Tabulation of Bids for Project STP 2023(205)TAPS
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | GRIMES | Let Date: | 08/02/23 |
Type: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Seq No: | 3052 |
Time: | 144 WORKING DAYS | Project ID: | STP 2023(205)TAPS |
Highway: | CS | Contract #: | 08233052 |
Length: | 0.000 | CCSJ: | 0917-17-081 |
Limits: | |||
From: | SH 105 | Check: | $15,000 |
To: | FM 3090 | Misc Cost: |
Estimate | $732,188.25 | % Over/Under | Company |
Bidder 1 | $854,654.98 | +16.73% | FUQUA CONSTRUCTION CO., INC. |
Bidder 2 | $859,199.48 | +17.35% | LARRY YOUNG PAVING, INC. |
Bidder 3 | $923,758.20 | +26.16% | ENCINO LANDSCAPE, INC. |
Bidder 4 | $994,202.42 | +35.79% | TI-ZACK CONCRETE, INC. |
Bidder 5 | $1,071,510.21 | +46.34% | TEXCON GENERAL CONTRACTORS |
Bidder 6 | $1,148,264.20 | +56.83% | TEXAS MATERIALS GROUP, INC. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 4.050 | 6,500.00 | 1 2 3 4 5 6 | 9,962.428 1,068.870 1,000.000 1,100.000 4,500.000 8,400.000 |
1006004 | PREPARING ROW(TREE)(12" TO 24" DIA) | EA | 3.000 | 2,000.00 | 1 2 3 4 5 6 | 951.118 926.350 1,000.000 1,925.000 2,000.000 3,000.000 |
1006011 | PREPARING ROW(TREE)(24" TO 36" DIA.) | EA | 2.000 | 3,500.00 | 1 2 3 4 5 6 | 2,280.082 1,710.190 2,500.000 3,080.000 10,000.000 5,000.000 |
1046015 | REMOVING CONC (SIDEWALKS) | SY | 218.000 | 12.00 | 1 2 3 4 5 6 | 14.994 25.630 40.000 28.450 46.500 40.000 |
1046017 | REMOVING CONC (DRIVEWAYS) | SY | 209.000 | 16.00 | 1 2 3 4 5 6 | 19.236 25.620 40.000 37.090 46.500 40.000 |
1056014 | REMOVING STAB BASE & ASPH PAV (7"-12") | SY | 500.000 | 16.00 | 1 2 3 4 5 6 | 6.384 23.940 40.000 31.010 24.000 33.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 25.000 | 25.00 | 1 2 3 4 5 6 | 12.012 80.150 40.000 31.010 50.000 100.000 |
1326002 | EMBANKMENT (FINAL)(DENS CONT)(TY A) | CY | 387.000 | 18.50 | 1 2 3 4 5 6 | 16.282 81.870 40.000 120.560 30.000 84.000 |
1606003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 1,473.000 | 3.50 | 1 2 3 4 5 6 | 1.596 8.540 30.000 8.420 9.650 10.000 |
1626002 | BLOCK SODDING | SY | 1,473.000 | 5.50 | 1 2 3 4 5 6 | 4.998 8.340 3.000 6.600 6.500 6.000 |
1686001 | VEGETATIVE WATERING | MG | 44.200 | 25.00 | 1 2 3 4 5 6 | 14.574 35.680 1.000 1.100 115.000 36.000 |
3516039 | FLEX PAVEMENT STRUCTURE REPAIR (8"-12") | SY | 61.000 | 85.00 | 1 2 3 4 5 6 | 119.000 270.180 200.000 126.500 236.000 190.000 |
4006005 | CEM STABIL BKFL | CY | 17.000 | 75.00 | 1 2 3 4 5 6 | 111.230 319.900 200.000 330.000 338.000 300.000 |
4166001 | DRILL SHAFT (18 IN) | LF | 60.000 | 79.00 | 1 2 3 4 5 6 | 168.938 303.320 250.000 440.000 370.000 430.000 |
4206013 | CL C CONC (ABUT) | CY | 12.440 | 1,200.00 | 1 2 3 4 5 6 | 1,572.396 1,761.730 1,200.000 4,235.000 2,000.000 3,000.000 |
4236004 | RETAINING WALL (CONC BLOCK) | SF | 1,665.000 | 60.00 | 1 2 3 4 5 6 | 66.010 68.860 60.000 60.500 112.000 150.000 |
