The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | GRAYSON | Let Date: | 03/05/19 |
Type: | REPAIR SLOPE FAILURE AND ROADWAY | Seq No: | 3024 |
Time: | 213 WORKING DAYS | Project ID: | NH 2017(244) |
Highway: | US 75 | Contract #: | 03193024 |
Length: | 1.000 | CCSJ: | 0047-18-081 |
Limits: | |||
From: | 0.6 MILES N OF RANDALL LAKE ROAD | Check: | $20,000 |
To: | 0.4 MILES S OF RANDALL LAKE ROAD | Misc Cost: | $43,000.00 |
Estimate | $1,795,652.60 | % Over/Under | Company |
Bidder 1 | $1,629,373.40 | -9.26% | ACCELERATED CRITICAL PATH, INC. |
Bidder 2 | $1,780,497.59 | -0.84% | HARRISON, WALKER AND HARPER, LP |
Bidder 3 | $2,219,921.35 | +23.63% | ED BELL CONSTRUCTION COMPANY |
Bidder 4 | $2,222,220.00 | +23.76% | EAST TEXAS BRIDGE, INC. |
Bidder 5 | $2,433,054.00 | +35.50% | FNH CONSTRUCTION, LLC |
Bidder 6 | $2,657,920.30 | +48.02% | PAVECON LTD. CO. |
Bidder 7 | $3,087,740.60 | +71.96% | D. L. LENNON INCORPORATED - CONTRACTOR |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1046009 | REMOVING CONC (RIPRAP) | SY | 182.000 | 15.00 | 1 2 3 4 5 6 7 | 22.000 25.130 12.000 20.000 20.000 30.450 25.000 |
1056022 | REMOVING STAB BASE AND ASPH PAV (13") | SY | 1,147.000 | 21.00 | 1 2 3 4 5 6 7 | 14.000 10.450 12.000 15.000 20.000 38.560 25.000 |
1106003 | EXCAVATION (SPECIAL) | CY | 20,886.000 | 12.00 | 1 2 3 4 5 6 7 | 5.500 9.270 11.550 15.000 15.000 12.830 35.000 |
1326003 | EMBANKMENT (FINAL)(ORD COMP)(TY B) | CY | 20,886.000 | 18.00 | 1 2 3 4 5 6 7 | 9.000 12.370 15.750 15.000 25.000 14.630 35.000 |
1326019 | EMBANKMENT (VEHICLE)(ORD COMP)(TY B) | CY | 200.000 | 14.25 | 1 2 3 4 5 6 7 | 15.000 33.650 26.250 20.000 30.000 84.250 35.000 |
1346002 | BACKFILL (TY B) | STA | 4.300 | 185.00 | 1 2 3 4 5 6 7 | 500.000 1,113.220 315.000 400.000 250.000 2,591.350 500.000 |
1606004 | FURNISHING AND PLACING TOPSOIL (6") | SY | 12,656.000 | 3.00 | 1 2 3 4 5 6 7 | 2.900 3.670 4.200 3.000 6.000 7.650 2.000 |
1626002 | BLOCK SODDING | SY | 12,656.000 | 3.10 | 1 2 3 4 5 6 7 | 3.000 4.340 4.200 5.000 6.000 5.120 2.800 |
1686001 | VEGETATIVE WATERING | MG | 35.000 | 45.00 | 1 2 3 4 5 6 7 | 45.000 651.680 168.000 50.000 50.000 52.790 100.000 |
2476223003 | FL BS (CMP IN PLC)(TY A GR 4)(10") | SY | 1,194.000 | 15.00 | 1 2 3 4 5 6 7 | 29.000 24.700 21.000 28.000 33.000 44.450 35.000 |
2606002 | LIME (HYDRATED LIME (SLURRY)) | TON | 2,482.000 | 190.00 | 1 2 3 4 5 6 7 | 190.000 186.030 210.000 200.000 171.000 182.650 175.000 |
2606026 | LIME TRT (EXIST MATL)(24") | SY | 29,462.000 | 6.50 | 1 2 3 4 5 6 7 | 9.000 4.150 9.450 5.000 8.000 25.150 8.000 |
2606027 | LIME TRT (EXST MATL)(8") | SY | 1,322.000 | 3.00 | 1 2 3 4 5 6 7 | 5.000 3.700 4.200 5.000 3.500 14.000 8.000 |
3166017 | ASPH (AC-20-5TR) | GAL | 550.000 | 4.00 | 1 2 3 4 5 6 7 | 15.000 5.420 9.440 15.000 10.000 8.800 35.000 |
3166029 | ASPH (RC-250) | GAL | 335.000 | 5.00 | 1 2 3 4 5 6 7 | 21.000 7.400 14.990 15.000 10.000 12.750 34.000 |
3166076 | AGGR(TY-B GR-3 SAC-A) | CY | 12.000 | 200.00 | 1 2 3 4 5 6 7 | 600.000 535.780 832.500 400.000 300.000 267.400 500.000 |
3166177 | AGGR(TY-B GR-5 SAC-B) | CY | 9.000 | 100.00 | 1 2 3 4 5 6 7 | 700.000 299.720 1,054.500 400.000 300.000 329.350 500.000 |
3406034 | D-GR HMA(SQ) TY-C PG64-22 | TON | 192.000 | 135.00 | 1 2 3 4 5 6 7 | 115.000 150.720 160.950 130.000 200.000 202.250 370.000 |
