Tabulation of Bids for Project BR 2019(422)

Last Update: Wednesday, October 06, 2021

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:WALLERLet Date:07/01/21
Type:REPLACE BRIDGE AND APPROACHESSeq No:3044
Time:120 WORKING DAYSProject ID:BR 2019(422)
Highway:CRContract #:07213044
Length:0.100CCSJ:0912-56-056
Limits: 
From:WILPITZ ROADCheck:$11,000
To:AT BESSIES CREEKMisc Cost:
Estimate$554,885.15% Over/UnderCompany
Bidder 1$560,102.49+0.94%TREVWAY, INC.
Bidder 2$662,231.20+19.35%EARTH BUILDERS, L.P.
Bidder 3$671,332.00+20.99%ARANDA BROTHERS CONSTRUCTION CO., INC.
Bidder 4$702,831.87+26.66%THK CONSTRUCTION LLC
Bidder 5$741,959.60+33.71%JOHN REED AND COMPANY, LLC
Bidder 6$769,059.00+38.60%FORDE CONSTRUCTION COMPANY, INC.
Bidder 7$781,392.60+40.82%STERLING DELAWARE HOLDING COMPANY, INC.
Bidder 8$792,933.80+42.90%FUQUA CONSTRUCTION CO., INC.
Bidder 9$817,536.15+47.33%MILLIS DEVELOPMENT AND CONSTRUCTION, LLC
Bidder 10$821,247.12+48.00%ISI CONTRACTING, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA3.2302,800.001
2
3
4
5
6
7
8
9
10
1,000.000
5,000.000
3,500.000
1,802.000
5,000.000
4,100.000
17,000.000
6,025.466
5,580.800
3,000.000
1006003PREPARING ROW(TREE)(5" TO 12" DIA)EA20.000310.001
2
3
4
5
6
7
8
9
10
150.000
250.000
300.000
561.000
150.000
380.000
300.000
491.243
489.410
110.000
1006004PREPARING ROW(TREE)(12" TO 24" DIA)EA10.0002,350.001
2
3
4
5
6
7
8
9
10
200.000
800.000
350.000
674.000
800.000
770.000
500.000
573.317
652.910
585.000
1006028PREP ROW (TREE PRUNING)EA2.0002,000.001
2
3
4
5
6
7
8
9
10
350.000
500.000
250.000
1,851.000
200.000
1,900.000
500.000
408.038
391.310
275.000
1106001EXCAVATION (ROADWAY)CY295.0007.501
2
3
4
5
6
7
8
9
10
5.000
15.000
13.500
19.000
25.000
28.000
10.000
9.778
27.250
50.000
1106002EXCAVATION (CHANNEL)CY390.00010.501
2
3
4
5
6
7
8
9
10
3.000
15.000
16.000
17.000
25.000
23.000
21.000
10.494
22.890
50.000
1326006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY1,140.0008.501
2
3
4
5
6
7
8
9
10
6.490
25.000
18.000
12.000
20.000
23.000
45.000
10.606
21.800
52.000
1626002BLOCK SODDINGSY996.0000.201
2
3
4
5
6
7
8
9
10
6.550
6.500
5.000
8.270
4.000
5.000
6.300
3.416
7.090
6.700
1626003STRAW OR HAY MULCHSY996.0000.201
2
3
4
5
6
7
8
9
10
1.420
3.500
0.500
5.270
0.500
2.000
2.400
0.179
1.360
3.400
1646009BROADCAST SEED (TEMP) (WARM)SY498.0000.151
2
3
4
5
6
7
8
9
10
2.050
1.200
0.500
1.000
0.500
1.000
2.650
0.112
2.450
1.150
1646051DRILL SEED (TEMP)(WARM OR COOL)SY498.0000.101
2
3
4
5
6
7
8
9
10
3.000
1.200
0.500
1.000
1.000
1.000
2.650
0.134
2.450
1.150
1666001FERTILIZERAC0.200600.001
2
3
4
5
6
7
8
9
10
1,000.000
1,100.000
1,550.000
1,000.000
1,500.000
1,000.000
4,000.000
624.736
2,485.200
1,110.000
1686001VEGETATIVE WATERINGMG25.00010.001
2
3
4
5
6
7
8
9
10
50.000
50.000
65.000
5.000
20.000
245.000
15.000
7.806
26.160
13.000
3406011003D-GR HMA(SQ) TY-B PG64-22TON227.00076.001
2
3
4
5
6
7
8
9
10
205.000