4326033 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 162.000 | 150.00 | 1 2 3 4 5 6 | 210.294 213.410 200.000 220.000 180.000 315.000 |
4506051001 | RAIL (HANDRAIL)(TY E) | LF | 57.000 | 200.00 | 1 2 3 4 5 6 | 198.184 136.820 160.000 280.500 262.000 200.000 |
4656005001 | JCTBOX(COMPL)(PJB)(3FTX3FT) | EA | 2.000 | 4,000.00 | 1 2 3 4 5 6 | 7,121.618 6,011.010 10,000.000 9,350.000 5,000.000 7,000.000 |
4796001 | ADJUSTING MANHOLES | EA | 1.000 | 1,200.00 | 1 2 3 4 5 6 | 1,089.802 544.970 800.000 487.920 3,300.000 1,400.000 |
4966099 | REMOVE STR (RAIL) | LF | 30.000 | 30.00 | 1 2 3 4 5 6 | 37.814 25.290 50.000 27.500 50.000 40.000 |
5006001 | MOBILIZATION | LS | 1.000 | 85,000.00 | 1 2 3 4 5 6 | 77,695.800 85,201.890 81,000.000 62,851.260 125,000.000 100,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 9.000 | 3,000.00 | 1 2 3 4 5 6 | 12,374.278 1,623.140 8,500.000 4,950.000 5,000.000 7,000.000 |
5066038002 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 496.000 | 7.50 | 1 2 3 4 5 6 | 3.920 7.130 1.000 5.500 5.600 5.000 |
5066039002 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 493.000 | 2.50 | 1 2 3 4 5 6 | 0.966 2.140 1.000 1.100 1.670 1.500 |
5066040002 | BIODEG EROSN CONT LOGS (INSTL) (8") | LF | 1,289.000 | 5.00 | 1 2 3 4 5 6 | 6.664 6.410 1.000 11.000 5.000 4.500 |
5066043002 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 1,289.000 | 1.25 | 1 2 3 4 5 6 | 1.680 1.430 1.000 1.100 1.150 1.000 |
5306004 | DRIVEWAYS (CONC) | SY | 125.000 | 75.00 | 1 2 3 4 5 6 | 115.836 139.170 120.000 148.000 156.000 130.000 |
5306017 | DRIVEWAYS (CONC) (HES) | SY | 594.000 | 95.00 | 1 2 3 4 5 6 | 110.236 139.820 180.000 154.720 167.000 130.000 |
5316003 | CONC SIDEWALKS (6") | SY | 1,365.000 | 72.00 | 1 2 3 4 5 6 | 97.902 94.650 110.000 148.000 122.000 125.000 |
5316004 | CURB RAMPS (TY 1) | EA | 2.000 | 2,000.00 | 1 2 3 4 5 6 | 2,695.840 2,583.350 2,500.000 2,790.000 3,000.000 2,900.000 |
5316010 | CURB RAMPS (TY 7) | EA | 8.000 | 2,000.00 | 1 2 3 4 5 6 | 2,792.874 2,524.560 2,500.000 2,790.000 3,000.000 2,600.000 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 2.000 | 750.00 | 1 2 3 4 5 6 | 881.258 961.990 800.000 275.000 800.000 810.000 |
6446071 | RELOCATE SM RD SN SUP&AM TY TWT | EA | 3.000 | 475.00 | 1 2 3 4 5 6 | 548.842 705.450 300.000 715.000 590.000 720.000 |
6686076 | PREFAB PAV MRK TY C (W) (24") (SLD) | LF | 87.000 | 30.00 | 1 2 3 4 5 6 | 18.676 64.130 30.000 44.000 26.500 29.000 |
41226004 | THERMO PIPE(18")(HDPE)(TY S)(CSB) | LF | 55.000 | 60.00 | 1 2 3 4 5 6 | 94.262 185.480 200.000 60.500 90.000 120.000 |
41966007 | PED STL TRUSS BRG SPAN (60 FT) | EA | 1.000 | 160,000.00 | 1 2 3 4 5 6 | 109,480.000 135,406.720 120,000.000 137,500.000 128,720.000 110,000.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 20.000 | 350.00 | 1 2 3 4 5 6 | 280.000 425.120 300.000 1.100 250.000 300.000 |