Tabulation of Bids for Project BR 2023(918)
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | COLLIN | Let Date: | 06/02/23 |
Type: | REPLACE BRIDGE AND APPROACHES | Seq No: | 3231 |
Time: | 214 WORKING DAYS | Project ID: | BR 2023(918) |
Highway: | FM 543 | Contract #: | 06233231 |
Length: | 0.257 | CCSJ: | 1012-01-017 |
Limits: | |||
From: | @TAYLOR BRCH, SABINE CR & S. CR #1 | Check: | $63,000 |
To: | . | Misc Cost: |
Estimate | $3,137,979.45 | % Over/Under | Company |
Bidder 1 | $2,920,104.63 | -6.94% | INDUS ROAD & BRIDGE, INC. |
Bidder 2 | $3,497,967.47 | +11.47% | SEMA CONSTRUCTION, INC. |
Bidder 3 | $3,845,999.96 | +22.56% | FLUOR HEAVY CIVIL, LLC |
Bidder 4 | $3,976,960.24 | +26.74% | R CONSTRUCTION CIVIL, LLC |
Bidder 5 | $4,265,000.00 | +35.92% | TEXAS-REYES GROUP LTD. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 13.600 | 12,000.00 | 1 2 3 4 5 | 2,900.000 28,835.580 26,143.840 8,200.000 7,200.000 |
1046054 | REMOVING CONCRETE(MOW STRIP) | LF | 306.000 | 8.00 | 1 2 3 4 5 | 20.000 7.000 6.930 17.000 24.000 |
1056061 | REMOV STAB BASE & ASPH PAV (8"-20") | SY | 4,371.000 | 13.00 | 1 2 3 4 5 | 15.000 15.000 12.540 20.000 11.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 6,102.000 | 20.00 | 1 2 3 4 5 | 16.000 10.000 15.550 32.000 20.000 |
1326006 | EMBANKMENT (FINAL)(DENS CONT)(TY C) | CY | 4,717.000 | 25.00 | 1 2 3 4 5 | 23.000 10.000 65.000 45.000 28.000 |
1616017 | COMPOST MANUF TOPSOIL (4") | SY | 9,723.000 | 2.00 | 1 2 3 4 5 | 1.500 3.250 2.970 1.000 1.000 |
1626002 | BLOCK SODDING | SY | 9,723.000 | 5.00 | 1 2 3 4 5 | 4.800 5.000 5.070 6.000 5.000 |
1646051 | DRILL SEED (TEMP)(WARM OR COOL) | SY | 9,723.000 | 0.15 | 1 2 3 4 5 | 0.300 0.300 0.320 0.500 0.500 |
1686001 | VEGETATIVE WATERING | MG | 2,892.000 | 12.00 | 1 2 3 4 5 | 18.000 1.000 0.010 61.000 20.000 |
2476305003 | FL BS (CMP IN PLACE) (TY D GR 1-2)(15") | SY | 5,495.000 | 30.00 | 1 2 3 4 5 | 29.000 28.000 45.000 60.000 70.000 |
3146021001 | EMULS ASPH (PRIME)(MS-2 OR SS-1) | GAL | 1,099.000 | 5.50 | 1 2 3 4 5 | 9.000 8.500 8.570 6.500 7.000 |
3166024002 | ASPH (CRS-2P) | GAL | 224.000 | 7.00 | 1 2 3 4 5 | 14.000 13.200 13.300 6.500 5.000 |
3166419002 | ASPH (AC-15P, AC-20-5TR OR AC-20XP) | GAL | 2,244.000 | 8.00 | 1 2 3 4 5 | 9.000 7.400 7.460 6.500 6.500 |
3166440002 | AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B) | CY | 50.900 | 400.00 | 1 2 3 4 5 | 480.000 500.000 478.660 260.000 200.000 |
4006005 | CEM STABIL BKFL | CY | 559.000 | 325.00 | 1 2 3 4 5 | 268.000 225.000 199.000 51.000 260.000 |
4036001 | TEMPORARY SPL SHORING | SF | 3,665.000 | 40.00 | 1 2 3 4 5 | 36.000 40.000 41.830 38.000 70.000 |
4166004 | DRILL SHAFT (36 IN) | LF | 404.000 | 360.00 | 1 2 3 4 5 | 220.000 210.000 300.000 770.000 282.500 |
