Tabulation of Bids for Project F 2023(102)

Last Update: Thursday, December 01, 2022

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:ATASCOSALet Date:09/08/22
Type:RESPORE EXISTING PAVEMENTSeq No:3238
Time:298 WORKING DAYSProject ID:F 2023(102)
Highway:FM 1099Contract #:09223238
Length:7.670CCSJ:0748-06-016
Limits: 
From:US 281ACheck:$100,000
To:FM 99Misc Cost:
Estimate$14,058,120.12% Over/UnderCompany
Bidder 1$14,508,838.60+3.21%HUNTER INDUSTRIES, LTD.
Bidder 2$15,483,190.33+10.14%TEXAS MATERIALS GROUP, INC.
Bidder 3$16,201,709.50+15.25%H. L. ZUMWALT CONSTRUCTION, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA405.000611.851
2
3
479.700
200.000
134.870
1106001EXCAVATION (ROADWAY)CY78,889.00012.001
2
3
13.680
14.200
14.310
1326003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY3,935.00024.001
2
3
14.940
9.800
13.880
1606003FURNISHING AND PLACING TOPSOIL (4")SY249,924.0001.101
2
3
1.140
1.300
1.500
1646003BROADCAST SEED (PERM) (RURAL) (CLAY)SY249,924.0000.201
2
3
0.180
0.170
0.220
1646009BROADCAST SEED (TEMP) (WARM)SY124,962.0000.161
2
3
0.140
0.150
0.170
1646011BROADCAST SEED (TEMP) (COOL)SY124,962.0000.121
2
3
0.140
0.150
0.170
1686001VEGETATIVE WATERINGMG3,899.00022.661
2
3
17.100
24.000
41.210
2166001PROOF ROLLINGHR84.00075.001
2
3
128.700
140.000
102.620
2476053003FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)CY18,446.00055.001
2
3
58.420
87.000
87.090
2516215REWORK BS MATL (TY B) (5") (ORD COMP)SY31,065.0004.001
2
3
2.340
1.250
2.770
3156004001FOG SEAL (CSS-1H)GAL8,936.0004.001
2
3
3.940
8.000
3.960
3166419002ASPH (AC-15P, AC-20-5TR OR AC-20XP)GAL38,294.0005.291
2
3
5.040
4.550
5.090
3166431002AGGR (TY-PB GR-4)CY1,161.00097.401
2
3
115.330
159.000
147.210
4006002STRUCT EXCAV (BOX)CY195.00020.001
2
3
10.490
10.200
34.650
4006003STRUCT EXCAV (PIPE)CY99.0005.001
2
3
10.490
10.200
54.710
4006006CUT & RESTORING PAVSY108.000111.521
2
3
252.760
320.000
162.440
4026001TRENCH EXCAVATION PROTECTIONLF199.0003.351
2
3
10.490
10.200
12.800
4036001TEMPORARY SPL SHORINGSF1,048.00026.211
2
3
20.990
21.000
68.600
4326001RIPRAP (CONC)(4 IN)CY2.000511.171
2
3
945.030
920.000
1,390.880
4606002CMP (GAL STL 18 IN)LF215.00080.001
2
3
87.890
85.500
95.370
4606003CMP (GAL STL 24 IN)LF239.000300.001
2
3
122.750
120.000
91.440
4626096002CONC BOX CULV (8 FT X 3 FT)LF56.000846.241
2
3
1,576.640
1,430.000
1,200.100
4646005001RC PIPE (CL III)(24 IN)LF143.000135.511
2
3
304.250
68.500
138.820
4666097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA1.0008,667.001
2
3
8,389.750
8,100.000
11,973.610
4666183WINGWALL (PW - 1) (HW=8 FT)EA2.00030,973.001
2
3
18,890.060
25,600.000
22,304.360
4676348SET (TY II) (18 IN) (CMP) (6: 1) (P)EA8.0001,124.001
2
3
1,574.000
1,530.000
1,289.320
4676380SET (TY II) (24 IN) (CMP) (6: 1) (P)EA10.0002,637.001
2
3
1,679.000
1,630.000
1,639.320
4676390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA1.0002,000.001
2
3
1,731.500
1,685.000
1,458.070
4676395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA2.0002,650.001
2
3
2,099.010
2,040.000
1,639.320
4806001CLEAN EXIST CULVERTSEA20.0003,682.001
2
3
1,049.390
2,550.000
2,732.880
4966004REMOV STR (SET)EA16.000400.001
2
3
838.970
816.000
464.880
4966007REMOV STR (PIPE)LF517.00025.091
2
3
22.040
21.400
17.980
5006001MOBILIZATIONLS1.0001,074,115.891
2
3
1,201,336.000
890,000.000
908,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO18.00010,000.001
2
3
3,652.690
