Tabulation of Bids for Project RMC - 632974001

Last Update: Monday, December 17, 2018
Text version of this page
County:ERATHLet Date:09/18/18
Type:GUARDRAIL INSTALLATION AND REPAIRSeq No:0201
Time:365 CALENDAR DAYSProject ID:RMC - 632974001
Highway:US0377Contract #:09180201
Length:0.000CCSJ:6329-74-001
Limits: 
From:VARIOUS LOCATIONS INCheck:$6,000
To:ERATH, HOOD AND SOMERVELL COUNTIESMisc Cost:
Estimate$296,398.57% Over/UnderCompany
Bidder 1$268,180.00-9.52%VANN/ELLI, INC.
Bidder 2$276,500.00-6.71%ELITE CASTLE RESOURCES LLC
Bidder 3$311,434.83+5.07%JE CASEY, LLC
Bidder 4$327,170.00+10.38%DBI SERVICES, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
5006033MOBILIZATION (CALLOUT)EA12.000503.631
2
3
4
100.000
75.000
1,200.000
940.000
5006034MOBILIZATION (EMERGENCY)EA2.000513.751
2
3
4
200.000
300.000
380.590
2,600.000
5406001MTL W-BEAM GD FEN (TIM POST)LF100.00021.861
2
3
4
23.000
32.000
16.270
23.000
5406004MTL THRIE-BEAM GD FEN (STEEL POST)LF2.0001,427.301
2
3
4
140.000
100.000
1,500.530
1,670.000
5406005TERMINAL ANCHOR SECTIONEA2.00012.051
2
3
4
500.000
150.000
723.530
490.000
5406010MTL W-BEAM GD FEN ADJUSTMENTLF500.0007.301
2
3
4
5.000
10.000
2.920
4.000
5406014SHORT RADIUSLF150.00026.761
2
3
4
20.000
20.000
61.480
45.000
5406015DRIVEWAY TERMINAL ANCHOR SECTIONEA1.000673.071
2
3
4
700.000
1,500.000
820.530
890.000
5406016DOWNSTREAM ANCHOR TERMINAL SECTIONEA1.0001,220.761
2
3
4
1,250.000
1,500.000
929.940
1,100.000
5406023MTL BEAM GD FEN TRANS(THRIE BEAM)28"EA1.0001,705.831
2
3
4
2,000.000
1,800.000
1,087.940
1,300.000
5426001REMOVE METAL BEAM GUARD FENCELF500.0002.791
2
3
4
2.000
3.000
3.640
4.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA1.000245.291
2
3
4
200.000
200.000
145.770
200.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA5.0002,499.451
2
3
4
3,000.000
3,200.000
2,246.880
3,100.000
5446002GUARDRAIL END TREATMENT (MOVE & RESET)EA5.000622.331
2
3
4
700.000
1,000.000
728.830
800.000
5446003GUARDRAIL END TREATMENT (REMOVE)EA5.000194.831
2
3
4
100.000
900.000
242.940
200.000
5446006GDRAIL END TRT(INST)(WOOD POST)(TY III)EA5.0002,445.961
2
3
4
3,000.000
3,200.000
2,565.880
3,200.000
7706001REPAIR RAIL ELEMENT (W - BEAM)LF5,000.00013.861
2
3
4
14.000
15.000
9.490
13.750
7706002REPAIR RAIL ELEMENT (THRIE - BEAM)LF150.00023.621
2
3
4
30.000
2.000
14.980
22.000
7706003REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)LF200.00022.071
2
3
4
30.000
5.000
27.040
36.000
7706006RAISE RAIL ELEMENTLF100.0004.791
2
3
4
5.000
10.000
2.920
3.000
7706008REALIGN EXISTING RAILLF750.0006.971
2
3
4
5.000
8.000
3.640
4.000
7706010REM / REPL TIMBER/STL POST W/O CONC FNDEA400.00038.591
2
3
4
50.000
60.000
31.010
36.000
7706011REM / REPL TIMBER / STL POST W/CONC FNDEA150.00037.101
2
3
4
60.000
15.000
134.100
66.000
7706017REALIGN POSTSEA100.00020.291
2
3
4
20.000
5.000
2.630
10.000
7706019REMOVE & REPLACE BLOCKOUTEA500.0009.931
2
3
4
15.000
15.000
26.200
18.000
7706021REPLACE SINGLE GDRAIL TERMINAL RAILLF500.00023.191
2
3
4
15.000
20.000
18.100
24.000
7706022REPLACE SINGLE GDRAIL TERMINAL POSTEA200.00048.111
2
3
4
65.000
50.000
56.390
46.000
7706024REPLACE TERMINAL ANCHOR POSTSEA10.00051.801
2
3
4
200.000
150.000
452.940
290.000
7706027REMOVE GDRAIL END TRT / REPL WITH SGTEA10.0002,752.641
2
3
4
3,000.000
4,000.000
3,051.770
3,200.000
7706028REPL SINGLE GDRAIL TERM IMPACT HEADEA25.000902.071
2
3
4
750.000
680.000
917.940
960.000
7706029REM & RESET SGT IMPACT HEADEA50.000121.791
2
3
4
20.000
50.000
242.940
99.000
7706030REPLACE SGT CABLE ASSEMBLYEA30.00074.611
2
3
4
20.000
75.000
193.470
140.000
7706031REPLACE SGT CABLE ANCHOREA30.00083.891
2
3
4
20.000
75.000
187.470
136.000
7706032REPLACE SGT STRUTEA10.00078.511
2
3
4
20.000
75.000
175.470
120.000
7706033REPLACE SGT OBJECT MARKEREA25.00022.261
2
3
4
50.000
50.000
27.880
31.000
7706052REPAIR STEEL POST WITH BASE PLATEEA50.000210.331
2
3
4
300.000
180.000
282.180
230.000
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY1.000132.761
2
3
4
200.000
250.000
101.200
675.000
61856002TMA (STATIONARY)DAY100.000369.391
2
3
4
50.000
10.000
232.200
290.000