Tabulation of Bids for Project C 53-10-47
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | SCURRY | Let Date: | 06/06/24 |
Type: | RESURFACE ROADWAY | Seq No: | 3210 |
Time: | 63 WORKING DAYS | Project ID: | C 53-10-47 |
Highway: | US 84 | Contract #: | 06243210 |
Length: | 0.000 | CCSJ: | 0053-10-047 |
Limits: | |||
From: | HERMLEIGH | Check: | $100,000 |
To: | NEAR FM 1613 | Misc Cost: |
Estimate | $9,703,226.96 | % Over/Under | Company |
Bidder 1 | $9,325,296.75 | -3.89% | RK HALL, LLC |
Bidder 2 | $10,427,823.79 | +7.47% | NOBLES ROAD CONSTRUCTION, INC. |
Bidder 3 | $11,728,588.16 | +20.87% | GILVIN-TERRILL, LTD. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1346002 | BACKFILL (TY B) | STA | 755.000 | 150.00 | 1 2 3 | 171.120 330.000 300.000 |
3516013 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | SY | 20,004.000 | 50.00 | 1 2 3 | 49.480 53.000 75.000 |
3546045 | PLANE ASPH CONC PAV (2") | SY | 316,730.000 | 2.50 | 1 2 3 | 2.260 1.850 3.900 |
5006001 | MOBILIZATION | LS | 1.000 | 841,260.00 | 1 2 3 | 435,687.700 1,019,000.000 1,100,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 4.000 | 20,000.00 | 1 2 3 | 24,600.000 22,000.000 100,000.000 |
5336001 | RUMBLE STRIPS (SHOULDER) | LF | 150,030.000 | 0.20 | 1 2 3 | 0.220 0.220 0.150 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 2,225.000 | 30.00 | 1 2 3 | 27.500 36.300 25.000 |
5406016001 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 4.000 | 1,400.00 | 1 2 3 | 1,595.000 1,320.000 1,450.000 |
5406020001 | MTL W - BEAM GD FEN (LOW FILL CULVERT) | LF | 33.000 | 85.00 | 1 2 3 | 93.500 88.000 85.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 2,250.000 | 2.50 | 1 2 3 | 1.100 2.200 1.000 |
5426002 | REMOVE TERMINAL ANCHOR SECTION | EA | 4.000 | 250.00 | 1 2 3 | 110.000 330.000 100.000 |
5426004 | RM MTL BM GD FENCE TRANS (THRIE-BEAM) | EA | 2.000 | 250.00 | 1 2 3 | 110.000 330.000 100.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 4.000 | 3,500.00 | 1 2 3 | 6,365.730 3,080.000 3,000.000 |
6586061 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | EA | 90.000 | 30.00 | 1 2 3 | 60.500 33.000 55.000 |
6626109 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 5,630.000 | 1.00 | 1 2 3 | 3.770 11.000 2.000 |
6666018007 | REFL PAV MRK TY I (W)6"(DOT)(100MIL) | LF | 103.000 | 1.62 | 1 2 3 | 1.100 1.380 1.000 |
6666030007 | REFL PAV MRK TY I (W)8"(DOT)(100MIL) | LF | 479.000 | 1.50 | 1 2 3 | 1.100 1.500 1.000 |
6666036007 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 2,516.000 | 1.25 | 1 2 3 | 1.100 1.500 1.000 |
6666042007 | REFL PAV MRK TY I (W)12"(SLD)(100MIL) | LF | 79.000 | 3.00 | 1 2 3 | 11.000 1.500 10.000 |
6666048007 | REFL PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 44.000 | 9.50 | 1 2 3 | 11.000 35.000 10.000 |
6666306007 | RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) | LF | 14,715.000 | 0.85 | 1 2 3 | 0.750 0.710 0.680 |
6666309007 | RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | LF | 58,263.000 | 0.85 | 1 2 3 | 0.730 0.800 0.660 |
6666321007 | RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | LF | 58,118.000 | 0.85 | 1 2 3 | 0.730 0.800 0.660 |
6686077 | PREFAB PAV MRK TY C (W) (ARROW) | EA | 6.000 | 250.00 | 1 2 3 | 275.000 465.000 250.000 |
6686085 | PREFAB PAV MRK TY C (W) (WORD) | EA | 6.000 | 350.00 | 1 2 3 | 385.000 650.000 350.000 |
6686092 | PREFAB PAV MRK TY C (W) (36")(YLD TRI) | EA | 184.000 | 65.00 | 1 2 3 | 60.500 27.500 55.000 |
6726010 | REFL PAV MRKR TY II-C-R | EA | 938.000 | 4.00 | 1 2 3 | 4.400 4.950 4.000 |
30766042 | D-GR HMA TY-D SAC-B PG70-22 | TON | 9,234.000 | 160.00 | 1 2 3 | 160.440 177.000 190.000 |
30776075 | TACK COAT | GAL | 8,336.000 | 5.50 | 1 2 3 | 5.510 6.350 6.000 |
30806007 | STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | TON | 24,625.000 | 200.00 | 1 2 3 | 203.010 212.500 205.000 |
30806029 | TACK COAT | GAL | 23,338.000 | 5.50 | 1 2 3 | 5.220 5.800 6.000 |
61856002002 | TMA (STATIONARY) | DAY | 70.000 | 300.00 | 1 2 3 | 220.000 302.000 475.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 15.000 | 600.00 | 1 2 3 | 914.920 1,100.000 950.000 |