Tabulation of Bids for Project F 2021(846)
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | HOWARD | Let Date: | 08/05/21 |
Type: | REHABILITATE EXISTING ROADWAY | Seq No: | 3219 |
Time: | 198 WORKING DAYS | Project ID: | F 2021(846) |
Highway: | US 87 | Contract #: | 08213219 |
Length: | 0.000 | CCSJ: | 0068-08-067 |
Limits: | |||
From: | US 87 RELIEF ROUTE | Check: | $100,000 |
To: | .6 MILES NORTH OF FM 2230 | Misc Cost: |
Estimate | $7,292,455.80 | % Over/Under | Company |
Bidder 1 | $6,899,249.88 | -5.39% | RK HALL, LLC |
Bidder 2 | $7,055,762.70 | -3.25% | REECE ALBERT, INC. |
Bidder 3 | $7,155,466.73 | -1.88% | DELHUR INDUSTRIES, INC. |
Bidder 4 | $7,528,027.48 | +3.23% | A. L. HELMCAMP, INC. |
Bidder 5 | $7,565,691.62 | +3.75% | FNF CONSTRUCTION, INC. |
Bidder 6 | $9,401,233.70 | +28.92% | CK NEWBERRY, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1056002 | REMOVING STAB BASE AND ASPH PAV (2") | SY | 372.000 | 2.25 | 1 2 3 4 5 6 | 6.850 8.780 12.000 8.750 12.500 15.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 6.000 | 15.00 | 1 2 3 4 5 6 | 59.410 24.740 120.000 200.000 180.000 100.000 |
1346002 | BACKFILL (TY B) | STA | 413.200 | 300.00 | 1 2 3 4 5 6 | 207.990 221.470 240.000 90.000 105.000 225.000 |
1646001 | BROADCAST SEED (PERM) (RURAL) (SANDY) | SY | 33,898.000 | 0.17 | 1 2 3 4 5 6 | 0.120 0.120 0.280 0.120 0.200 0.300 |
1646041 | DRILL SEEDING (TEMP) (WARM) | SY | 16,949.000 | 0.07 | 1 2 3 4 5 6 | 0.140 0.140 0.330 0.140 0.200 0.350 |
1646043 | DRILL SEEDING (TEMP) (COOL) | SY | 16,949.000 | 0.07 | 1 2 3 4 5 6 | 0.150 0.150 0.330 0.150 0.200 0.350 |
1686001 | VEGETATIVE WATERING | MG | 570.600 | 9.50 | 1 2 3 4 5 6 | 54.990 59.460 37.800 10.000 35.000 20.000 |
2756001 | CEMENT | TON | 1,733.000 | 179.00 | 1 2 3 4 5 6 | 202.100 235.280 184.800 220.000 210.000 250.000 |
2756005 | CEMENT TREAT (EXIST MATL)(12") | SY | 96,313.000 | 2.50 | 1 2 3 4 5 6 | 2.220 3.860 2.560 2.350 2.000 2.000 |
3106009 | PRIME COAT (MC-30) | GAL | 19,263.000 | 4.50 | 1 2 3 4 5 6 | 4.830 4.340 4.790 4.000 4.500 5.000 |
3466014003 | STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | TON | 20,426.000 | 130.00 | 1 2 3 4 5 6 | 139.490 138.100 139.910 162.000 140.000 145.000 |
3466058003 | TACK COAT | GAL | 18,569.000 | 3.00 | 1 2 3 4 5 6 | 3.880 2.350 4.180 3.000 4.500 5.000 |
3546045 | PLANE ASPH CONC PAV (2") | SY | 91,740.000 | 1.67 | 1 2 3 4 5 6 | 1.060 1.150 1.100 1.750 1.500 1.000 |
4326002 | RIPRAP (CONC)(5 IN) | CY | 29.000 | 650.00 | 1 2 3 4 5 6 | 865.700 502.980 550.000 525.000 450.000 700.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 810.000 | 650.00 | 1 2 3 4 5 6 | 422.850 412.480 418.000 394.000 425.000 600.000 |
4596007 | GABION MATTRESSES (GALV)(12 IN) | SY | 34.000 | 75.00 | 1 2 3 4 5 6 | 386.730 382.940 60.000 105.000 145.000 250.000 |
4676001 | SET (PIPE RUNNER ASSEMBLY) | EA | 4.000 | 2,220.00 | 1 2 3 4 5 6 | 9,739.400 24.980 3,228.500 2,625.000 500.000 12,000.000 |
