Tabulation of Bids for Project BR 2022(272)
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | CHEROKEE | Let Date: | 01/06/22 |
Type: | BRIDGE REPLACEMENT | Seq No: | 3008 |
Time: | 153 WORKING DAYS | Project ID: | BR 2022(272) |
Highway: | SH 135 | Contract #: | 01223008 |
Length: | 0.000 | CCSJ: | 0378-06-022 |
Limits: | |||
From: | AT MUD CREEK | Check: | $84,000 |
To: | STR #007, S OF TROUP | Misc Cost: |
Estimate | $4,189,280.80 | % Over/Under | Company |
Bidder 1 | $4,193,458.94 | +0.10% | HIGHWAY 19 CONSTRUCTION LLC |
Bidder 2 | $4,274,418.65 | +2.03% | LONGVIEW BRIDGE AND ROAD, LTD. |
Bidder 3 | $4,597,864.33 | +9.75% | EAST TEXAS BRIDGE, INC. |
Bidder 4 | $4,676,257.40 | +11.62% | A. L. HELMCAMP, INC. |
Bidder 5 | $4,911,502.60 | +17.24% | NEW WORLD CONTRACTING, LLC |
Bidder 6 | $5,060,245.47 | +20.79% | L. S. EQUIPMENT CO., INC. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 25.800 | 4,000.00 | 1 2 3 4 5 6 | 2,000.000 6,200.000 9,000.000 8,000.000 993.000 4,850.000 |
1056020 | REMOVING STAB BASE & ASPH PAV (12") | SY | 5,761.000 | 10.00 | 1 2 3 4 5 6 | 5.000 3.450 10.000 7.000 11.000 8.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 500.000 | 9.50 | 1 2 3 4 5 6 | 25.000 18.000 12.000 35.000 16.000 20.000 |
1326006 | EMBANKMENT (FINAL)(DENS CONT)(TY C) | CY | 14,742.000 | 15.00 | 1 2 3 4 5 6 | 17.000 12.250 15.000 15.000 15.000 27.000 |
1606003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 13,519.000 | 1.50 | 1 2 3 4 5 6 | 3.000 2.750 2.000 1.600 7.000 1.500 |
1646054 | BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | SY | 13,519.000 | 0.75 | 1 2 3 4 5 6 | 0.660 1.000 0.770 1.000 1.000 0.500 |
1646055 | BONDED FBR MTRX SEED (TEMP)(WARM) | SY | 6,760.000 | 0.65 | 1 2 3 4 5 6 | 0.660 1.100 0.700 0.950 1.000 0.500 |
1646056 | BONDED FBR MTRX SEED (TEMP)(COOL) | SY | 6,760.000 | 0.65 | 1 2 3 4 5 6 | 0.660 1.100 0.700 0.950 1.000 0.500 |
1686001 | VEGETATIVE WATERING | MG | 297.000 | 10.00 | 1 2 3 4 5 6 | 10.000 4.000 10.000 30.000 30.000 0.010 |
2756001 | CEMENT | TON | 114.000 | 187.00 | 1 2 3 4 5 6 | 220.000 240.000 175.000 210.000 208.000 200.000 |
2756019 | CEMENT TREAT (SUBGRADE)(6") | SY | 8,469.000 | 2.10 | 1 2 3 4 5 6 | 4.000 2.250 3.000 8.000 5.000 7.000 |
3166406002 | ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) | GAL | 3,425.000 | 3.25 | 1 2 3 4 5 6 | 4.070 4.450 4.500 5.000 5.000 6.000 |
3166407002 | AGGR (TY-PD GR-3 OR TY-PL GR-3) | CY | 82.000 | 117.00 | 1 2 3 4 5 6 | 250.000 200.000 250.000 200.000 241.000 150.000 |
4006005 | CEM STABIL BKFL | CY | 276.800 | 165.00 | 1 2 3 4 5 6 | 180.000 255.000 175.000 210.000 197.000 300.000 |
4166004 | DRILL SHAFT (36 IN) | LF | 1,807.000 | 250.00 | 1 2 3 4 5 6 | 250.000 305.000 270.000 185.000 339.000 200.000 |
