Tabulation of Bids for Project F 2023(742)
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | LIBERTY | Let Date: | 05/04/23 |
Type: | SURFACING/ROADWAY RESTORATION | Seq No: | 3027 |
Time: | 51 WORKING DAYS | Project ID: | F 2023(742) |
Highway: | SH 105 | Contract #: | 05233027 |
Length: | 4.280 | CCSJ: | 0951-01-068 |
Limits: | |||
From: | 6.5 MI WEST OF SH 146, EAST | Check: | $58,000 |
To: | SH 146 | Misc Cost: |
Estimate | $2,911,923.79 | % Over/Under | Company |
Bidder 1 | $1,980,516.24 | -31.99% | TEXAS MATERIALS GROUP, INC. |
Bidder 2 | $2,187,080.04 | -24.89% | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC |
Bidder 3 | $2,197,969.23 | -24.52% | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1346004 | BACKFILL (TY A OR B) | STA | 199.500 | 502.00 | 1 2 3 | 293.000 409.350 375.000 |
1646021 | CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | SY | 16,220.000 | 0.60 | 1 2 3 | 0.400 0.520 0.480 |
1646023 | CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | SY | 28,110.000 | 0.50 | 1 2 3 | 0.400 0.520 0.480 |
1686001 | VEGETATIVE WATERING | MG | 372.660 | 120.00 | 1 2 3 | 30.350 25.000 10.000 |
3546021 | PLANE ASPH CONC PAV(0" TO 2") | SY | 488.000 | 33.10 | 1 2 3 | 25.750 30.070 9.500 |
4296003 | CONC STR REPAIR(DECK REP(PART DEPTH)) | SF | 30.000 | 310.00 | 1 2 3 | 500.000 1,071.550 300.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 44.000 | 865.00 | 1 2 3 | 778.000 1,292.320 1,200.000 |
5006001 | MOBILIZATION | LS | 1.000 | 380,000.00 | 1 2 3 | 106,000.000 182,287.890 200,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 4.000 | 7,000.00 | 1 2 3 | 751.000 6,294.690 5,000.000 |
5336001 | RUMBLE STRIPS (SHOULDER) | LF | 39,900.000 | 3.15 | 1 2 3 | 0.060 0.060 0.150 |
5336002 | RUMBLE STRIPS (CENTERLINE) | LF | 19,950.000 | 5.10 | 1 2 3 | 0.080 0.090 0.150 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 400.000 | 27.00 | 1 2 3 | 24.500 24.500 25.000 |
5406008001 | MTL BEAM GD FEN TRANS (T101) | EA | 4.000 | 900.00 | 1 2 3 | 1,835.000 1,841.560 1,310.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 400.000 | 2.50 | 1 2 3 | 2.150 2.150 4.000 |
5426005 | RM MTL BM GD FEN TRANS (T101) | EA | 4.000 | 145.00 | 1 2 3 | 161.000 161.540 200.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 4.000 | 2,990.00 | 1 2 3 | 3,059.000 3,069.270 2,860.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 4.000 | 290.00 | 1 2 3 | 161.000 161.540 250.000 |
5606011 | MAILBOX INSTALL-S (TWW-POST) TY 4 | EA | 11.000 | 350.00 | 1 2 3 | 327.350 328.470 290.000 |
5606013 | MAILBOX INSTALL-M (TWW-POST) TY 4 | EA | 2.000 | 610.00 | 1 2 3 | 698.000 700.010 670.000 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 16.000 | 1,005.00 | 1 2 3 | 520.500 522.310 600.000 |
6446004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T) | EA | 6.000 | 716.00 | 1 2 3 | 655.000 656.930 711.000 |
6446030 | IN SM RD SN SUP&AM TYS80(1)SA(T) | EA | 2.000 | 1,000.00 | 1 2 3 | 896.000 899.240 900.000 |
6446033 | IN SM RD SN SUP&AM TYS80(1)SA(U) | EA | 1.000 | 975.00 | 1 2 3 | 798.000 980.010 1,065.000 |
6586016 | INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) | EA | 28.000 | 32.00 | 1 2 3 | 27.000 26.920 25.000 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 38.000 | 54.00 | 1 2 3 | 37.500 37.690 31.000 |
6586109 | INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI) | EA | 10.000 | 124.00 | 1 2 3 | 134.000 134.620 66.000 |
6626109 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 1,146.000 | 4.74 | 1 2 3 | 0.700 2.260 1.000 |
6626111 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 4,074.000 | 1.75 | 1 2 3 | 0.700 1.060 1.000 |
6666305007 | RE PM W/RET REQ TY I (W)6"(BRK)(090MIL) | LF | 1,930.000 | 0.75 | 1 2 3 | 0.430 0.430 0.400 |
6666308007 | RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) | LF | 42,290.000 | 0.75 | 1 2 3 | 0.420 0.420 0.390 |
6666317007 | RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) | LF | 2,230.000 | 0.75 | 1 2 3 | 0.430 0.430 0.400 |
6666320007 | RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) | LF | 27,271.000 | 0.75 | 1 2 3 | 0.420 0.420 0.390 |
6686076 | PREFAB PAV MRK TY C (W) (24") (SLD) | LF | 38.000 | 15.70 | 1 2 3 | 13.500 13.460 12.500 |
6686085 | PREFAB PAV MRK TY C (W) (WORD) | EA | 2.000 | 337.00 | 1 2 3 | 268.000 269.230 250.000 |
6726007 | REFL PAV MRKR TY I-C | EA | 98.000 | 6.70 | 1 2 3 | 4.300 4.310 4.000 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 443.000 | 8.10 | 1 2 3 | 4.300 4.310 4.000 |
6786002 | PAV SURF PREP FOR MRK (6") | LF | 5,472.000 | 0.75 | 1 2 3 | 0.020 0.020 0.020 |
30776033 | SP MIXES SP-C SAC-A PG76-22 | TON | 12,156.000 | 151.00 | 1 2 3 | 130.500 132.750 138.000 |
30776075 | TACK COAT | GAL | 6,630.000 | 7.30 | 1 2 3 | 2.650 4.650 4.000 |
60566001 | PREFORMED IN-LANE(TRANS) RUMBLE STRIP | LF | 40.000 | 17.00 | 1 2 3 | 21.000 21.000 20.000 |
61856002002 | TMA (STATIONARY) | DAY | 28.000 | 258.00 | 1 2 3 | 178.000 537.760 125.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 26.000 | 511.00 | 1 2 3 | 594.000 25.000 125.000 |