200.000
120.000
260.000
150.000
130.000
105.000
91.246
170.040
170.000
3406272003TACK COATGAL31.0004.001
2
3
4
5
6
7
8
9
10
15.000
25.000
10.000
150.000
5.000
3.500
2.500
3.618
6.540
5.000
4006005CEM STABIL BKFLCY18.00060.001
2
3
4
5
6
7
8
9
10
88.000
120.000
70.000
526.000
50.000
245.000
150.000
76.798
67.580
45.000
4096001PRESTR CONC PIL (16 IN SQ)LF852.00059.001
2
3
4
5
6
7
8
9
10
111.000
115.000
130.000
100.590
190.000
82.000
105.000
164.494
141.700
150.000
4206013CL C CONC (ABUT)CY18.400839.001
2
3
4
5
6
7
8
9
10
650.000
1,000.000
1,000.000
1,161.300
1,500.000
1,850.000
1,800.000
999.802
1,536.900
1,525.000
4206025CL C CONC (BENT)CY13.2001,200.001
2
3
4
5
6
7
8
9
10
1,000.000
1,000.000
1,100.000
1,592.260
1,500.000
2,325.000
2,700.000
1,234.878
1,787.600
1,685.000
4226007REINF CONC SLAB (SLAB BEAM)SF2,340.00014.001
2
3
4
5
6
7
8
9
10
16.000
22.000
13.500
17.970
20.000
16.250
26.000
30.000
19.620
16.000
4226015APPROACH SLABCY39.000450.001
2
3
4
5
6
7
8
9
10
443.000
650.000
485.000
565.850
500.000
633.000
700.000
544.432
551.540
915.000
4256010PRESTR CONC SLAB BEAM (5SB12)LF442.500160.001
2
3
4
5
6
7
8
9
10
175.000
180.000
210.000
248.580
196.000
180.000
210.000
180.000
231.080
184.000
4326031RIPRAP (STONE PROTECTION)(12 IN)CY309.00089.001
2
3
4
5
6
7
8
9
10
140.000
135.000
205.000
110.000
96.000
200.000
140.000
137.368
143.880
205.000
4326045RIPRAP (MOW STRIP)(4 IN)CY15.000450.001
2
3
4
5
6
7
8
9
10
300.000
500.000
750.000
679.000
550.000
1,000.000
680.000
467.130
535.190
750.000
4506006RAIL (TY T223)LF204.000120.001
2
3
4
5
6
7
8
9
10
90.000
120.000
75.000
93.000
80.000
119.000
170.000
111.384
164.590
93.000
4546003ARMOR JOINTLF44.00085.001
2
3
4
5
6
7
8
9
10
89.000
90.000
145.000
188.000
50.000
165.000
100.000
92.579
83.390
90.000
4646008001RC PIPE (CL III)(36 IN)LF16.000121.001
2
3
4
5
6
7
8
9
10
248.300
200.000
90.000
398.000
150.000
645.000
600.000
137.043
281.220
1,000.000
4676454SET (TY II) (36 IN) (RCP) (6: 1) (P)EA4.0004,500.001
2
3
4
5
6
7
8
9
10
1,366.000
3,000.000
2,750.000
3,342.000
3,500.000
4,000.000
3,000.000
4,929.366
4,959.500
2,350.000
4966006REMOV STR (HEADWALL)EA2.0001,400.001
2
3
4
5
6
7
8
9
10
1,000.000
1,500.000
2,000.000
3,684.000
1,500.000
1,960.000
1.000
1,375.886
406.570
1,975.000
4966009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA1.00018,000.001
2
3
4
5
6
7
8
9
10
20,000.000
18,000.000
34,000.000
13,000.000
60,000.000
20,000.000
40,000.000
34,000.000
49,595.000
35,000.000
4966016REMOV STR (PIPE)EA1.000400.001
2
3
4
5
6
7
8
9
10
781.540
1,200.000
250.000
1,000.000
200.000
1,500.000
1.000
386.826
1,547.800
3,950.000
5006001MOBILIZATIONLS1.00054,000.001
2
3
4
5
6
7
8
9
10
57,000.000
65,000.000
62,000.000
40,000.000
70,000.000
118,000.000
74,900.000
112,000.000
113,360.000
82,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO8.00010,000.001
2
3
4
5
6
7
8
9
10
757.000
1,200.000
1,500.000
2,647.600
2,000.000
