 303.000 1,012.05825 37
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     31.000 246.50000 6
540 2013 MTL BEAM GD FEN TRANS (T101) EA     146.000 416.72747 15
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     269.000 13.62082 4
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF 25.000 70.00000 1,775.000 13.15493 6
540 2016 MTL BM GD FN TRANS (THRIE) (RND TIM POST EA     64.000 777.21875 6
540 2017 MTL W - BEAM GD FEN (ROUND TIMBER POST) LF     11,700.000 19.50000 1
540 2019 MTL BEAM GD FEN TRANS (THRIE) (STL POST EA     24.000 983.33333 2
540 2021 MTL BEAM GD FEN TRANS (T101) (STL POST) EA     75.000 50.00000 2
540 2022 MTL W - BEAM GD FEN (STL POST) RADIUS RAIL LF 150.000 13.50000 600.000 19.20833 4
540 2025 TERMINAL ANCHOR SECTION (DRWY) (SPCL) EA     8.000 188.12500 3
540 2027 MTL W - BEAM GD FEN (STEEL POST) (TY IV) LF     1,437.500 36.85000 1
540 2030 MTL BEAM GD FEN (MOVE AND RESET) LF     300.000 2.33333 3
540 2031 MTL BM GD FN (REMOVE & RESET) LF     5,612.000 7.38150 4
540 2032 MTL BM GD FN TRANSITION (REMOVE & RESET) EA     31.000 550.00000 3
540 2034 MTL W - BEAM GD FEN (SPECIAL) LF     125.000 25.00000 1
540 2036 DRIVEWAY TERMINAL ANCHOR SECTION EA 1.000 1,200.00000 7.000 178.85714 4
540 2037 MTL W - BEAM GD FEN (CRT POST) (SHRT RAD LF     260.000 14.03846 4
540 2038 MTL BM GD FN (TIM POST) (W - BEAM FURN) LF 200.000 4.00000 350.000 3.28571 4
540 2039 MTL BEAM GD FEN TRANS (THRIE - BEAM) (OPT1 EA     4.000 1,500.00000 1
540 2040 MTL BEAM GD FEN TRANS (THRIE - BEAM) (OPT2 EA     8.000 3,562.50000 2
540 2041 MTL W - BEAM GD FEN (STEEL POST) (OPT2) LF     18.750 38.96000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA 1.000 1,400.00000 132.000 749.58106 20
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF 200.000 16.40000 900.000 12.07500 10
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     46.000 871.91304 5
540 2047 MTL W - BEAM GD FEN (TIM POST) (RMA) LF     2,000.000 17.50000 1