Tabulation of Bids for Project C 275-1-215

Last Update: Monday, September 28, 2020

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:POTTERLet Date:07/08/20
Type:HAZARD ELIMINATION & SAFETYSeq No:3019
Time:383 WORKING DAYSProject ID:C 275-1-215
Highway:IH 40Contract #:07203019
Length:0.000CCSJ:0275-01-215
Limits: 
From:EAST OF WASHINGTON STCheck:$89,000
To:SOUTH OSAGE STMisc Cost:
Estimate$4,447,234.00% Over/UnderCompany
Bidder 1$4,539,711.25+2.08%GILVIN-TERRILL, LTD.
Bidder 2$5,693,333.00+28.02%WEBBER, LLC
Bidder 3$6,383,014.73+43.53%ALTUS CONSTRUCTION LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006009PREPARING ROW (TREE) (6" TO 24" DIA)EA17.0001,000.001
2
3
1,000.000
2,595.000
2,570.730
1046021REMOVING CONC (CURB)LF3,412.00010.001
2
3
30.000
22.750
6.750
1046023REMOVING CONC (CTB)LF50.00040.001
2
3
1,055.000
55.500
33.570
1646040DRILL SEEDING (PERM) (URBAN) (CLAY)AC1.3801,200.001
2
3
1,500.000
2,800.000
690.510
1646053DRILL SEEDING (TEMP)(WARM OR COOL)AC1.380700.001
2
3
1,500.000
2,800.000
492.450
1696003SOIL RETENTION BLANKETS (CL 1) (TY C)SY6,680.0005.001
2
3
1.500
3.000
2.400
4206066CL C CONC (RAIL FOUNDATION)CY73.000600.001
2
3
1,200.000
935.000
613.780
4276002003CONCRETE PAINT FINISHSF121,405.0000.601
2
3
0.470
2.000
0.830
4326001RIPRAP (CONC)(4 IN)CY936.000500.001
2
3
475.000
585.000
767.230
4326045RIPRAP (MOW STRIP)(4 IN)CY184.000500.001
2
3
645.000
725.000
767.230
4506027RAIL (TY T80SS)LF136.000200.001
2
3
300.000
225.000
186.020
4966035REMOV STR (DRILL SHAFT)EA4.0002,000.001
2
3
8,500.000
1,980.000
2,427.900
5006001MOBILIZATIONLS1.000315,000.001
2
3
450,000.000
560,000.000
636,799.340
5026001007BARRICADES, SIGNS AND TRAFFIC HANDLINGMO19.00018,500.001
2
3
15,750.000
27,725.000
30,689.120
5066040004BIODEG EROSN CONT LOGS (INSTL) (8")LF700.0005.001
2
3
10.000
7.750
7.650
5066043004BIODEG EROSN CONT LOGS (REMOVE)LF700.0002.001
2
3
6.000
1.250
2.100
5146001PERM CTB (SGL SLOPE) (TY 1) (42 )LF14,624.000100.001
2
3
75.000
122.750
149.470
5146013PERM CTB (F-SHAPE) (TY 1)LF30.000200.001
2
3
400.000
450.000
383.610
5146041PERM CTB (F-SHAPE)(SPL)LF20.000200.001
2
3
400.000
635.000
383.610
5146047PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)LF490.000200.001
2
3
200.000
495.000
383.610
5146649PERM CTB (TRAN CTB TO SSTR)(MOD)LF14.000200.001
2
3
400.000
540.000
383.610
5406002001MTL W-BEAM GD FEN (STEEL POST)LF675.00028.001
2
3
160.000
28.000
39.130
5406006001MTL BEAM GD FEN TRANS (THRIE-BEAM)EA24.0002,000.001
2
3
2,600.000
3,000.000
3,222.360
5406016001DOWNSTREAM ANCHOR TERMINAL SECTIONEA1.0001,300.001
2
3
3,500.000
1,750.000
2,109.880
5426001REMOVE METAL BEAM GUARD FENCELF14,995.0004.001
2
3
16.000
4.000
4.600
5426002REMOVE TERMINAL ANCHOR SECTIONEA10.000400.001
2
3
2,000.000
500.000
460.340
5446001GUARDRAIL END TREATMENT (INSTALL)EA25.0003,000.001
2
3
4,000.000
3,500.000
3,775.680
5446003GUARDRAIL END TREATMENT (REMOVE)EA27.000350.001
2
3
1,370.000
400.000
405.960
5456005CRASH CUSH ATTEN (REMOVE)EA1.0002,000.001
2
3
4,000.000
2,467.000
1,202.290
5456007CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)EA1.00050,000.001
2
3
34,000.000
18,355.000
34,317.200
6106101REPLACE LUMINAIRE W/LED (150W EQ)EA99.000500.001
2
3
1,023.000
600.000
688.600
6586013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA39.00030.001
2
3
15.000
25.000
30.690
6586026INSTL DEL ASSM (D-SY)SZ (BRF)CTBEA39.00030.001
2
3
15.000
27.000
30.690
6586061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA63.00040.001
2
3
30.000
35.000
53.710
6586064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA54.00040.001
2
3
30.000
37.000
53.710
6666035007REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF9,500.0002.001
2
3
1.400
2.000
2.150
6666038007REFL PAV MRK TY I (W)12"(LNDP)(090MIL)LF1,536.0005.001
2
3
2.250
3.000
3.450
6666041007REFL PAV MRK TY I (W)12"(SLD)(090MIL)LF7,270.0003.501
2
3
2.250
3.000
3.450
6666302007RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF9,740.0001.001
2
3
0.310
0.500
0.480
6666305007RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)LF930.0002.001
2
3
1.000
1.250
1.530
6666314007RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF9,580.0001.001
2
3
0.310
0.500
0.480
60016002PORTABLE CHANGEABLE MESSAGE SIGNEA4.00016,000.001
2
3
15,000.000
15,700.000
13,344.940
60196004PREFB PV MK W/WNTY TY B(W)4"(SLD)CNTSTLF39,650.0007.001
2
3
5.090
5.500
7.810
60196007PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTSTLF16,470.0007.001
2
3
6.400
6.500
9.820
60196012PREFB PV MK W/WNTY TY B(Y)4"(SLD)CNTSTLF39,310.0007.001
2
3
5.090
5.650
7.810
60196017PREFB PV MK W/WNTY TY B(W)6"(DOT)CNTSTLF312.0007.001
2
3
6.400
8.000
9.820
61566006REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)EA11.00010,000.001
2
3
12,840.000
22,125.000
13,505.620
61856002002TMA (STATIONARY)DAY300.000500.001
2
3
400.000
265.000
537.060
61856003002TMA (MOBILE OPERATION)HR150.00060.001
2
3
30.000
80.000
191.810