AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Monday, February 8, 2016
ITEMS 529 2006 TO 540 2030
Items Items Bid Code Range
0100 - 0192
0204 - 0292
0305 - 0361
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
1000 - 1122
2144 - 2303
3000 - 3288
4001 - 4581
5009 - 5935
6000 - 6834
7000 - 7666
8020 - 8999
9054 - 9054
500 2001 - 502 6038
502 6039 - 529 2004
529 2006 - 540 2030
540 2031 - 550 2005
550 2012 - 560 6013
Item No Description Units January 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
529 2006 CONC CURB (MONO) (TY II) LF     709.500 10.85412 4
529 2007 CONC CURB (DOWEL) LF     2,314.500 23.16593 7
529 2009 CONCRETE CURB (SPECIAL) LF     470.000 40.74000 1
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF     358.000 25.63045 2
529 2011 CONC CURB & GUTTER (SAWTOOTH) LF     36.000 30.00000 1
529 2012 CONC CURB & GUTTER (TY A) (BARRIER) LF     10.000 65.00000 1
529 2013 CONC CURB (TY A) (BARRIER) LF     1,500.000 7.36000 1
529 2015 CONC CURB (TY I) (REINF) LF     310.000 30.64516 2
529 2019 CONC CURB & GUTTER (TY B) (MOUNTABLE) LF     100.000 35.00000 1
529 2032 CONC CURB (TY B) MOUNTABLE LF     40.000 61.00000 1
529 2069 CONC CURB AND GUTTER (TY I) (REINF) LF     140.000 17.00000 1
529 2070 CONCRETE CURB (TYPE U - TURN) (SPECIAL) LF     19.000 11.60000 1
529 6001 CONC CURB (TY I) LF     2,483.000 14.99970 7
529 6002 CONC CURB (TY II) LF 540.640 51.69429 792.640 43.18985 6
529 6005 CONC CURB (MONO) (TY II) LF     5,719.000 14.82357 14
529 6007 CONC CURB & GUTTER (TY I) LF 17.000 157.50000 17.000 157.50000 1
529 6008 CONC CURB & GUTTER (TY II) LF 98.000 84.00000 7,175.000 28.45555 10
529 6009 CONC CURB (DOWEL) (SLOTTED) LF     10.000 50.00000 1
529 6010 CONC CURB (U - TURN) LF     60.000 50.00000 1
529 6011 CONC CURB (DOWEL) LF     3,125.000 15.71200 4
530 2006 INTERSECTIONS (SURF TREAT) SY     22,445.000 1.84994 3
530 2008 DRIVEWAYS (ACP) EA     6.000 1,616.66667 2
530 2009 DRIVEWAYS (SURF TREAT) EA     65.000 349.84615 2
530 2010 DRIVEWAYS (CONC) SY     902.900 84.14553 5
530 2011 DRIVEWAYS (ACP) SY     606.000 61.26315 3
530 2012 DRIVEWAYS (SURF TREAT) SY     372.000 47.83468 2
530 2015 TURNOUTS (SURF TREAT) EA     33.000 1,043.63636 3
530 2017 TURNOUTS (ACP) SY     230.000 7.83000 1
530 2018 TURNOUTS (SURF TREAT) SY     450.000 14.75000 1
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     1,840.000 39.05000 1
530 2058 DRIVEWAYS (OTHER) EA     61.000 354.83607 3
530 6002 INTERSECTIONS (ACP) SY     1,479.000 23.00000 1
530 6003 INTERSECTIONS (SURF TREAT) SY     1,276.000 18.57000 1
530 6004 DRIVEWAYS (CONC) SY     626.200 73.51325 9
530 6005 DRIVEWAYS (ACP) SY 106.000 100.00000 5,477.830 35.84960 11
530 6006 DRIVEWAYS (SURF TREAT) SY     1,832.000 43.76255 4
530 6008 TURNOUTS (ACP) SY 6,056.000 17.00000 7,332.000 21.90562 3
530 6009 TURNOUTS (SURF TREAT) SY     2,009.000 35.06819 4
530 6016 DRIVEWAYS (BASE) SY     1,915.000 20.65582 5
531 2004 CONC SIDEWALKS (6") SY     217.000 68.11060 4
531 2005 CURB RAMPS (TY 1) EA     61.000 1,731.44164 9
531 2006 CURB RAMPS (TY 2) EA     23.000 1,514.34522 6
531 2007 CURB RAMPS (TY 3) EA     10.000 1,750.00000 1
531 2008 CURB RAMPS (TY 4) EA     10.000 1,750.00000 1
531 2009 CURB RAMPS (TY 6) EA     10.000 1,400.00000 1
531 2010 CURB RAMPS (TY 7) EA     29.000 1,631.34276 7
531 2011 CURB RAMPS (TY 8) EA     14.000 1,671.42857 2
531 2012 CURB RAMPS (TY 9) EA     20.000 1,400.00000 1