4206014001 | CL C CONC (ABUT)(HPC) | CY | 55.800 | 1,600.00 | 1 2 3 4 5 | 950.000 2,000.000 1,534.420 4,000.000 1,827.000 |
4206030001 | CL C CONC (CAP)(HPC) | CY | 40.400 | 1,900.00 | 1 2 3 4 5 | 970.000 2,000.000 1,795.710 2,500.000 2,766.500 |
4206038001 | CL C CONC (COLUMN)(HPC) | CY | 11.600 | 2,400.00 | 1 2 3 4 5 | 1,180.000 2,500.000 2,024.910 4,800.000 4,805.000 |
4226002 | REINF CONC SLAB (HPC) | SF | 9,200.000 | 25.00 | 1 2 3 4 5 | 22.250 28.000 30.470 30.000 50.000 |
4226016 | APPROACH SLAB (HPC) | CY | 70.600 | 650.00 | 1 2 3 4 5 | 825.000 760.000 951.860 1,700.000 1,143.000 |
4256036001 | PRESTR CONC GIRDER (TX34) | LF | 1,190.200 | 200.00 | 1 2 3 4 5 | 190.000 265.000 330.810 215.000 311.000 |
4326031 | RIPRAP (STONE PROTECTION)(12 IN) | CY | 550.000 | 200.00 | 1 2 3 4 5 | 194.000 160.000 130.000 210.000 369.500 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 16.000 | 510.00 | 1 2 3 4 5 | 610.000 725.000 1,154.760 830.000 1,274.000 |
4506007001 | RAIL (TY T223)(HPC) | LF | 448.000 | 162.00 | 1 2 3 4 5 | 182.000 185.000 170.840 187.610 228.000 |
4546020 | SEALED EXPANSION JOINT (4 IN) (SEJ - B) | LF | 91.000 | 105.00 | 1 2 3 4 5 | 140.000 150.000 175.200 130.000 295.500 |
4646005001 | RC PIPE (CL III)(24 IN) | LF | 165.000 | 90.00 | 1 2 3 4 5 | 125.000 150.000 162.530 160.000 176.500 |
4676391 | SET (TY II) (24 IN) (RCP) (4: 1) (P) | EA | 2.000 | 1,320.00 | 1 2 3 4 5 | 1,990.000 950.000 2,907.720 2,000.000 2,964.500 |
4676395 | SET (TY II) (24 IN) (RCP) (6: 1) (P) | EA | 4.000 | 1,286.00 | 1 2 3 4 5 | 2,250.000 1,150.000 3,144.020 2,200.000 3,297.000 |
4966004 | REMOV STR (SET) | EA | 2.000 | 585.00 | 1 2 3 4 5 | 980.000 600.000 1,051.100 780.000 589.000 |
4966007 | REMOV STR (PIPE) | LF | 60.000 | 22.00 | 1 2 3 4 5 | 25.000 30.000 36.450 47.000 26.000 |
4966009 | REMOV STR (BRIDGE 0 - 99 FT LENGTH) | EA | 1.000 | 46,000.00 | 1 2 3 4 5 | 65,000.000 150,000.000 16,637.180 43,000.000 40,392.000 |
5006001 | MOBILIZATION | LS | 1.000 | 275,271.00 | 1 2 3 4 5 | 270,170.430 349,796.740 384,600.000 100,000.000 386,020.850 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 11.000 | 10,000.00 | 1 2 3 4 5 | 7,700.000 10,000.000 3,384.430 2,150.000 1,609.000 |
5066002005 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 45.000 | 30.00 | 1 2 3 4 5 | 35.000 62.000 32.010 39.000 30.000 |
5066003005 | ROCK FILTER DAMS (INSTALL) (TY 3) | LF | 30.000 | 48.00 | 1 2 3 4 5 | 72.000 180.000 64.010 78.000 60.000 |
5066011005 | ROCK FILTER DAMS (REMOVE) | LF | 75.000 | 10.00 | 1 2 3 4 5 | 12.000 25.000 12.800 16.000 12.000 |
5066020005 | CONSTRUCTION EXITS (INSTALL) (TY 1) | SY | 489.000 | 21.00 | 1 2 3 4 5 | 30.000 50.000 29.870 36.000 10.500 |
5066024005 | CONSTRUCTION EXITS (REMOVE) | SY | 489.000 | 8.00 | 1 2 3 4 5 | 9.000 11.000 9.600 12.000 10.500 |
