Tabulation of Bids for Project C 74-1-55

Last Update: Friday, May 17, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:LIVE OAKLet Date:03/06/19
Type:REHAB AND WIDEN-WEST FRTG LANES ONLYSeq No:3226
Time:119 WORKING DAYSProject ID:C 74-1-55
Highway:IH 37Contract #:03193226
Length:3.250CCSJ:0074-01-055
Limits: 
From:OAKVILLECheck:$39,000
To:SH 72Misc Cost:$30,000.00
Estimate$1,927,012.90% Over/UnderCompany
Bidder 1$1,839,971.96-4.52%HUNTER INDUSTRIES, LTD.
Bidder 2$1,964,783.11+1.96%SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
Bidder 3$1,989,112.07+3.22%TIERRA LEASE SERVICE, LLC
Bidder 4$2,079,430.59+7.91%CLORE EQUIPMENT LLC
Bidder 5$2,137,278.35+10.91%J. CARROLL WEAVER, INC.
Bidder 6$2,332,783.87+21.06%RAY FARIS, INC.
Bidder 7$2,358,056.85+22.37%HAAS-ANDERSON CONSTRUCTION, LTD.
Bidder 8$2,687,433.13+39.46%BAY LTD.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1046009REMOVING CONC (RIPRAP)SY476.00010.001
2
3
4
5
6
7
8
8.940
14.680
10.000
15.710
5.320
22.800
15.000
17.750
1046017REMOVING CONC (DRIVEWAYS)SY268.00010.001
2
3
4
5
6
7
8
8.940
26.250
10.000
14.780
5.320
22.800
21.000
17.750
1106001EXCAVATION (ROADWAY)CY9,347.0006.001
2
3
4
5
6
7
8
8.940
9.790
11.000
4.820
10.970
11.400
12.000
9.800
1326005002EMBANKMENT (FINAL)(ORD COMP)(TY C)CY1,797.00040.001
2
3
4
5
6
7
8
6.840
5.150
12.000
22.410
10.690
11.400
13.000
24.000
1646034DRILL SEEDING (PERM) (RURAL) (SANDY)AC7.590500.001
2
3
4
5
6
7
8
968.000
1,875.350
1,600.000
1,563.320
1,084.160
968.000
1,120.000
2,100.000
1666002FERTILIZERTON1.420625.001
2
3
4
5
6
7
8
1,737.000
1,059.490
920.000
877.650
1,945.440
1,737.000
2,010.000
1,100.000
1686001VEGETATIVE WATERINGMG590.00015.001
2
3
4
5
6
7
8
19.980
11.960
25.000
36.030
15.680
21.120
30.000
32.000
2476041003FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)CY14,226.00058.001
2
3
4
5
6
7
8
54.200
51.680
60.250
67.100
62.040
60.910
73.600
80.000
2756001CEMENTTON674.000175.001
2
3
4
5
6
7
8
141.750
153.820
145.000
168.720
158.240
155.400
165.000
170.000
2756011CEMENT TREAT(EXIST MATL)(8")SY66,903.0001.601
2
3
4
5
6
7
8
1.940
1.460
1.300
0.860
1.780
2.260
3.000
1.550
3166001ASPH (MULTI OPTION)GAL22,364.0002.501
2
3
4
5
6
7
8
2.780
3.720
2.750
4.010
2.790
3.630
2.450
2.400
3166029ASPH (RC-250)GAL14,375.0004.001
2
3
4
5
6
7
8
4.050
4.390
3.750
4.080
3.640
4.570
3.400
4.300
3166226AGGR(TY-PB GR-5 SAC-B)CY453.00085.001
2
3
4
5
6
7
8
74.350
120.600
127.000
81.790
94.980
100.170
126.000
180.000
3166413ASPH(AC-15P, HFRS-2P OR CRS-2P)GAL18,350.0003.001
2
3
4
5
6
7
8
3.310
3.760
3.150
4.040
3.480
3.680
3.250
3.000
3166427AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)CY521.00075.001
2
3
4
5
6
7
8
67.180
112.720
85.000
78.150
111.450
85.390
102.000
120.000
3166430AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)CY674.000100.001
2
3
4
5
6
7
8
65.510
111.940
95.000
73.450
110.180
84.290
102.000
110.000
4016001FLOWABLE BACKFILLCY0.500125.001
2
3
4
5
6
7
8
150.000
1,019.840
1,000.000
352.460
560.000
3,500.000
1,840.000
1,300.000
4326002RIPRAP (CONC)(5 IN)CY64.000350.001
2
3
4
5
6
7
8
400.000
489.180
500.000
529.630
437.140
415.000
552.000
600.000
4646003RC PIPE (CL III)(18 IN)LF384.00060.001
2
3
4
5
6
7
8
65.000
58.140
70.000
53.500
62.890
58.000
80.000
77.000
4646005RC PIPE (CL III)(24 IN)LF48.00070.001
2
3
4
5
6
7
8
85.000
71.960
90.000
63.310
73.190
65.000
80.000
120.000
4676363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA22.0001,400.001
2
3
4
5
6
7
8
1,200.000
921.110
1,400.000
516.410
1,716.030
1,200.000
1,260.000
1,400.000
4676395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA4.0001,500.001
2
3
4
5
6
7
8
1,400.000
1,108.610
2,000.000
1,074.780
2,179.410
1,300.000
1,760.000
1,700.000
4966004REMOV STR (SET)EA16.000400.001
2
3
4
5
6
7
8
400.000
283.450
150.000
