Tabulation of Bids for Project STP 2019(504)HES

Last Update: Friday, May 03, 2019
Text version of this page
County:CLAYLet Date:02/05/19
Type:PROVIDE ADDITIONAL PAVED SURFACE WIDTHSeq No:3020
Time:170 WORKING DAYSProject ID:STP 2019(504)HES
Highway:FM 174Contract #:02193020
Length:4.454CCSJ:0137-10-022
Limits: 
From:0.965 MI EAST OF SH 148Check:$41,000
To:1.965 MI EAST OF SH 148Misc Cost:$8,000.00
Estimate$2,104,517.25% Over/UnderCompany
Bidder 1$2,328,204.18+10.63%BLYTHE CONSTRUCTION, INC.
Bidder 2$2,579,868.44+22.59%JAGOE-PUBLIC COMPANY
Bidder 3$2,740,963.67+30.24%A. L. HELMCAMP, INC.
Bidder 4$2,770,273.30+31.63%AUSTIN BRIDGE & ROAD SERVICES, LP
Bidder 5$3,085,717.00+46.62%FNH CONSTRUCTION, LLC
Bidder 6$3,117,178.07+48.12%TEXAS MATERIALS GROUP, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA7.0002,000.001
2
3
4
5
6
3,000.000
12,000.000
4,000.000
12,500.000
15,000.000
0.010
1106001EXCAVATION (ROADWAY)CY1,547.00010.001
2
3
4
5
6
24.000
8.500
19.000
20.000
20.000
15.000
1326003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY7,253.00020.001
2
3
4
5
6
17.500
19.000
27.000
23.000
30.000
22.000
1646009BROADCAST SEED (TEMP) (WARM)SY20,263.0000.101
2
3
4
5
6
0.100
0.150
0.120
0.140
1.000
0.150
1646011BROADCAST SEED (TEMP) (COOL)SY20,263.0000.101
2
3
4
5
6
0.110
0.150
0.120
0.140
1.000
0.150
1646035DRILL SEEDING (PERM) (RURAL) (CLAY)SY40,528.0000.101
2
3
4
5
6
0.150
0.190
0.150
0.180
1.000
0.200
1686001VEGETATIVE WATERINGMG342.00025.001
2
3
4
5
6
30.000
65.000
22.000
52.000
50.000
52.000
2756001CEMENTTON241.000155.001
2
3
4
5
6
145.000
107.000
170.000
190.000
185.000
165.000
2756010CEMENT TREAT (SUBGRADE) (8")SY22,391.0003.001
2
3
4
5
6
4.000
4.500
7.000
2.850
4.500
6.000
3146010EMULS ASPH (EROSN CONT)(SS-1)GAL4,862.0002.751
2
3
4
5
6
2.000
3.150
4.000
2.850
6.000
4.500
3406011D-GR HMA(SQ) TY-B PG64-22TON4,460.00075.001
2
3
4
5
6
63.000
71.500
88.000
78.000
92.500
95.000
3416064D-GR HMA TY-D PG 70-22 (LEVEL-UP)TON613.00070.001
2
3
4
5
6
100.000
98.000
110.000
105.000
110.000
110.000
3446122001SUPERPAVE MIXTURES SP-D PG70-22TON6,415.00080.001
2
3
4
5
6
80.000
84.500
93.000
89.000
95.000
110.000
3516004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY1,100.00040.001
2
3
4
5
6
47.000
49.000
50.000
65.000
65.000
63.000
3546021PLANE ASPH CONC PAV(0" TO 2")SY1,244.0003.001
2
3
4
5
6
3.000
6.840
4.000
6.000
10.000
5.000
4006005CEM STABIL BKFLCY157.000150.001
2
3
4
5
6
190.000
157.890
120.000
150.000
250.000
115.000
4006006CUT & RESTORING PAVSY151.000100.001
2
3
4
5
6
85.000
85.910
140.000
85.000
150.000
135.000
4026001TRENCH EXCAVATION PROTECTIONLF145.00020.001
2
3
4
5
6
10.000
15.790
16.000
15.000
3.000
16.000
4036001TEMPORARY SPL SHORINGSF329.00020.001
2
3
4
5
6
85.000
73.680
45.000
85.000
40.000
43.000
4326001RIPRAP (CONC)(4 IN)CY10.000400.001
2
3
4
5
6
690.000
473.670
