Tabulation of Bids for Project RMC - 630841001

Last Update: Monday, November 20, 2017
Text version of this page
County:MATAGORDALet Date:09/07/17
Type:STRUCTURE IMPROVEMENTSSeq No:4005
Time:90 WProject ID:RMC - 630841001
Highway:SH0060Contract #:09174005
Length:0.001CCSJ:6308-41-001
Limits: 
From:AUSTIN, DEWITT, JACKSON, LAVACA,Check:$12,000
To:MATAGORDA, VICTORIA, WHARTONMisc Cost:$1,500.00
Estimate$597,230.00% Over/UnderCompany
Bidder 1$827,505.00+38.56%CHAMPION INFRASTRUCTURE, LLC
Bidder 2$887,342.50+48.58%BIG CREEK CONSTRUCTION, LTD.
Bidder 3$972,760.00+62.88%DAN WILLIAMS COMPANY
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1326021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY340.0030.001
2
3
60.000
50.000
100.000
1506002BLADINGHR40.00150.001
2
3
140.000
100.000
120.000
1646024CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)AC1.002,000.001
2
3
1,200.000
1,000.000
2,500.000
1686001020VEGETATIVE WATERINGMG10.0050.001
2
3
210.000
50.000
15.000
4006005CEM STABIL BKFLCY74.00200.001
2
3
190.000
150.000
220.000
4006006CUT & RESTORING PAVSY69.00200.001
2
3
240.000
150.000
245.000
4026001TRENCH EXCAVATION PROTECTIONLF150.0025.001
2
3
42.000
20.000
20.000
4326002RIPRAP (CONC)(5 IN)CY1.00450.001
2
3
1,800.000
1,500.000
1,800.000
4326026RIPRAP (STONE COMMON)(DRY)(18 IN)CY63.00200.001
2
3
420.000
425.000
425.000
4606002CMP (GAL STL 18 IN)LF8.0060.001
2
3
120.000
100.000
150.000
4606003CMP (GAL STL 24 IN)LF25.0065.001
2
3
160.000
120.000
175.000
4626001CONC BOX CULV (3 FT X 2 FT)LF14.00350.001
2
3
540.000
750.000
1,500.000
4626002CONC BOX CULV (3 FT X 3 FT)LF20.00400.001
2
3
630.000
800.000
950.000
4626004CONC BOX CULV (4 FT X 3 FT)LF8.00475.001
2
3
680.000
900.000
1,300.000
4626007CONC BOX CULV (5 FT X 3 FT)LF12.00500.001
2
3
720.000
1,050.000
1,150.000
4626009CONC BOX CULV (5 FT X 5 FT)LF53.00500.001
2
3
700.000
1,100.000
1,050.000
4626010CONC BOX CULV (6 FT X 3 FT)LF89.00400.001
2
3
700.000
1,400.000
970.000
4626016CONC BOX CULV (7 FT X 5 FT)LF20.00850.001
2
3
950.000
1,900.000
1,200.000
4626096CONC BOX CULV (8 FT X 3 FT)LF7.00600.001
2
3
1,100.000
2,500.000
2,700.000
4626159CONC BOX CULV (9FT X 4FT)LF8.001,200.001
2
3
1,300.000
3,000.000
2,700.000
4646003RC PIPE (CL III)(18 IN)LF8.0065.001
2
3
120.000
160.000
300.000
4646009RC PIPE (CL III)(42 IN)LF86.00200.001
2
3
260.000
250.000
385.000
4666195WINGWALL (PW - 2) (HW=6 FT)EA1.0011,000.001
2
3
9,000.000
22,000.000
28,000.000
4676004SET (REPLACE PIPE RUNNER)EA8.00800.001
2
3
1,500.000
1,000.000
1,000.000
4676105SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)EA4.004,500.001
2
3
5,200.000
5,000.000
5,500.000
4676111SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)EA1.006,500.001
2
3
9,000.000
5,500.000
8,300.000
4676115SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)EA1.005,000.001
2
3
12,000.000
5,800.000
9,000.000
4676143SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)EA2.006,500.001
2
3
8,200.000
6,200.000
7,200.000
4676175SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)EA6.006,800.001
2
3
9,500.000
6,500.000
5,400.000
4676185SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)EA5.006,800.001
2
3
10,000.000
7,000.000
7,600.000
4676211SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)EA6.006,500.001
2
3
11,000.000
7,500.000
6,300.000
4676253SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)EA4.008,000.001
2
3
12,000.000
8,700.000
8,200.000
4676269SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)EA2.006,000.001
2
3
14,000.000
9,100.000
7,900.000
4676299SET (TY I)(S= 9 FT)(HW= 5 FT)(3:1) (C)EA2.0010,000.001
2
3
16,000.000
10,800.000
9,400.000
4676356SET (TY II) (18 IN) (RCP) (3: 1) (C)EA2.00750.001
2
3
2,100.000
1,200.000
1,400.000
4676463SET (TY II) (42 IN) (RCP) (4: 1) (C)EA6.003,000.001
2
3
8,500.000
5,000.000
5,200.000
4966016REMOV STR (PIPE)EA80.00500.001
2
3
160.000
20.000
60.000
5006001MOBILIZATIONLS1.0054,000.001
2
3
45,000.000
87,100.000
95,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO6.004,000.001
2
3
3,400.000
10,000.000
18,500.000
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF1,030.003.001
2
3
8.000
7.000
6.000
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF1,030.001.001
2
3
4.000
0.750
2.000
5406001MTL W-BEAM GD FEN (TIM POST)LF275.0025.001
2
3
23.000
25.000
45.000
5406017MTL BM GD FEN (LONG SPAN SYSTEM)LF50.0025.001
2
3
40.000
30.000
55.000
5426001REMOVE METAL BEAM GUARD FENCELF800.002.501
2
3
12.000
5.000
10.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA4.00500.001
2
3
450.000
350.000
600.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA2.002,200.001
2
3
2,900.000
2,500.000
4,200.000
6586049INSTL OM ASSM (OM-2Z)(FLX)GND(BI)EA30.0050.001
2
3
60.000
40.000
60.000
6586062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA12.0030.001
2
3
60.000
40.000
60.000