The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:WISELet Date:05/07/19
Type:HAZARD ELIMINATION & SAFETYSeq No:3056
Time:43 WORKING DAYSProject ID:STP 2019(936)HES
Highway:FM 1655Contract #:05193056
Length:0.200CCSJ:1751-01-030
Limits: 
From:0.159 MI NORTH OF CR 1480Check:$5,000
To:0.033 MI SOUTH OF CR 1480Misc Cost:$4,000.00
Estimate$238,193.06% Over/UnderCompany
Bidder 1$333,066.33+39.83%JAY MILLS CONTRACTING, INCORPORATED
Bidder 2$372,723.05+56.48%JAGOE-PUBLIC COMPANY
Bidder 3$456,348.84+91.59%PEACHTREE CONSTRUCTION, LTD.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1046009REMOVING CONC (RIPRAP)SY41.28020.001
2
3
40.000
60.000
85.000
1046054REMOVING CONCRETE(MOW STRIP)LF487.90012.001
2
3
18.000
11.000
28.000
1056009REMOVING STAB BASE AND ASPH PAV (6")CY46.31190.001
2
3
55.000
276.840
350.000
1106001EXCAVATION (ROADWAY)CY145.15915.001
2
3
40.000
35.000
175.000
1326003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY232.59025.001
2
3
30.000
55.000
140.000
1626002BLOCK SODDINGSY836.00012.001
2
3
12.000
7.370
11.000
1686001VEGETATIVE WATERINGMG0.0281,000.001
2
3
30,000.000
3,300.000
5,000.000
3056023SALV,HAUL & STKPL RCL APH PV (0 TO 3")SY946.4562.001
2
3
7.000
10.420
15.000
3406011D-GR HMA(SQ) TY-B PG64-22TON338.39085.001
2
3
150.000
81.000
135.000
3446052001SUPERPAVE MIXTURES SP-C SAC-B PG70-28TON389.44590.001
2
3
160.000
99.000
145.000
4326001RIPRAP (CONC)(4 IN)CY26.055500.001
2
3
600.000
575.000
850.000
4326016RIPRAP (STONE TY R)(DRY)(12 IN)CY5.284300.001
2
3
250.000
1,110.000
350.000
4326045RIPRAP (MOW STRIP)(4 IN)CY44.250650.001
2
3
650.000
585.000
880.000
5006001MOBILIZATIONLS1.00021,654.001
2
3
35,000.000
35,000.000
40,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO2.0008,000.001
2
3
17,000.000
4,000.000
9,500.000
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF250.00010.001
2
3
5.000
4.210
10.000
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF250.0005.001
2
3
2.500
2.110
5.000
5336003RUMBLE STRIPS (SHOULDER) ASPHALTLF1,739.4001.001
2
3
0.450
1.050
2.000
5336004RUMBLE STRIPS (CENTERLINE) ASPHALTLF723.7602.001
2
3
0.450
1.050
2.000
5406001MTL W-BEAM GD FEN (TIM POST)LF500.00025.001
2
3
24.000
21.050
38.000
5426001REMOVE METAL BEAM GUARD FENCELF477.19010.001
2
3
3.500
2.110
5.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA4.0002,500.001
2
3
2,800.000
2,394.740
6,000.000
5446003GUARDRAIL END TREATMENT (REMOVE)EA2.000500.001
2
3
330.000
263.160
500.000
6626034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF2,030.5600.501
2
3
2.500
2.110
4.000
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA102.0005.001
2
3
2.500
1.330
2.000
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF2,030.5601.001
2
3
1.250
1.050
2.600
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF2,030.5601.001
2
3
1.250
1.050
2.600
6726009REFL PAV MRKR TY II-A-AEA27.0006.001
2
3
11.000
10.530
68.000
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY80.000120.001
2
3
95.000
120.000
120.000
61856001TMA (STATIONARY)EA2.0005,000.001
2
3
6,600.000
57,000.000
15,000.000
61856003TMA (MOBILE OPERATION)HR20.000100.001
2
3
100.000
200.000
100.000