4206013 | CL C CONC (ABUT) | CY | 99.600 | 925.00 | 1 2 3 4 5 6 | 745.000 965.000 1,050.000 1,500.000 894.000 1,300.000 |
4206029 | CL C CONC (CAP) | CY | 148.800 | 1,100.00 | 1 2 3 4 5 6 | 739.000 1,025.000 1,050.000 1,200.000 984.000 1,400.000 |
4206037 | CL C CONC (COLUMN) | CY | 67.300 | 1,100.00 | 1 2 3 4 5 6 | 800.000 985.000 1,100.000 1,400.000 1,196.000 1,300.000 |
4226001 | REINF CONC SLAB | SF | 26,040.000 | 22.00 | 1 2 3 4 5 6 | 20.000 17.000 22.000 24.000 22.000 18.000 |
4226015 | APPROACH SLAB | CY | 128.400 | 600.00 | 1 2 3 4 5 6 | 500.000 480.000 660.000 650.000 583.000 690.000 |
4256035 | PRESTR CONC GIRDER (TX28) | LF | 3,075.000 | 185.00 | 1 2 3 4 5 6 | 164.000 160.000 160.000 180.000 254.000 225.000 |
4326033 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 2,242.000 | 130.00 | 1 2 3 4 5 6 | 150.000 160.000 155.000 110.000 72.000 195.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 82.000 | 475.00 | 1 2 3 4 5 6 | 450.000 525.000 530.000 610.000 475.000 550.000 |
4506006 | RAIL (TY T223) | LF | 1,336.000 | 100.00 | 1 2 3 4 5 6 | 115.000 90.000 110.000 140.000 111.000 150.000 |
4546004 | ARMOR JOINT (SEALED) | LF | 228.000 | 85.00 | 1 2 3 4 5 6 | 180.000 84.000 95.000 75.000 63.000 100.000 |
4966010 | REMOV STR (BRIDGE 100 - 499 FT LENGTH) | EA | 2.000 | 65,000.00 | 1 2 3 4 5 6 | 60,000.000 55,000.000 90,000.000 65,000.000 100,000.000 125,000.000 |
5006001 | MOBILIZATION | LS | 1.000 | 345,215.30 | 1 2 3 4 5 6 | 400,000.000 400,000.000 350,000.000 365,000.000 400,000.000 450,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 8.000 | 4,500.00 | 1 2 3 4 5 6 | 1,500.000 3,200.000 3,000.000 15,000.000 5,323.000 1,300.000 |
5066002002 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 416.000 | 30.00 | 1 2 3 4 5 6 | 35.000 34.000 34.500 34.000 30.000 40.000 |
5066011002 | ROCK FILTER DAMS (REMOVE) | LF | 416.000 | 8.25 | 1 2 3 4 5 6 | 10.000 8.000 8.000 10.000 8.000 12.000 |
5066029002 | EARTHWORK (EROSN & SEDMT CONT, IN VEH) | CY | 40.000 | 22.00 | 1 2 3 4 5 6 | 30.000 34.000 40.000 75.000 18.000 60.000 |
5066030002 | BACKHOE WORK (EROSION & SEDMT CONT) | HR | 20.000 | 69.00 | 1 2 3 4 5 6 | 50.000 250.000 100.000 75.000 151.000 90.000 |
5066038002 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 3,017.000 | 2.75 | 1 2 3 4 5 6 | 2.750 3.200 3.200 3.500 3.000 3.500 |
5066039002 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 3,017.000 | 0.65 | 1 2 3 4 5 6 | 1.000 0.650 0.650 1.000 1.000 1.000 |
5066046002 | TRACKHOE WORK (EROSION & SEDMT CONT) | HR | 20.000 | 90.00 | 1 2 3 4 5 6 | 100.000 250.000 100.000 115.000 151.000 125.000 |
5336001 | RUMBLE STRIPS (SHOULDER) | LF | 3,520.000 | 0.17 | 1 2 3 4 5 6 | 1.000 1.100 2.000 2.000 1.000 0.500 |