531 2013 CURB RAMPS (TY 20) EA     10.000 1,750.00000 1
531 2014 CURB RAMPS (TY 22) EA     10.000 1,750.00000 1
531 2015 CONC SIDEWALKS (4") SY     358.000 81.13212 7
531 2017 CURB RAMPS (TY 21) EA     11.000 1,443.18182 2
531 2022 CURB RAMPS (TY 7) (MOD) EA     1.000 2,000.00000 1
531 2024 CONC SIDEWALK (5") SY     150.000 125.00000 1
531 2029 CONC SIDEWALKS (5") LF     230.000 29.13043 2
531 2035 CONCRETE SIDEWALKS (5') (4") LF     400.000 25.00000 1
531 2040 CURB RAMPS (TY 5) EA     9.000 2,362.57778 4
531 2041 CURB RAMPS (TY 10) EA     21.000 1,439.52381 2
531 2054 CURB RAMPS SY     44.000 350.00000 1
531 6001 CONC SIDEWALKS (4") SY     2,096.000 40.17836 10
531 6002 CONC SIDEWALKS (5") SY     200.000 130.00000 1
531 6003 CONC SIDEWALKS (6") SY 3.000 105.00000 96.000 80.41667 5
531 6004 CURB RAMPS (TY 1) EA 5.000 3,150.00000 35.000 2,928.17143 6
531 6005 CURB RAMPS (TY 2) EA     14.000 1,810.00000 4
531 6008 CURB RAMPS (TY 5) EA 1.000 3,000.00000 3.000 2,564.00000 2
531 6010 CURB RAMPS (TY 7) EA 3.000 3,150.00000 11.000 2,314.36364 4
531 6011 CURB RAMPS (TY 8) EA     12.000 2,157.50000 4
531 6012 CURB RAMPS (TY 9) EA     2.000 2,000.00000 1
531 6016 CURB RAMPS (TY 21) EA 1.000 3,150.00000 1.000 3,150.00000 1
531 6030 CURB RAMPS (TY 21) SY     2.000 2,000.00000 1
531 6035 CURB RAMPS SY     170.000 95.61471 2
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     1,238,867.000 0.19095 9
533 6001 RUMBLE STRIPS (SHOULDER) LF 17,438.000 0.18000 259,854.000 0.19768 5
533 6002 RUMBLE STRIPS (CENTERLINE) LF 9,093.000 0.18000 283,292.000 0.36947 10
536 2002 CONC MEDIAN SY     86.000 102.32558 3
536 2004 CONC DIRECTIONAL ISLAND SY     100.000 100.00000 1
536 6002 CONC MEDIAN SY 30.000 84.00000 192.000 118.72396 3
536 6004 CONC DIRECTIONAL ISLAND SY     310.000 97.51613 4
540 2001 MTL W - BEAM GD FEN (TIM POST) LF     34,709.500 17.87003 37
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     5,890.000 19.01993 13
540 2003 MTL THRIE - BEAM GD FEN (TIM POST) LF     440.000 15.50000 5
540 2004 MTL THRIE - BEAM GD FEN (STEEL POST) LF     125.000 2.00000 1
540 2005 TERMINAL ANCHOR SECTION EA     86.000 318.86047 14
540 2007 MTL W - BEAM GD FEN ADJUSTMENT LF     4,419.000 4.28377 12
540 2008 MTL THRIE - BEAM GD FEN ADJUSTMENT LF     354.000 0.77684 4
540 2009 TERMINAL ANCHOR SECTION ADJUSTMENT EA     2.000 62.50000 2
540 2010 TRANSITION ADJUSTMENT EA     32.000 403.90625 8
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA     217.000 968.54839 25
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     22.000 106.43182 4
540 2013 MTL BEAM GD FEN TRANS (T101) EA     82.000 424.39024 9
540 2014 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF     225.000 5.33333 3
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF     1,575.000 12.92063 5
540 2016 MTL BM GD FN TRANS (THRIE) (RND TIM POST EA     52.000 820.19231 4
540 2017 MTL W - BEAM GD FEN (ROUND TIMBER POST) LF     11,700.000 19.50000 1
540 2019 MTL BEAM GD FEN TRANS (THRIE) (STL POST EA     20.000 880.00000 1
540 2021 MTL BEAM GD FEN TRANS (T101) (STL POST) EA     25.000 50.00000 1
540 2022 MTL W - BEAM GD FEN (STL POST) RADIUS RAIL LF     500.000 21.05000 3
540 2025 TERMINAL ANCHOR SECTION (DRWY) (SPCL) EA     1.000 400.00000 1
540 2027 MTL W - BEAM GD FEN (STEEL POST) (TY IV) LF     1,437.500 36.85000 1
540 2030 MTL BEAM GD FEN (MOVE AND RESET) LF     300.000 2.33333 3