4016001 | FLOWABLE BACKFILL | CY | 30.000 | 150.00 | 1 2 3 4 5 6 7 | 210.000 280.560 315.000 500.000 350.000 387.250 350.000 |
4326001 | RIPRAP (CONC)(4 IN) | CY | 21.000 | 500.00 | 1 2 3 4 5 6 7 | 450.000 733.420 840.000 500.000 450.000 2,200.000 450.000 |
5006001 | MOBILIZATION | LS | 1.000 | 20,000.00 | 1 2 3 4 5 6 7 | 160,000.000 163,385.170 212,000.000 200,000.000 235,000.000 127,774.700 99,450.000 |
5026001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 14.000 | 7,500.00 | 1 2 3 4 5 6 7 | 2,300.000 4,490.880 9,450.000 7,000.000 5,000.000 5,029.000 1,541.000 |
5066001002 | ROCK FILTER DAMS (INSTALL) (TY 1) | LF | 120.000 | 27.50 | 1 2 3 4 5 6 7 | 49.000 34.800 40.000 50.000 30.000 20.890 26.700 |
5066011002 | ROCK FILTER DAMS (REMOVE) | LF | 120.000 | 8.25 | 1 2 3 4 5 6 7 | 15.000 19.100 20.000 5.000 15.000 12.380 6.890 |
5066038002 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 500.000 | 2.35 | 1 2 3 4 5 6 7 | 5.000 4.620 3.150 5.000 4.000 1.600 3.500 |
5066039002 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 500.000 | 0.65 | 1 2 3 4 5 6 7 | 1.000 2.880 0.530 0.400 2.000 0.830 1.000 |
5126013 | PORT CTB (DES SOURCE)(SGL SLP)(TY 1) | LF | 75.000 | 15.00 | 1 2 3 4 5 6 7 | 11.000 23.560 25.000 40.000 30.000 23.650 50.000 |
5126017 | PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) | LF | 1,550.000 | 7.00 | 1 2 3 4 5 6 7 | 6.000 18.260 10.000 40.000 30.000 19.950 50.000 |
5126037 | PORT CTB (STKPL)(SGL SLP)(TY 1) | LF | 75.000 | 15.00 | 1 2 3 4 5 6 7 | 9.000 14.150 15.000 10.000 30.000 29.500 50.000 |
5126041 | PORT CTB (STKPL)(F-SHAPE)(TY 1) | LF | 1,550.000 | 4.25 | 1 2 3 4 5 6 7 | 4.000 12.330 10.000 10.000 30.000 11.100 50.000 |
5456004 | CRASH CUSH ATTEN (STKPL) | EA | 2.000 | 1,200.00 | 1 2 3 4 5 6 7 | 750.000 1,177.380 1,000.000 3,000.000 2,500.000 5,335.000 2,425.000 |
5456007 | CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | EA | 1.000 | 22,000.00 | 1 2 3 4 5 6 7 | 29,000.000 24,199.250 21,000.000 15,000.000 12,500.000 22,220.000 20,200.000 |
5566008 | PIPE UNDERDRAINS (TY 8) (6") | LF | 4,960.000 | 25.00 | 1 2 3 4 5 6 7 | 19.500 24.620 26.500 50.000 30.000 21.800 50.000 |
6446068 | RELOCATE SM RD SN SUP&AM TY 10BWG | EA | 7.000 | 450.00 | 1 2 3 4 5 6 7 | 450.000 706.430 945.000 1,000.000 450.000 577.500 2,000.000 |
6586048 | INSTL OM ASSM (OM-2Z)(FLX)GND | EA | 2.000 | 80.00 | 1 2 3 4 5 6 7 | 150.000 176.610 115.000 200.000 1,000.000 104.500 2,000.000 |
6666299007 | RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) | LF | 110.000 | 0.40 | 1 2 3 4 5 6 7 | 11.000 11.770 11.250 12.000 5.000 11.000 10.000 |
6666302007 | RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | LF | 430.000 | 0.40 | 1 2 3 4 5 6 7 | 6.000 5.890 5.630 6.000 5.000 5.500 5.000 |
6666314007 | RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | LF | 430.000 | 0.40 | 1 2 3 4 5 6 7 | 6.000 5.890 5.630 6.000 5.000 5.500 5.000 |
6726010 | REFL PAV MRKR TY II-C-R | EA | 6.000 | 4.00 | 1 2 3 4 5 6 7 | 40.000 58.870 56.250 60.000 15.000 55.000 50.000 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 9,500.00 | 1 2 3 4 5 6 7 | 9,000.000 11,773.840 13,650.000 15,000.000 15,000.000 17,600.000 25,000.000 |
61856002 | TMA (STATIONARY) | DAY | 28.000 | 185.00 | 1 2 3 4 5 6 7 | 190.000 699.900 525.000 300.000 550.000 825.000 1,000.000 |