3,000.000
290.000
8,210.630
1,060.570
919.290
5066002002ROCK FILTER DAMS (INSTALL) (TY 2)LF80.00030.001
2
3
4
5
6
7
8
9
10
15.000
50.000
30.000
73.750
40.000
35.000
30.000
32.558
32.700
50.000
5066011002ROCK FILTER DAMS (REMOVE)LF80.00010.001
2
3
4
5
6
7
8
9
10
1.000
20.000
10.000
48.350
10.000
10.000
5.000
9.150
12.540
22.000
5066020002CONSTRUCTION EXITS (INSTALL) (TY 1)SY78.00020.001
2
3
4
5
6
7
8
9
10
10.000
50.000
25.000
50.000
25.000
30.000
38.000
22.882
19.620
44.000
5066024002CONSTRUCTION EXITS (REMOVE)SY78.00010.001
2
3
4
5
6
7
8
9
10
1.000
10.000
10.000
39.000
10.000
15.000
2.000
6.306
5.180
11.000
5066034002CONSTRUCTION PERIMETER FENCELF120.0003.001
2
3
4
5
6
7
8
9
10
5.000
8.000
5.000
25.000
4.000
5.000
4.000
3.730
1.910
6.500
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF443.0003.001
2
3
4
5
6
7
8
9
10
3.000
5.000
3.500
9.120
4.000
4.000
4.000
2.733
1.910
4.500
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF443.0001.001
2
3
4
5
6
7
8
9
10
1.000
1.000
1.000
6.120
1.000
1.500
1.000
0.694
0.820
1.100
5406001001MTL W-BEAM GD FEN (TIM POST)LF75.00020.001
2
3
4
5
6
7
8
9
10
37.540
30.000
50.000
62.740
50.000
35.000
32.500
23.150
42.510
61.500
5406007001MTL BEAM GD FEN TRANS (TL2)EA4.0001,200.001
2
3
4
5
6
7
8
9
10
1,227.520
1,200.000
2,050.000
1,892.000
1,200.000
1,400.000
1,325.000
1,657.701
1,896.600
1,975.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA4.0002,400.001
2
3
4
5
6
7
8
9
10
2,833.000
3,000.000
4,750.000
3,417.000
2,800.000
3,000.000
2,850.000
2,876.283
3,716.900
4,365.000
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA5.000500.001
2
3
4
5
6
7
8
9
10
724.000
580.000
550.000
800.000
500.000
645.000
457.000
612.741
620.210
507.000
6446076REMOVE SM RD SN SUP&AMEA3.00075.001
2
3
4
5
6
7
8
9
10
10.000
110.000
200.000
1,000.000
40.000
152.000
100.000
99.310
98.100
82.000
6586014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA6.00020.001
2
3
4
5
6
7
8
9
10
5.050
10.000
35.000
26.000
25.000
75.000
8.000
28.202
7.900
6.500
6586081INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)EA10.00020.001
2
3
4
5
6
7
8
9
10
31.580
20.000
55.000
60.000
65.000
75.000
70.000
81.133
41.970
35.000
6586100INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)EA4.00030.001
2
3
4
5
6
7
8
9
10
31.580
30.000
55.000
65.000
65.000
75.000
70.000
134.210
45.240
38.000
6666174007REFL PAV MRK TY II (W) 6" (SLD)LF646.0000.151
2
3
4
5
6
7
8
9
10
1.580
1.500
5.000
5.510
1.300
2.000
1.000
0.179
1.910
1.500
6666210007REFL PAV MRK TY II (Y) 6" (SLD)LF646.0000.151
2
3
4
5
6
7
8
9
10
1.580
1.500
5.000
5.510
1.300
2.200
1.000
0.224
1.910
1.500
6726009REFL PAV MRKR TY II-A-AEA9.0000.151
2
3
4
5
6
7
8
9
10
12.630
15.000
25.000
5.000
8.000
5.200
5.000
3.237
19.620
16.500
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY240.00040.001
2
3
4
5
6
7
8
9
10
140.000
75.000
100.000
75.000
60.000
115.000
40.000
84.448
79.570
90.000