AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Wednesday, April 1, 2015
ITEMS 770 2002 TO 774 2009
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
1000 - 1122
2144 - 2303
3035 - 3288
4002 - 4581
5049 - 5935
6000 - 6986
7000 - 7665
8020 - 8999
700 2001 - 735 2007
735 2008 - 738 2143
738 2144 - 751 2010
751 2015 - 770 2001
770 2002 - 774 2009
774 2010 - 788 2004
Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 680.000 9.35176 3,611.000 10.58447 45
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 266.250 12.38592 3,134.000 13.02703 47
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 2,925.000 12.19658 18,539.000 25.35522 39
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 1,680.000 24.71310 3,856.000 28.84021 37
770 2006 REALIGN POSTS EA 1,175.000 12.26809 12,021.000 11.47581 44
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 214.000 1.43972 454.000 4.14749 34
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 21.000 19.51429 319.000 17.91169 36
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 84.000 1,818.79226 890.000 1,730.60497 42
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 115.000 695.65217 1,159.000 536.25484 46
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 7,475.000 13.31104 82,426.000 14.59970 46
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 780.000 41.66667 10,396.000 24.59619 46
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA 85.000 2.90588 985.000 7.06904 9
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 52.000 30.26654 991.000 57.02847 36
770 2016 REPAIR SINGLE GUARDRAIL TERMINAL EA 160.000 1,950.21563 160.000 1,950.21563 2
770 2017 REPAIR RAIL ELEMENT (T4S) LF 175.000 10.00000 425.000 10.00000 2
770 2018 REM / REPL TIMBER POST W / O CONC FND EA 400.000 65.00000 10,830.000 13.31948 11
770 2019 REM / REPL STEEL POST W / O CONC FND EA 50.000 5.00000 750.000 58.08000 10
770 2020 REM / REPL TIMBER POST W / CONC FND EA 50.000 5.00000 363.000 14.46832 9
770 2021 REM / REPL STEEL POST W / CONC FND EA 50.000 5.00000 653.000 93.37366 10
770 2022 REM & RESET SGT IMPACT HEAD EA 75.000 144.19467 1,659.000 168.37408 31
770 2023 REPLACE SGT OBJECT MARKER EA 40.000 58.80000 716.000 26.13757 38
770 2024 REPLACE SGT CABLE ANCHOR EA 42.000 71.47619 653.990 57.68896 36
770 2025 REPLACE SGT CABLE ASSEMBLY EA 54.000 88.96296 826.000 80.27361 39
770 2026 REPLACE SGT STRUT EA 18.000 55.77778 359.990 42.41021 41
770 2027 REMOVE & REPLACE BLOCKOUT EA 2,530.000 1.07103 10,495.000 5.25559 34
770 2028 REPLACE HINGED TOP SGT STEEL POST EA 5.000 58.58000 246.000 104.55244 9
770 2029 REPAIR RAIL ELEMENT (W - BEAM FURNISHED) LF     6,935.000 4.69474 11
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF 10.000 9.02000 10.000 9.02000 1
770 2031 INSTALL BLOCKOUT EA 20.000 17.00000 90.000 22.53111 5
770 2032 REMOVE AND RESET SGT IMPACT HEAD EA     24.000 50.00000 1
770 2033 INSTALL BLOCKOUT EA 25.000 50.00000 863.000 10.10239 6
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA 17.000 100.54471 363.000 169.30375 13
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 400.000 72.00375 4,812.000 18.48086 31
770 2036 REPL SGT IMPACT HEAD (FURNISHED) EA     35.000 128.17143 5
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA 20.000 10.25000 78.000 8.78205 4
770 2038 INSTALL BLOCKOUTS (FURNISHED) EA     62.000 2.60000 3
770 2040 RAISE RAIL ELEMENT LF 60.000 1.45000 2,287.000 3.54482 14
770 2050 REM / REP TIM / STL POST W / O CONC FND (FURN EA     20.000 40.00000 1
770 2051 RESET HINGED TOP SGT STL POST EA     80.000 50.00000 2
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 33,325.000 12.77592 33,325.000 12.77592 4
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 251.000 15.41434 251.000 15.41434 4
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF 62.000 2.93548 62.000 2.93548 3
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF 290.000 47.89655 290.000 47.89655 2
770 6006 RAISE RAIL ELEMENT LF 151.000 4.53642 151.000 4.53642 3
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA 1,870.000 36.09893 1,870.000 36.09893 5
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA 1,010.000 29.60396 1,010.000 29.60396 5
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 35.000 50.00000 35.000 50.00000 1
770 6017 REALIGN POSTS EA 1,100.000 8.47727 1,100.000 8.47727 4