309.280
464.820
900.000
144.000
730.000
4966007REMOV STR (PIPE)LF320.00015.001
2
3
4
5
6
7
8
20.000
17.490
2.000
10.780
23.240
15.000
7.300
36.000
5006001MOBILIZATIONLS1.000120,715.001
2
3
4
5
6
7
8
143,199.890
201,829.520
150,000.000
197,655.000
209,172.350
256,606.230
184,000.000
164,500.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO7.0005,000.001
2
3
4
5
6
7
8
1,398.610
1,603.850
2,000.000
2,218.280
1,344.000
18,239.880
2,550.000
23,800.000
5066020004CONSTRUCTION EXITS (INSTALL) (TY 1)SY234.00020.001
2
3
4
5
6
7
8
14.000
14.550
15.000
29.350
15.680
14.000
10.000
38.000
5066024004CONSTRUCTION EXITS (REMOVE)SY234.0006.001
2
3
4
5
6
7
8
2.000
7.200
5.000
16.180
2.240
2.000
5.000
8.900
5066041004BIODEG EROSN CONT LOGS (INSTL) (12")LF315.0004.001
2
3
4
5
6
7
8
4.150
6.580
6.000
5.760
5.040
4.150
4.800
5.700
5066042004BIODEG EROSN CONT LOGS (INSTL) (18")LF735.0005.001
2
3
4
5
6
7
8
5.050
7.990
6.000
10.310
5.660
5.050
5.850
6.700
5066043004BIODEG EROSN CONT LOGS (REMOVE)LF1,050.0001.251
2
3
4
5
6
7
8
1.250
1.660
1.000
1.210
1.400
1.250
1.450
0.650
5306003INTERSECTIONS (SURF TREAT)SY261.00035.001
2
3
4
5
6
7
8
26.280
40.280
30.000
49.690
71.500
38.300
58.000
77.000
5306004DRIVEWAYS (CONC)SY100.00075.001
2
3
4
5
6
7
8
95.000
99.680
110.000
85.580
162.770
74.120
110.000
140.000
5306006DRIVEWAYS (SURF TREAT)SY1,356.00030.001
2
3
4
5
6
7
8
21.900
31.280
20.000
24.730
24.810
38.300
41.000
59.000
5606013MAILBOX INSTALL-M (TWW-POST) TY 4EA3.000550.001
2
3
4
5
6
7
8
500.000
402.550
500.000
740.530
756.000
675.000
783.000
860.000
6446027IN SM RD SN SUP&AM TYS80(1)SA(P)EA29.000470.001
2
3
4
5
6
7
8
500.440
628.610
600.000
669.220
683.200
610.000
708.000
770.000
6446030IN SM RD SN SUP&AM TYS80(1)SA(T)EA2.000560.001
2
3
4
5
6
7
8
581.310
675.550
750.000
932.520
952.000
850.000
986.000
1,100.000
6446080RELOCATE SM RD SN SUP & AM TY TEMPEA31.000200.001
2
3
4
5
6
7
8
150.000
184.610
100.000
137.130
140.000
125.000
145.000
160.000
6586048INSTL OM ASSM (OM-2Z)(FLX)GNDEA12.00060.001
2
3
4
5
6
7
8
75.000
82.940
125.000
82.280
84.000
75.000
87.000
95.000
6626032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF3,727.0000.301
2
3
4
5
6
7
8
0.280
0.340
0.300
0.300
0.310
0.280
0.300
0.360
6626034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF14,448.0000.251
2
3
4
5
6
7
8
0.260
0.320
0.300
0.280
0.290
0.260
0.300
0.330
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA1,845.0000.501
2
3
4
5
6
7
8
1.760
1.210
1.000
2.200
0.370
1.530
1.150
2.100
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF40,981.0000.251
2
3
4
5
6
7
8
0.320
0.410
0.330
0.350
0.360
0.320
0.350
0.410
6666312007RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF3,727.0000.251
2
3
4
5
6
7
8
0.340
0.480
0.350
0.370
0.380
0.340
0.400
0.430
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF14,448.0000.251
2
3
4
5
6
7
8
0.320
0.430
0.330
0.350
0.360
0.320
0.350
0.410
6686076PREFAB PAV MRK TY C (W) (24") (SLD)LF36.00012.001
2
3
4
5
6
7
8
16.000
23.450
17.000
17.550
17.920
16.000
19.000
20.000
6686091PREFAB PAV MRK TY C (W) (18")(YLD TRI)EA8.00025.001
2
3
4
5
6
7
8
20.000
68.750
21.000
21.940
22.400
20.000
23.000
25.000
6726009REFL PAV MRKR TY II-A-AEA406.0003.001
2
3
4
5
6
7
8
3.250
5.470
3.500
3.570
3.640
3.250
3.750
4.100
7526015TREE AND BRUSH REMOVALAC0.1007,000.001
2
3
4
5
6
7
8
10,500.000
42,347.610
30,000.000
21,941.400
53,760.000
48,000.000
36,000.000
74,985.200
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY60.000100.001
2
3
4
5
6
7
8
133.360
71.800
60.000
93.250
67.200
85.000
100.000
81.000
61856002TMA (STATIONARY)DAY200.000120.001
2
3
4
5
6
7
8
150.000
45.510
200.000
137.130
112.000
150.000
10.000
270.000
61856003TMA (MOBILE OPERATION)HR400.00040.001
2
3
4
5
6
7
8
65.000
54.240
50.000
13.160
56.000
50.000
5.000
57.000