560.000
650.000
550.000
600.000
4326026RIPRAP (STONE COMMON)(DRY)(18 IN)CY23.000130.001
2
3
4
5
6
265.000
231.570
230.000
310.000
185.000
215.000
4606002CMP (GAL STL 18 IN)LF24.00060.001
2
3
4
5
6
53.000
57.890
56.000
55.000
85.000
52.000
4626019CONC BOX CULV (8 FT X 4 FT)LF112.000600.001
2
3
4
5
6
960.000
710.500
800.000
700.000
850.000
760.000
4626057CONC BOX CULV (6 FT X 6 FT)(EXTEND)LF237.000450.001
2
3
4
5
6
615.000
605.240
560.000
600.000
750.000
545.000
4646005RC PIPE (CL III)(24 IN)LF50.000100.001
2
3
4
5
6
96.000
84.210
130.000
80.000
95.000
125.000
4646009RC PIPE (CL III)(42 IN)LF242.000150.001
2
3
4
5
6
245.000
210.520
250.000
200.000
350.000
235.000
4666102HEADWALL (CH - PW - 0) (DIA= 42 IN)EA4.0006,500.001
2
3
4
5
6
5,250.000
6,841.890
8,500.000
7,500.000
8,500.000
7,700.000
4666135HEADWALL (CH - PW - S) (DIA= 42 IN)EA2.0008,500.001
2
3
4
5
6
5,500.000
8,947.090
9,500.000
9,500.000
9,500.000
8,800.000
4666194WINGWALL (PW - 2) (HW=5 FT)EA2.0009,000.001
2
3
4
5
6
6,225.000
8,420.790
6,700.000
8,500.000
7,500.000
6,300.000
4666196WINGWALL (PW - 2) (HW=7 FT)EA6.00011,500.001
2
3
4
5
6
9,700.000
15,788.980
13,500.000
16,000.000
10,000.000
12,250.000
4676348SET (TY II) (18 IN) (CMP) (6: 1) (P)EA12.000950.001
2
3
4
5
6
1,175.000
999.970
900.000
950.000
1,850.000
825.000
4676380SET (TY II) (24 IN) (CMP) (6: 1) (P)EA4.0001,000.001
2
3
4
5
6
1,500.000
1,105.230
1,100.000
1,050.000
2,000.000
965.000
4676390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA1.0001,000.001
2
3
4
5
6
1,275.000
999.970
1,000.000
950.000
2,100.000
915.000
4676395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA2.0001,200.001
2
3
4
5
6
1,500.000
1,052.600
1,200.000
1,000.000
2,500.000
1,050.000
4806002CLEAN EXIST CULVERTSCY55.000100.001
2
3
4
5
6
85.000
105.260
50.000
100.000
100.000
45.000
4966007REMOV STR (PIPE)LF401.00020.001
2
3
4
5
6
10.650
10.530
30.000
10.000
50.000
32.000
5006001MOBILIZATIONLS1.000186,515.001
2
3
4
5
6
185,000.000
255,000.000
260,000.000
275,000.000
200,000.000
301,061.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO10.0005,000.001
2
3
4
5
6
12,000.000
9,000.000
8,500.000
20,000.000
8,500.000
34,900.000
5066002004ROCK FILTER DAMS (INSTALL) (TY 2)LF1,500.00025.001
2
3
4
5
6
32.000
34.550
35.000
32.820
30.000
33.000
5066011004ROCK FILTER DAMS (REMOVE)LF1,500.0007.001
2
3
4
5
6
10.000
12.370
4.000
11.750
15.000
12.000
5066038004TEMP SEDMT CONT FENCE (INSTALL)LF1,660.0003.001
2
3
4
5
6
1.950
3.040
3.500
2.890
4.000
3.000
5066039004TEMP SEDMT CONT FENCE (REMOVE)LF1,660.0001.001
2
3
4
5
6
0.900
0.760
1.000
0.720
2.000
0.750
5066040004BIODEG EROSN CONT LOGS (INSTL) (8")LF1,880.0002.751
2
3
4
5
6
2.050
3.220
5.000
3.060
15.000
3.150
5066043004BIODEG EROSN CONT LOGS (REMOVE)LF1,880.0000.751
2
3
4
5
6
0.500
0.550
1.000
0.520
9.000
0.550
5306002INTERSECTIONS (ACP)SY180.00025.001