5336002 | RUMBLE STRIPS (CENTERLINE) | LF | 1,760.000 | 0.19 | 1 2 3 4 5 6 | 1.000 1.100 2.000 4.000 3.000 1.000 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 800.000 | 21.00 | 1 2 3 4 5 6 | 22.000 27.500 28.000 25.000 25.000 30.000 |
5406006001 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 8.000 | 1,500.00 | 1 2 3 4 5 6 | 1,875.000 1,850.000 2,000.000 1,800.000 1,964.000 2,500.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 1,000.000 | 2.50 | 1 2 3 4 5 6 | 2.000 2.200 2.250 2.500 2.000 5.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 8.000 | 2,650.00 | 1 2 3 4 5 6 | 2,795.000 3,200.000 3,200.000 3,100.000 3,086.000 4,500.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 8.000 | 270.00 | 1 2 3 4 5 6 | 250.000 220.000 225.000 230.000 224.000 2,000.000 |
6586014 | INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | EA | 12.000 | 22.00 | 1 2 3 4 5 6 | 25.000 16.500 20.000 39.000 21.000 100.000 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 20.000 | 34.00 | 1 2 3 4 5 6 | 29.000 5.500 30.000 32.000 28.000 100.000 |
6666170007 | REFL PAV MRK TY II (W) 4" (SLD) | LF | 1,400.000 | 0.15 | 1 2 3 4 5 6 | 1.000 0.550 0.550 0.550 1.000 0.750 |
6666207007 | REFL PAV MRK TY II (Y) 4" (SLD) | LF | 1,400.000 | 0.15 | 1 2 3 4 5 6 | 1.000 0.550 0.550 0.550 1.000 0.750 |
6666303007 | RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | LF | 5,160.000 | 0.33 | 1 2 3 4 5 6 | 1.000 1.100 1.100 1.100 1.000 1.500 |
6666315007 | RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | LF | 5,160.000 | 0.33 | 1 2 3 4 5 6 | 1.000 1.100 1.100 1.100 1.000 1.500 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 64.000 | 3.10 | 1 2 3 4 5 6 | 1.000 11.000 11.000 11.000 5.000 10.000 |
6786001 | PAV SURF PREP FOR MRK (4") | LF | 2,800.000 | 0.05 | 1 2 3 4 5 6 | 1.000 0.280 0.300 0.300 1.000 0.500 |
30776001 | SP MIXES SP-B PG64-22 | TON | 3,658.000 | 98.00 | 1 2 3 4 5 6 | 123.000 110.000 123.000 125.000 130.000 125.000 |
30776022 | SP MIXES SP-C SAC-A PG70-22 | TON | 897.000 | 110.00 | 1 2 3 4 5 6 | 129.000 115.000 135.000 145.000 145.000 125.000 |
30776075 | TACK COAT | GAL | 3,325.000 | 2.60 | 1 2 3 4 5 6 | 2.700 4.000 3.750 4.500 3.000 5.000 |
50266002001 | ASBESTOS ABATEMENT (OTHER) | LF | 325.000 | 65.00 | 1 2 3 4 5 6 | 50.000 45.000 40.000 45.000 168.000 100.000 |
60016001 | PORTABLE CHANGEABLE MESSAGE SIGN | DAY | 42.000 | 85.00 | 1 2 3 4 5 6 | 100.000 100.000 150.000 265.000 208.000 100.000 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 5.000 | 15,000.00 | 1 2 3 4 5 6 | 10,000.000 16,500.000 16,000.000 10,000.000 22,440.000 100.000 |
61856002002 | TMA (STATIONARY) | DAY | 20.000 | 150.00 | 1 2 3 4 5 6 | 200.000 125.000 150.000 280.000 208.000 200.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 4.000 | 125.00 | 1 2 3 4 5 6 | 500.000 125.000 200.000 250.000 5,610.000 250.000 |