The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:LEELet Date:01/08/21
Type:FULL DEPTH REPAIR, LEVEL-UP & TOMSeq No:3209
Time:80 WORKING DAYSProject ID:C 211-2-28
Highway:US 77Contract #:01213209
Length:0.000CCSJ:0211-02-028
Limits: 
From:MILAM C/LCheck:$76,000
To:TANGELWOODMisc Cost:
Estimate$3,823,036.34% Over/UnderCompany
Bidder 1$2,887,592.71-24.47%BIG CREEK CONSTRUCTION, LTD.
Bidder 2$3,024,141.94-20.90%ANGEL BROTHERS HOLDINGS CORP.
Bidder 3$3,228,046.15-15.56%LONE STAR PAVING COMPANY
Bidder 4$3,356,930.12-12.19%KNIFE RIVER CORPORATION - SOUTH
Bidder 5$3,365,195.67-11.98%TEXAS MATERIALS GROUP, INC.
Bidder 6$3,662,200.30-4.21%HUNTER INDUSTRIES, LTD.
Bidder 7$3,833,993.66+0.29%AUSTIN MATERIALS, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1346001BACKFILL (TY A)STA492.370200.001
2
3
4
5
6
7
100.000
100.000
100.000
133.000
100.000
142.800
157.000
3476001002TOM (ASPHALT) PG 76-22TON994.000105.001
2
3
4
5
6
7
85.000
85.500
95.000
93.840
97.000
102.420
101.500
3476006002TOM - C (AGGREGATE) SAC - BTON15,034.000105.001
2
3
4
5
6
7
85.000
85.500
95.000
93.840
97.000
102.420
101.500
3516002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY17,408.00038.001
2
3
4
5
6
7
25.000
29.000
33.000
33.150
28.000
27.690
38.050
3516006FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")SY6,116.00055.001
2
3
4
5
6
7
50.000
48.000
48.000
53.800
48.000
46.140
57.500
3546022PLANE ASPH CONC PAV(0" TO 3")SY2,936.0002.501
2
3
4
5
6
7
3.000
2.250
3.000
1.280
2.850
3.610
3.450
3546023PLANE ASPH CONC PAV(0" TO 4")SY1,956.0003.501
2
3
4
5
6
7
3.000
2.250
3.000
1.850
3.250
3.080
2.700
3546048PLANE ASPH CONC PAV (3")SY2,089.0002.501
2
3
4
5
6
7
3.000
2.250
3.000
2.260
3.750
4.660
4.150
3546057PLANE ASPH CONC PAV (4")SY685.0003.001
2
3
4
5
6
7
3.000
2.250
3.000
5.400
4.000
6.760
7.600
3546064PLANE ASPH CONC PAV (2 1/2")SY558.0001.751
2
3
4
5
6
7
3.000
2.250
3.000
5.950
3.750
7.810
5.950
3546069PLANE ASPH CONC PAV (0"- 2 1/2")SY1,224.0002.501
2
3
4
5
6
7
3.000
2.250
3.000
2.750
3.100
4.660
2.800
4386004CLEANING AND SEALING EXIST JOINTS(CL7)LF1,277.00035.001
2
3
4
5
6
7
33.000
29.000
32.000
32.000
32.000
28.000
30.000
5006001MOBILIZATIONLS1.000216,000.001
2
3
4
5
6
7
32,500.000
140,000.000
76,000.000
97,900.000
170,000.000
325,999.210
82,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO5.0003,500.001
2
3
4
5
6
7
2,500.000
5,000.000
4,500.000
2,400.000
25,000.000
4,930.450
29,150.000
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF20.0001.001
2
3
4
5
6
7
5.000
10.000
1.000
10.000
10.000
10.000
10.000
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF20.0004.001
2
3
4
5
6
7
1.000
1.000
0.500
2.000
2.000
10.000
5.000
5066040002BIODEG EROSN CONT LOGS (INSTL) (8")LF20.0004.001
2
3
4
5
6
7
10.000
10.000
2.000
21.000
10.000
10.000
10.000
5066043002BIODEG EROSN CONT LOGS (REMOVE)LF20.0001.001
2
3
4
5
6
7
5.000
1.000
0.500
5.000
2.000
10.000
5.000
5336002RUMBLE STRIPS (CENTERLINE)LF47,737.0000.251
2
3
4
5
6
7
0.180
0.420
0.300
0.300
0.130
0.180
0.170
6626001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF31,656.0000.121
2
3
4
5
6
7
0.090
0.090
0.090
0.100
0.090
0.150
0.090
6626004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF129,289.0000.121
2
3
4
5
6
7
0.080
0.080
0.080
0.090
0.080
0.150
0.080
6626034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF132,617.0000.121
2
3
4
5
6
7
0.090
0.090
0.090
0.100
0.090
0.150
0.090
6626109WK ZN PAV MRK SHT TERM (TAB)TY WEA7,194.0001.051
2
3
4
5
6
7
1.000
0.700
0.750
1.000
1.080
1.410
1.100
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA5,211.0001.051
2
3
4
5
6
7
1.000
0.700
0.750
1.000
1.080
1.410
1.100
6626112WK ZN PAV MRK SHT TERM RMV (W)(4")LF1,931.0001.251
2
3
4
5
6
7
1.250
1.200
1.000
1.000
1.080
1.470
1.500
6626113WK ZN PAV MRK SHT TERM RMV (Y)(4")LF1,931.0001.251
2
3
4
5
6
7
1.250
1.200
1.000
1.000
1.080
1.470
1.500
6666300007RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF24,730.0000.451
2
3
4
5
6
7
0.260
0.260
0.260
0.280
0.260
0.300
0.270
6666312007RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF80.0004.001
2
3
4
5
6
7
1.000
1.000
3.000
1.060
1.000
0.300
1.000
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF103,606.0000.551
2
3
4
5
6
7
0.260
0.260
0.260
0.280
0.260
0.300
0.270
6666342007REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF101,006.0000.601
2
3
4
5
6
7
0.500
0.500
0.500
0.530
0.500
0.750
0.520
6726007REFL PAV MRKR TY I-CEA1,199.0005.001
2
3
4
5
6
7
3.500
3.350
3.500
3.560
3.350
3.000
3.350
6726009REFL PAV MRKR TY II-A-AEA1,226.0005.001
2
3
4
5
6
7
3.500
3.350
3.500
3.560
3.350
3.000
3.350
30766038D-GR HMA TY-D PG64-22 (LEVEL-UP)TON3,265.00090.001
2
3
4
5
6
7
90.000
69.000
87.000
86.450
70.330
79.160
115.500
30766066TACK COATGAL3,165.0003.501
2
3
4
5
6
7
2.500
2.700
2.500
4.800
3.750
2.960
7.550
30856001UNDERSEAL COURSEGAL56,727.0003.001
2
3
4
5
6
7
2.500
2.600
2.750
3.250
2.750
2.960
3.400
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY198.00080.001
2
3
4
5
6
7
50.000
50.000
50.000
90.000
85.000
302.760
70.000
61856002002TMA (STATIONARY)DAY198.000200.001
2
3
4
5
6
7
100.000
165.000
75.000
240.000
250.000
302.760
241.000
61856003002TMA (MOBILE OPERATION)HR48.00065.001
2
3
4
5
6
7
50.000
165.000
50.000
68.000
165.000
100.920