2
3
4
5
6
34.000
28.500
58.000
22.500
42.000
60.000
5306005DRIVEWAYS (ACP)SY187.00025.001
2
3
4
5
6
38.000
25.500
56.000
70.000
42.000
60.000
5306008TURNOUTS (ACP)SY138.00040.001
2
3
4
5
6
34.000
29.250
45.000
58.000
42.000
60.000
5306016DRIVEWAYS (BASE)SY1,177.00020.001
2
3
4
5
6
14.000
32.000
25.000
23.000
25.000
34.000
5336001RUMBLE STRIPS (SHOULDER)LF36,476.0000.351
2
3
4
5
6
0.200
0.320
0.200
0.180
0.500
0.150
5336002RUMBLE STRIPS (CENTERLINE)LF18,238.0000.351
2
3
4
5
6
0.200
0.530
0.200
0.180
0.500
0.150
5606011MAILBOX INSTALL-S (TWW-POST) TY 4EA5.000250.001
2
3
4
5
6
220.000
365.680
250.000
220.000
650.000
230.000
5606012MAILBOX INSTALL-D (TWW-POST) TY 4EA1.000300.001
2
3
4
5
6
265.000
413.050
290.000
265.000
650.000
275.000
5606013MAILBOX INSTALL-M (TWW-POST) TY 4EA1.000500.001
2
3
4
5
6
610.000
776.200
680.000
610.000
650.000
630.000
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA4.000700.001
2
3
4
5
6
505.000
531.560
555.000
505.000
650.000
515.000
6446060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA21.000450.001
2
3
4
5
6
335.000
352.620
370.000
335.000
650.000
350.000
6446061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA8.000400.001
2
3
4
5
6
410.000
431.570
450.000
410.000
650.000
435.000
6446068RELOCATE SM RD SN SUP&AM TY 10BWGEA5.000425.001
2
3
4
5
6
350.000
368.410
390.000
350.000
500.000
360.000
6446071RELOCATE SM RD SN SUP&AM TY TWTEA2.000350.001
2
3
4
5
6
275.000
289.470
300.000
275.000
500.000
285.000
6446076REMOVE SM RD SN SUP&AMEA21.00075.001
2
3
4
5
6
75.000
78.940
85.000
75.000
50.000
78.000
6586002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA12.000100.001
2
3
4
5
6
175.000
184.210
200.000
175.000
100.000
182.000
6586048INSTL OM ASSM (OM-2Z)(FLX)GNDEA2.00065.001
2
3
4
5
6
175.000
184.210
200.000
175.000
100.000
182.000
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA1,884.0000.751
2
3
4
5
6
1.500
1.000
0.750
1.250
5.000
1.000
6666048007REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF12.00015.001
2
3
4
5
6
20.600
25.260
23.000
24.000
20.000
22.000
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF36,475.0000.301
2
3
4
5
6
0.400
0.470
0.450
0.450
0.500
0.500
6666312007RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF2,644.0000.301
2
3
4
5
6
0.400
0.470
0.450
0.450
0.500
0.600
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF21,830.0000.301
2
3
4
5
6
0.400
0.470
0.450
0.450
0.500
0.500
6726009REFL PAV MRKR TY II-A-AEA405.0002.751
2
3
4
5
6
3.000
9.470
3.500
9.000
15.000
5.300
60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF80.0003.001
2
3
4
5
6
20.000
15.790
23.000
15.000
10.000
26.000
61856002TMA (STATIONARY)DAY170.000100.001
2
3
4
5
6
300.000
390.000
250.000
225.000
350.000
278.000
61856003TMA (MOBILE OPERATION)HR144.00045.001
2
3
4
5
6
90.000
116.000
60.000
95.000
150.000
55.000