770 6018 INSTALL BLOCKOUT (TYPE SPECIFIED) EA 380.000 5.00000 380.000 5.00000 1
770 6019 REMOVE & REPLACE BLOCKOUT EA 315.000 12.85714 315.000 12.85714 3
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 6,600.000 21.97727 6,600.000 21.97727 5
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 660.000 55.46212 660.000 55.46212 5
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA 217.000 9.36866 217.000 9.36866 4
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 32.000 17.84375 32.000 17.84375 4
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 137.000 2,470.07299 137.000 2,470.07299 5
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 100.000 729.60000 100.000 729.60000 5
770 6029 REM & RESET SGT IMPACT HEAD EA 138.000 199.27536 138.000 199.27536 4
770 6030 REPLACE SGT CABLE ASSEMBLY EA 16.000 31.62500 16.000 31.62500 2
770 6031 REPLACE SGT CABLE ANCHOR EA 55.000 81.90909 55.000 81.90909 3
770 6032 REPLACE SGT STRUT EA 21.000 47.90476 21.000 47.90476 3
770 6033 REPLACE SGT OBJECT MARKER EA 36.000 70.33333 36.000 70.33333 4
770 6034 REPAIR RAIL ELEMENT (W - BEAM FURNISHED LF 1,475.000 15.00000 1,475.000 15.00000 1
770 6037 REPAIR RAIL ELEMENT (CURVED RAIL) (FURN LF 75.000 10.00000 75.000 10.00000 1
770 6045 REM & REPLACE BLOCKOUTS (FURNISHED) EA 100.000 25.00000 100.000 25.00000 1
770 6046 REM & RESET SGT IMPACT HEAD (FURNISHED EA 25.000 100.00000 25.000 100.00000 1
770 6052 REPAIR STEEL POST WITH BASE PLATE EA 11.000 17.81818 11.000 17.81818 2
771 6001 REPLACE POSTS (TL - 3) EA 120.000 38.00000 120.000 38.00000 1
771 6002 REPLACE POSTS (TL - 4) EA 3,250.000 87.58462 3,250.000 87.58462 3
771 6003 CABLE SPLICE / TURNBUCKLE (TL - 3) EA 1.000 105.00000 1.000 105.00000 1
771 6004 CABLE SPLICE / TURNBUCKLE (TL - 4) EA 35.000 126.42857 35.000 126.42857 3
771 6005 REPAIR CONCRETE FOUNDATION (TL - 3) EA 1.000 20.00000 1.000 20.00000 1
771 6006 REPAIR CONCRETE FOUNDATION (TL - 4) EA 130.000 11.30769 130.000 11.30769 3
771 6007 REPR OR REPLC CABLE BARR TERM SEC (TL - 3 EA 1.000 45.00000 1.000 45.00000 1
771 6008 REPR OR REPLC CABLE BARR TERM SEC (TL - 4 EA 50.000 210.00000 50.000 210.00000 3
771 6009 REPLACE CABLE (TL - 3) LF 90.000 2.50000 90.000 2.50000 1
771 6010 REPLACE CABLE (TL - 4) LF 1,020.000 2.35294 1,020.000 2.35294 3
771 6012 REPLACE POST HARDWARE (TL - 4) EA 150.000 10.00000 150.000 10.00000 1
772 2001 POST AND CABLE FENCE (REMOVAL) LF 20.000 1.52000 1,280.000 3.05109 5
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA 2.000 132.00000 11.000 41.63636 3
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF 50.000 35.00000 49,062.000 3.25530 6
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA 1.000 75.00000 53.000 34.05660 3
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA 55.000 48.18182 565.000 30.44248 7
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA 1.000 75.00000 96.000 10.00000 5
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF 200.000 7.75500 12,700.000 2.07882 7
772 2009 POST AND CABLE FENCE (REPAIR) LF 125.000 7.00000 125.000 7.00000 1
772 6001 POST AND CABLE FENCE (REMOVAL) LF 5.000 5.00000 5.000 5.00000 1
772 6002 POST AND CABLE FENCE (REMV CONC ANCHOR EA 2.000 10.00000 2.000 10.00000 1
772 6003 POST AND CABLE FENCE (NEW INSTALLATION LF 5.000 23.00000 5.000 23.00000 1
772 6004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA 1.000 25.00000 1.000 25.00000 1
772 6005 POST AND CABLE FENCE (REMV / REPL POSTS EA 1.000 18.00000 1.000 18.00000 1
772 6007 POST AND CABLE FENCE (REMV / REPL CABLE LF 1.000 4.00000 1.000 4.00000 1
774 2001 REMOVE AND REPLACE (TRACC) EA 2.000 5,562.39000 25.000 3,228.99120 9
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA 2.000 8,529.23500 13.000 5,312.19000 5
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA 3.000 14,141.71000 17.000 9,836.77235 10
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA 3.000 19,181.14333 7.000 14,920.49000 6
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA 10.000 216.00000 191.000 301.91058 10
774 2006 REPAIR (TRACC) EA 1.000 1,204.45000 33.000 1,172.86212 7
774 2007 REPAIR (TRACC) LF 50.000 138.54000 463.000 133.85529 6
774 2008 REPAIR (WIDE TRACC) EA 1.000 1,405.24000 3.000 801.74667 2
774 2009 REPAIR (WIDE TRACC) LF 60.000 290.00000 76.000 331.57895 3