4676003 | SET (REPLACE PIPE RUNNER ASSEMBLY) | EA | 1.000 | 2,220.00 | 1 2 3 4 5 6 | 6,475.700 7,258.450 9,278.500 8,400.000 5,000.000 8,000.000 |
4676172 | SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) | EA | 12.000 | 9,000.00 | 1 2 3 4 5 6 | 4,290.000 4,333.170 7,628.500 6,825.000 8,000.000 7,000.000 |
4676240 | SET (TY I)(S= 7 FT)(HW= 3 FT)(4:1) (C) | EA | 6.000 | 9,500.00 | 1 2 3 4 5 6 | 6,807.900 6,716.020 10,928.500 9,975.000 80,000.000 10,000.000 |
4806001 | CLEAN EXIST CULVERTS | EA | 14.000 | 1,600.00 | 1 2 3 4 5 6 | 7,510.210 2,919.180 1,440.000 2,100.000 800.000 2,500.000 |
4966005 | REMOV STR (WINGWALL) | EA | 4.000 | 990.00 | 1 2 3 4 5 6 | 4,265.800 1,984.830 1,800.000 1,575.000 3,000.000 1,500.000 |
5006001 | MOBILIZATION | LS | 1.000 | 662,950.53 | 1 2 3 4 5 6 | 304,202.480 313,338.670 607,000.000 525,000.000 750,000.000 1,250,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 10.000 | 9,500.00 | 1 2 3 4 5 6 | 12,014.780 3,208.280 12,047.000 7,500.000 22,500.000 25,000.000 |
5066041005 | BIODEG EROSN CONT LOGS (INSTL) (12") | LF | 800.000 | 5.25 | 1 2 3 4 5 6 | 6.100 3.960 9.600 3.900 6.000 10.000 |
5066043005 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 800.000 | 1.35 | 1 2 3 4 5 6 | 1.880 1.070 2.400 1.000 1.000 2.000 |
5086001 | CONSTRUCTING DETOURS | SY | 3,503.000 | 60.00 | 1 2 3 4 5 6 | 97.340 124.750 67.410 48.000 40.000 150.000 |
5306002 | INTERSECTIONS (ACP) | SY | 604.000 | 60.00 | 1 2 3 4 5 6 | 49.920 44.370 28.900 56.000 33.000 50.000 |
5306005 | DRIVEWAYS (ACP) | SY | 1,550.000 | 60.00 | 1 2 3 4 5 6 | 40.120 43.470 28.900 47.000 52.000 50.000 |
5336001 | RUMBLE STRIPS (SHOULDER) | LF | 68,666.000 | 0.25 | 1 2 3 4 5 6 | 0.220 0.140 0.110 0.160 0.120 0.500 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 275.000 | 22.00 | 1 2 3 4 5 6 | 31.080 31.010 31.900 32.500 28.000 35.000 |
5406016001 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 2.000 | 1,200.00 | 1 2 3 4 5 6 | 1,760.000 1,871.500 2,832.500 1,550.000 1,900.000 2,500.000 |
5406020001 | MTL W - BEAM GD FEN (LOW FILL CULVERT) | LF | 50.000 | 105.00 | 1 2 3 4 5 6 | 55.000 208.540 214.500 89.000 205.000 300.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 325.000 | 2.00 | 1 2 3 4 5 6 | 3.300 1.660 1.710 10.000 2.000 2.000 |
5426002 | REMOVE TERMINAL ANCHOR SECTION | EA | 2.000 | 200.00 | 1 2 3 4 5 6 | 330.000 374.300 385.000 525.000 450.000 500.000 |
5436002 | CABLE BARRIER SYSTEM (TL-4) | LF | 20,505.000 | 8.50 | 1 2 3 4 5 6 | 14.800 14.380 15.330 13.000 13.750 18.000 |
5436020 | CABLE BARRIER TERMINAL SECTION (TL-4) | EA | 26.000 | 2,250.00 | 1 2 3 4 5 6 | 2,090.000 2,031.910 2,090.000 2,350.000 2,500.000 6,000.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 2.000 | 2,600.00 | 1 2 3 4 5 6 | 3,657.500 3,208.280 3,300.000 3,300.000 3,250.000 3,500.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 2.000 | 325.00 | 1 2 3 4 5 6 | 330.000 219.230 225.500 525.000 300.000 250.000 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 55.000 | 550.00 | 1 2 3 4 5 6 | 660.000 641.660 660.000 630.000 700.000 800.000 |