5066038005 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 900.000 | 3.00 | 1 2 3 4 5 | 3.500 4.600 2.930 3.500 3.000 |
5066039005 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 900.000 | 0.80 | 1 2 3 4 5 | 1.000 1.000 0.800 1.000 1.000 |
5066040005 | BIODEG EROSN CONT LOGS (INSTL) (8") | LF | 363.000 | 5.00 | 1 2 3 4 5 | 4.000 6.500 3.470 4.000 3.500 |
5066043005 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 363.000 | 1.50 | 1 2 3 4 5 | 1.000 1.000 0.910 1.000 1.000 |
5086001 | CONSTRUCTING DETOURS | SY | 1,240.000 | 90.00 | 1 2 3 4 5 | 125.000 90.000 170.000 140.000 220.000 |
5106003 | ONE-WAY TRAF CONT (PORT TRAF SIG) | MO | 6.000 | 2,400.00 | 1 2 3 4 5 | 4,000.000 6,250.000 4,886.060 6,900.000 9,423.000 |
5126005 | PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | LF | 810.000 | 60.00 | 1 2 3 4 5 | 18.000 50.000 35.000 94.000 136.500 |
5126029 | PORT CTB (MOVE)(F-SHAPE)(TY 1) | LF | 810.000 | 10.00 | 1 2 3 4 5 | 7.000 5.000 10.000 12.000 7.000 |
5126053 | PORT CTB (REMOVE)(F-SHAPE)(TY 1) | LF | 810.000 | 8.00 | 1 2 3 4 5 | 20.000 14.000 18.400 18.000 19.500 |
5306005 | DRIVEWAYS (ACP) | SY | 349.000 | 48.00 | 1 2 3 4 5 | 155.000 50.000 131.670 120.000 155.000 |
5336003 | RUMBLE STRIPS (SHOULDER) ASPHALT | LF | 1,400.000 | 2.00 | 1 2 3 4 5 | 4.000 2.200 2.020 3.000 0.200 |
5336004 | RUMBLE STRIPS (CENTERLINE) ASPHALT | LF | 700.000 | 0.45 | 1 2 3 4 5 | 4.000 4.000 2.020 3.000 0.500 |
5386001 | RIGHT OF WAY MARKERS | EA | 15.000 | 550.00 | 1 2 3 4 5 | 200.000 450.000 503.850 485.000 550.000 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 100.000 | 21.00 | 1 2 3 4 5 | 25.000 24.000 27.480 35.000 24.000 |
5406006001 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 4.000 | 2,100.00 | 1 2 3 4 5 | 2,200.000 2,000.000 1,908.540 2,450.000 2,003.500 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 120.000 | 4.00 | 1 2 3 4 5 | 6.000 4.000 10.180 13.000 5.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 4.000 | 3,200.00 | 1 2 3 4 5 | 3,000.000 3,000.000 2,900.970 3,700.000 3,111.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 4.000 | 230.00 | 1 2 3 4 5 | 350.000 320.000 254.470 330.000 234.500 |
5456003 | CRASH CUSH ATTEN (MOVE & RESET) | EA | 2.000 | 2,004.00 | 1 2 3 4 5 | 1,800.000 950.000 842.440 1,570.000 1,350.000 |
5456005 | CRASH CUSH ATTEN (REMOVE) | EA | 2.000 | 982.00 | 1 2 3 4 5 | 1,300.000 1,000.000 702.840 2,200.000 675.000 |
5456019 | CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | EA | 2.000 | 10,000.00 | 1 2 3 4 5 | 9,000.000 10,000.000 8,136.620 8,500.000 7,875.000 |
5606011 | MAILBOX INSTALL-S (TWW-POST) TY 4 | EA | 3.000 | 365.00 | 1 2 3 4 5 | 300.000 400.000 267.040 1,800.000 629.000 |
5606025 | RELOCATE EXISTING MAILBOX | EA | 3.000 | 390.00 | 1 2 3 4 5 | 500.000 300.000 675.620 200.000 403.500 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 10.000 | 520.00 | 1 2 3 4 5 | 688.000 700.000 670.130 840.000 700.000 |