5,500.000
1,750.310
5066002005ROCK FILTER DAMS (INSTALL) (TY 2)LF1,965.00035.001
2
3
41.600
40.500
35.780
5066003005ROCK FILTER DAMS (INSTALL) (TY 3)LF811.00071.781
2
3
82.000
122.000
90.760
5066011005ROCK FILTER DAMS (REMOVE)LF2,776.0007.751
2
3
10.000
11.700
11.410
5066020005CONSTRUCTION EXITS (INSTALL) (TY 1)SY780.00019.831
2
3
23.000
22.150
26.760
5066024005CONSTRUCTION EXITS (REMOVE)SY780.0006.551
2
3
2.000
6.400
2.930
5066038005TEMP SEDMT CONT FENCE (INSTALL)LF27,225.0003.611
2
3
2.350
3.600
2.630
5066039005TEMP SEDMT CONT FENCE (REMOVE)LF27,225.0000.591
2
3
0.750
0.500
0.870
5086001CONSTRUCTING DETOURSSY3,079.00066.461
2
3
40.500
65.000
117.940
5106002ONE-WAY TRAF CONT (PILOT CAR)HR408.000128.701
2
3
128.700
144.000
121.580
5106003ONE-WAY TRAF CONT (PORT TRAF SIG)MO34.0004,800.001
2
3
5,675.080
4,300.000
5,752.100
5126009PORT CTB (FUR & INST)(LOW PROF)(TY 1)LF1,940.00043.231
2
3
49.570
73.000
24.210
5126010PORT CTB (FUR & INST)(LOW PROF)(TY 2)LF200.00039.861
2
3
45.810
68.000
32.690
5126033PORT CTB (MOVE)(LOW PROF)(TY 1)LF3,800.0005.061
2
3
23.910
17.500
8.110
5126034PORT CTB (MOVE)(LOW PROF)(TY 2)LF240.0008.011
2
3
23.440
17.500
10.630
5126057PORT CTB (REMOVE)(LOW PROF)(TY 1)LF1,940.0004.581
2
3
31.280
24.000
11.710
5126058PORT CTB (REMOVE)(LOW PROF)(TY 2)LF200.0005.721
2
3
15.570
24.000
20.190
5306015DRIVEWAYS AND TURNOUTS (SURF TREAT)SY3,505.00055.861
2
3
40.500
21.000
32.220
5336003RUMBLE STRIPS (SHOULDER) ASPHALTLF78,556.0000.181
2
3
0.180
0.170
0.190
5336004RUMBLE STRIPS (CENTERLINE) ASPHALTLF39,484.0000.191
2
3
0.180
0.170
0.220
5406001001MTL W-BEAM GD FEN (TIM POST)LF465.00029.201
2
3
26.500
30.650
32.360
5406016001DOWNSTREAM ANCHOR TERMINAL SECTIONEA2.0001,552.371
2
3
1,350.000
1,835.000
1,662.950
5426001REMOVE METAL BEAM GUARD FENCELF500.0004.501
2
3
2.000
2.550
4.610
5426003REMOVE DOWNSTREAM ANCHOR TERMINALEA4.000212.001
2
3
200.000
229.000
220.980
5446001GUARDRAIL END TREATMENT (INSTALL)EA2.0003,271.001
2
3
3,000.000
3,720.000
3,978.450
5606001MAILBOX INSTALL-S (TWG-POST) TY 1EA1.000267.261
2
3
275.000
280.000
313.890
5606002MAILBOX INSTALL-D (TWG-POST) TY 1EA2.000280.001
2
3
305.000
311.000
346.890
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA24.000561.961
2
3
568.000
580.000
636.190
6446004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA27.000667.131
2
3
697.000
712.000
778.090
6446005IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)EA2.000960.821
2
3
779.000
795.000
868.290
6446023IN SM RD SN SUP&AM TYFRP(1)UA(P)EA6.000700.001
2
3
625.000
638.000
698.890
6446027IN SM RD SN SUP&AM TYS80(1)SA(P)EA2.000750.001
2
3
765.000
780.000
852.890
6446030IN SM RD SN SUP&AM TYS80(1)SA(T)EA9.000885.011
2
3
905.000
924.000
1,006.890
6446033IN SM RD SN SUP&AM TYS80(1)SA(U)EA6.0001,077.001
2
3
1,065.000
1,085.000
1,182.890
6446034IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)EA4.0001,187.101
2
3
1,215.000
1,240.000
1,347.890
6446037IN SM RD SN SUP&AM TYS80(1)SA(U-WC)EA4.0001,289.491
2
3
1,422.000
1,450.000
1,575.590
6446051IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)EA1.0001,830.951
2
3
1,894.000
1,935.000
2,094.790
6446065IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)EA2.0002,400.001
2
3
2,591.480
2,520.000
2,828.710
6446076REMOVE SM RD SN SUP&AMEA81.000128.421
2
3
118.000
120.000
141.050
6586062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA8.00032.001
2
3
30.000
31.000
44.390