6446002 | IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | EA | 27.000 | 700.00 | 1 2 3 4 5 6 | 1,045.000 1,015.950 1,045.000 998.000 800.000 1,000.000 |
6446004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T) | EA | 5.000 | 850.00 | 1 2 3 4 5 6 | 990.000 962.480 990.000 945.000 900.000 1,000.000 |
6446007 | IN SM RD SN SUP&AM TY10BWG(1)SA(U) | EA | 6.000 | 1,200.00 | 1 2 3 4 5 6 | 770.000 748.600 770.000 735.000 1,000.000 1,200.000 |
6446018 | IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL) | EA | 1.000 | 1,300.00 | 1 2 3 4 5 6 | 1,320.000 1,283.310 1,320.000 1,260.000 1,300.000 2,000.000 |
6446030 | IN SM RD SN SUP&AM TYS80(1)SA(T) | EA | 3.000 | 990.00 | 1 2 3 4 5 6 | 1,100.000 1,069.430 1,100.000 1,050.000 1,000.000 1,500.000 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 38.000 | 100.00 | 1 2 3 4 5 6 | 91.840 106.940 110.000 105.000 125.000 200.000 |
6626004 | WK ZN PAV MRK NON-REMOV (W)4"(SLD) | LF | 436.000 | 0.25 | 1 2 3 4 5 6 | 0.240 0.240 0.240 0.230 2.000 1.000 |
6626034 | WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | LF | 41,350.000 | 0.25 | 1 2 3 4 5 6 | 0.240 0.240 0.240 0.230 0.300 0.500 |
6626095 | WK ZN PAV MRK REMOV (Y)4"(SLD) | LF | 2,478.000 | 0.55 | 1 2 3 4 5 6 | 2.200 2.140 2.200 2.100 2.000 3.000 |
6626109 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 2,541.000 | 1.50 | 1 2 3 4 5 6 | 3.190 1.910 2.200 0.580 2.500 2.000 |
6666036007 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 4,340.000 | 0.75 | 1 2 3 4 5 6 | 0.970 0.940 0.970 0.920 0.950 2.000 |
6666300007 | RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | LF | 10,553.000 | 0.40 | 1 2 3 4 5 6 | 0.500 0.480 0.500 0.470 0.500 1.000 |
6666303007 | RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | LF | 42,981.000 | 0.40 | 1 2 3 4 5 6 | 0.480 0.470 0.480 0.460 0.500 1.000 |
6666315007 | RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | LF | 41,455.000 | 0.40 | 1 2 3 4 5 6 | 0.480 0.470 0.480 0.460 0.500 1.000 |
6686018 | PREFAB PAV MRK TY B (W)(24")(SLD) | LF | 12.000 | 31.00 | 1 2 3 4 5 6 | 27.500 26.740 27.500 26.250 55.000 30.000 |
6686092 | PREFAB PAV MRK TY C (W) (36")(YLD TRI) | EA | 176.000 | 31.00 | 1 2 3 4 5 6 | 38.500 37.430 38.500 36.750 50.000 50.000 |
6726010 | REFL PAV MRKR TY II-C-R | EA | 747.000 | 3.25 | 1 2 3 4 5 6 | 3.580 3.480 3.580 3.410 4.750 4.000 |
6776001 | ELIM EXT PAV MRK & MRKS (4") | LF | 1,450.000 | 1.00 | 1 2 3 4 5 6 | 2.200 2.140 2.200 2.100 3.000 3.000 |
30776011 | SP MIXES SP-C PG64-22 | TON | 10,091.000 | 130.00 | 1 2 3 4 5 6 | 95.680 105.130 101.670 124.000 93.500 150.000 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 10,000.00 | 1 2 3 4 5 6 | 10,406.020 12,983.350 19,250.000 15,000.000 6,000.000 25,000.000 |
61856002002 | TMA (STATIONARY) | DAY | 228.000 | 250.00 | 1 2 3 4 5 6 | 133.440 189.760 288.000 100.000 180.000 350.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 22.000 | 200.00 | 1 2 3 4 5 6 | 304.350 618.060 360.000 1,000.000 635.000 400.000 |