6446007 | IN SM RD SN SUP&AM TY10BWG(1)SA(U) | EA | 2.000 | 1,160.00 | 1 2 3 4 5 | 900.000 920.000 881.750 1,150.000 1,000.000 |
6446066 | IN SM RD SN SUP&AM (RAIL MOUNT) | EA | 1.000 | 3,140.00 | 1 2 3 4 5 | 4,500.000 4,400.000 4,232.450 9,200.000 2,500.000 |
6586014 | INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | EA | 6.000 | 22.00 | 1 2 3 4 5 | 18.000 22.000 15.120 24.000 21.000 |
6586016 | INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) | EA | 4.000 | 22.00 | 1 2 3 4 5 | 18.000 22.000 15.120 24.000 26.000 |
6626050 | WK ZN PAV MRK REMOV (REFL) TY II-A-A | EA | 44.000 | 7.00 | 1 2 3 4 5 | 8.000 5.500 5.040 8.000 6.000 |
6626063 | WK ZN PAV MRK REMOV (W)4"(SLD) | LF | 7,004.000 | 0.80 | 1 2 3 4 5 | 1.300 1.000 1.140 1.000 1.500 |
6626075 | WK ZN PAV MRK REMOV (W)24"(SLD) | LF | 24.000 | 7.00 | 1 2 3 4 5 | 11.000 6.000 8.060 10.000 9.500 |
6626095 | WK ZN PAV MRK REMOV (Y)4"(SLD) | LF | 3,502.000 | 1.00 | 1 2 3 4 5 | 1.300 1.000 1.140 1.000 1.500 |
6666048007 | REFL PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 18.000 | 12.00 | 1 2 3 4 5 | 18.000 9.000 10.080 17.000 12.000 |
6666225007 | PAVEMENT SEALER 6" | LF | 960.000 | 0.20 | 1 2 3 4 5 | 0.700 0.300 0.660 0.700 1.000 |
6666309007 | RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | LF | 3,554.000 | 0.60 | 1 2 3 4 5 | 2.000 1.200 0.940 2.000 1.000 |
6666321007 | RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | LF | 3,686.000 | 0.60 | 1 2 3 4 5 | 2.000 1.200 0.940 2.000 1.000 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 46.000 | 7.00 | 1 2 3 4 5 | 8.000 6.000 15.120 8.000 18.000 |
6776001 | ELIM EXT PAV MRK & MRKS (4") | LF | 7,004.000 | 0.50 | 1 2 3 4 5 | 1.200 0.700 0.560 0.990 0.500 |
6786002 | PAV SURF PREP FOR MRK (6") | LF | 7,240.000 | 0.05 | 1 2 3 4 5 | 0.390 0.200 0.200 0.350 0.240 |
6786008 | PAV SURF PREP FOR MRK (24") | LF | 18.000 | 2.00 | 1 2 3 4 5 | 1.400 5.500 3.020 1.500 3.500 |
7306002 | FULL - WIDTH MOWING | AC | 2.000 | 420.00 | 1 2 3 4 5 | 1,200.000 1,100.000 3,023.120 1,200.000 1,638.500 |
7346001 | LITTER REMOVAL | AC | 4.020 | 380.00 | 1 2 3 4 5 | 1,500.000 600.000 1,274.880 1,200.000 742.500 |
30776013 | SP MIXES SP-C SAC-B PG64-22 | TON | 881.000 | 150.00 | 1 2 3 4 5 | 160.000 156.000 151.160 215.000 140.000 |
30776075 | TACK COAT | GAL | 321.000 | 3.20 | 1 2 3 4 5 | 9.000 8.000 8.060 9.000 4.000 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 12,400.00 | 1 2 3 4 5 | 17,000.000 15,000.000 19,195.200 20,900.000 2,562.000 |
61856002002 | TMA (STATIONARY) | DAY | 160.000 | 230.00 | 1 2 3 4 5 | 180.000 250.000 123.550 215.000 14.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 4.000 | 505.00 | 1 2 3 4 5 | 1,000.000 625.000 642.910 1,240.000 563.000 |