6586087INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND(BR)EA6.000116.001
2
3
92.000
94.000
112.590
6586100INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)EA50.000180.751
2
3
92.000
94.000
112.590
6586103INSTL OM ASSM (OM-3L)(WFLX)GND)GNDEA1.000450.001
2
3
402.000
410.000
453.590
6586106INSTL OM ASSM (OM-3R)(WFLX)GND)GNDEA1.000450.001
2
3
402.000
410.000
453.590
6626004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF127,535.0000.421
2
3
0.450
0.390
0.430
6626016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF152.0004.001
2
3
12.000
6.130
7.350
6626032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF860.0000.351
2
3
0.450
0.440
0.610
6626034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF80,068.0000.411
2
3
0.450
0.390
0.430
6626050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA940.0004.531
2
3
2.500
5.100
5.740
6626057WK ZN PAV MRK REMOV (TRAF BTN) TY WLF6,800.0001.171
2
3
1.250
0.510
0.720
6626075WK ZN PAV MRK REMOV (W)24"(SLD)LF672.0007.401
2
3
6.000
7.150
7.870
6626093WK ZN PAV MRK REMOV (Y)4"(BRK)LF500.0000.881
2
3
0.450
0.510
0.780
6626095WK ZN PAV MRK REMOV (Y)4"(SLD)LF41,885.0000.641
2
3
0.450
0.510
0.560
6626109WK ZN PAV MRK SHT TERM (TAB)TY WEA6,047.0002.001
2
3
1.660
1.100
1.240
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA8,042.0001.431
2
3
1.660
1.100
1.210
6666048007REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF148.0007.301
2
3
12.000
10.200
11.770
6666224007PAVEMENT SEALER 4"LF59,396.0000.221
2
3
0.250
0.200
0.220
6666225007PAVEMENT SEALER 6"LF80,910.0000.231
2
3
0.350
0.310
0.340
6666230007PAVEMENT SEALER 24"LF148.0002.921
2
3
1.000
1.630
2.530
6666309007RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF80,910.0000.561
2
3
0.750
0.690
0.340
6666312007RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF5,000.0001.501
2
3
0.550
0.510
0.570
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF54,396.0000.541
2
3
0.550
0.460
0.510
6726009REFL PAV MRKR TY II-A-AEA945.0005.911
2
3
2.500
7.150
7.940
6776001ELIM EXT PAV MRK & MRKS (4")LF7,260.0000.641
2
3
0.350
0.540
3.850
7306107003FULL - WIDTH MOWINGCYC3.00015,000.001
2
3
8,500.000
10,500.000
3,611.140
7346002LITTER REMOVALCYC3.0002,000.001
2
3
2,397.470
3,300.000
5,531.930
7606001DITCH CLEANING AND RESHAPING (FOOT)LF80,990.0002.001
2
3
2.340
1.900
1.360
30766001D-GR HMA TY-B PG64-22TON45,181.00095.001
2
3
84.060
98.250
102.000
30766040D-GR HMA TY-D PG70-22TON1,691.00085.001
2
3
95.400
156.000
120.000
30766066TACK COATGAL6,427.0003.701
2
3
4.230
3.450
6.420
30776023SP MIXES SP-C SAC-B PG70-22TON16,010.00087.801
2
3
99.810
121.000
125.000
30776075TACK COATGAL14,556.0005.821
2
3
4.290
3.500
6.260
30886001CEMENTTON471.000388.051
2
3
0.000
260.000
0.000
30886002ASPHALT BINDER (PG 64-22)TON1,219.000650.001
2
3
0.000
814.000
0.000
30886009FOAMED ASPHALT TREAT (8") (DC)SY127,643.0004.001
2
3
0.000
5.440
0.000
60016002PORTABLE CHANGEABLE MESSAGE SIGNEA2.0009,438.001
2
3
10,200.340
12,000.000
39,179.530
60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF1,440.00025.001
2
3
9.000
25.500
27.660
61856002002TMA (STATIONARY)DAY26.000295.691
2
3
357.010
150.000
578.240
61856005002TMA (MOBILE OPERATION)DAY52.000150.001
2
3
1,020.030
300.000
737.540
30896002CEMENTTON492.000350.751
2
3
253.800
0.000
241.520
30896003EMULSIONGAL422,396.0001.901
2
3
3.780
0.000
3.760
30896010EMUL TRTMNT(MX EXST MTRL & NEW BASE) 8"SY127,643.0004.001
2
3
3.280
0.000
2.870