Tabulation of Bids for Project STP 2022(235)HES
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | BRAZOS | Let Date: | 01/06/22 |
Type: | INSTALL RAISED MEDIAN | Seq No: | 3016 |
Time: | 111 WORKING DAYS | Project ID: | STP 2022(235)HES |
Highway: | US 190 | Contract #: | 01223016 |
Length: | 0.001 | CCSJ: | 0049-09-090 |
Limits: | |||
From: | SH OSR | Check: | $37,000 |
To: | FM 2818 | Misc Cost: |
Estimate | $1,834,313.80 | % Over/Under | Company |
Bidder 1 | $1,448,126.90 | -21.05% | GRATIOT CONSTRUCTION, LTD. |
Bidder 2 | $1,704,217.00 | -7.09% | MASSANA, INC. |
Bidder 3 | $1,829,518.34 | -0.26% | SCR CIVIL CONSTRUCTION, LLC |
Bidder 4 | $1,980,023.02 | +7.94% | GLENN FUQUA, INC. |
Bidder 5 | $2,201,292.87 | +20.01% | ALTUS CONSTRUCTION LLC |
Bidder 6 | $3,090,196.10 | +68.47% | FNH CONSTRUCTION, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1506001 | BLADING | STA | 493.400 | 180.00 | 1 2 3 4 5 6 | 55.000 95.000 115.000 154.000 165.790 250.000 |
1606003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 165,301.000 | 0.40 | 1 2 3 4 5 6 | 0.150 0.100 0.500 0.500 1.090 6.000 |
1646001 | BROADCAST SEED (PERM) (RURAL) (SANDY) | SY | 165,301.000 | 0.20 | 1 2 3 4 5 6 | 0.080 0.120 0.140 0.140 0.110 0.300 |
1646009 | BROADCAST SEED (TEMP) (WARM) | SY | 82,653.000 | 0.20 | 1 2 3 4 5 6 | 0.070 0.100 0.100 0.130 0.090 0.300 |
1646011 | BROADCAST SEED (TEMP) (COOL) | SY | 82,653.000 | 0.20 | 1 2 3 4 5 6 | 0.070 0.100 0.100 0.130 0.090 0.300 |
1686001 | VEGETATIVE WATERING | MG | 1,653.000 | 10.00 | 1 2 3 4 5 6 | 10.000 1.000 25.000 20.000 45.000 30.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 1,705.000 | 470.00 | 1 2 3 4 5 6 | 327.500 350.000 400.000 500.000 376.060 450.000 |
5006001 | MOBILIZATION | LS | 1.000 | 168,380.00 | 1 2 3 4 5 6 | 128,250.000 168,233.180 150,000.000 150,000.000 212,211.320 300,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 8.000 | 5,500.00 | 1 2 3 4 5 6 | 6,300.000 4,500.000 7,800.000 2,800.000 9,947.410 8,500.000 |
5066002005 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 90.000 | 30.00 | 1 2 3 4 5 6 | 55.000 60.000 44.000 28.000 51.590 30.000 |
5066011005 | ROCK FILTER DAMS (REMOVE) | LF | 90.000 | 7.50 | 1 2 3 4 5 6 | 5.000 20.000 11.100 9.000 13.180 15.000 |
5066040005 | BIODEG EROSN CONT LOGS (INSTL) (8") | LF | 480.000 | 6.00 | 1 2 3 4 5 6 | 5.000 6.000 5.550 4.000 6.550 18.000 |
5066043005 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 480.000 | 1.00 | 1 2 3 4 5 6 | 1.000 1.500 2.000 1.000 1.900 9.000 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 300.000 | 28.00 | 1 2 3 4 5 6 | 35.000 35.000 37.000 30.100 38.080 25.000 |
5406006001 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 1.000 | 1,900.00 | 1 2 3 4 5 6 | 2,200.000 2,100.000 2,330.000 1,855.000 2,756.150 1,850.000 |
5406016001 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 1.000 | 1,440.00 | 1 2 3 4 5 6 | 1,850.000 1,800.000 2,165.000 1,370.000 3,508.100 1,850.000 |
5436002 | CABLE BARRIER SYSTEM (TL-4) | LF | 45,601.000 | 9.00 | 1 2 3 4 5 6 | 9.750 11.000 11.100 12.000 15.060 8.000 |
5436020 | CABLE BARRIER TERMINAL SECTION (TL-4) | EA | 36.000 | 2,400.00 | 1 2 3 4 5 6 | 2,900.000 6,500.000 2,700.000 1,100.000 2,408.020 3,500.000 |
6586064 | INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | EA | 4.000 | 29.00 | 1 2 3 4 5 6 | 68.000 50.000 75.000 100.000 198.950 100.000 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 4.000 | 5,500.00 | 1 2 3 4 5 6 | 2,500.000 4,500.000 5,000.000 7,500.000 6,631.600 12,500.000 |
61856002002 | TMA (STATIONARY) | DAY | 152.000 | 200.00 | 1 2 3 4 5 6 | 100.000 75.000 200.000 275.000 198.950 250.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 152.000 | 100.00 | 1 2 3 4 5 6 | 135.000 75.000 240.000 275.000 265.260 550.000 |