Tabulation of Bids for Project STP 2B20(264)FRS

Last Update: Wednesday, December 30, 2020

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:HOWARDLet Date:10/01/20
Type:RXR CROSSING & INTERSECTION IMPROVEMENTSSeq No:3027
Time:56 WORKING DAYSProject ID:STP 2B20(264)FRS
Highway:VAContract #:10203027
Length:0.000CCSJ:0908-12-031
Limits: 
From:FM 818Check:$11,000
To:IH-20 SOUTH FRONTAGE ROADMisc Cost:
Estimate$549,000.95% Over/UnderCompany
Bidder 1$715,429.39+30.31%RK HALL, LLC
Bidder 2$793,310.60+44.50%TIERRA LEASE SERVICE, LLC
Bidder 3$856,861.50+56.08%FNH CONSTRUCTION, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA9.2001,000.001
2
3
579.580
450.000
6,500.000
1106001EXCAVATION (ROADWAY)CY15.0009.001
2
3
127.480
60.000
30.000
1106002EXCAVATION (CHANNEL)CY5.00020.001
2
3
77.180
60.000
50.000
1326002002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY509.00020.001
2
3
52.430
60.000
35.000
1606003FURNISHING AND PLACING TOPSOIL (4")SY4,082.0003.001
2
3
2.670
5.000
6.000
1646003BROADCAST SEED (PERM) (RURAL) (CLAY)SY4,082.0000.601
2
3
0.560
0.500
1.000
1686001VEGETATIVE WATERINGMG34.30028.001
2
3
55.980
32.000
50.000
1696001SOIL RETENTION BLANKETS (CL 1) (TY A)SY4,082.0001.001
2
3
1.200
2.250
6.500
3166001002ASPH (MULTI OPTION)GAL2,501.0007.651
2
3
5.190
5.000
10.000
3166175002AGGR(TY-B GR-4 SAC-B)CY45.000136.001
2
3
305.050
285.000
350.000
3546045PLANE ASPH CONC PAV (2")SY702.0001.901
2
3
25.410
15.000
20.000
4006003STRUCT EXCAV (PIPE)CY155.0008.001
2
3
30.250
32.000
30.000
4026001TRENCH EXCAVATION PROTECTIONLF173.0002.001
2
3
49.430
5.000
10.000
4646059001RC PIPE (CL V)(30 IN)LF202.000200.001
2
3
226.860
175.000
125.000
4676422SET (TY II) (30 IN) (RCP) (6: 1) (C)EA2.0002,800.001
2
3
4,192.220
4,300.000
4,000.000
4676423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA2.0002,800.001
2
3
4,192.220
4,300.000
4,000.000
4966007REMOV STR (PIPE)LF108.00020.001
2
3
39.920
45.000
30.000
5006001MOBILIZATIONLS1.00055,000.001
2
3
70,000.000
95,000.000
85,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO4.0009,000.001
2
3
6,608.790
3,250.000
8,500.000
5066020005CONSTRUCTION EXITS (INSTALL) (TY 1)SY111.00030.001
2
3
26.640
20.000
45.000
5066024005CONSTRUCTION EXITS (REMOVE)SY111.00010.001
2
3
16.960
10.000
20.000
5066038005TEMP SEDMT CONT FENCE (INSTALL)LF580.0003.001
2
3
6.920
4.000
4.000
5066039005TEMP SEDMT CONT FENCE (REMOVE)LF580.0001.001
2
3
2.070
2.000
2.000
5066040005BIODEG EROSN CONT LOGS (INSTL) (8")LF175.0005.001
2
3
9.950
6.000
18.000
5066043005BIODEG EROSN CONT LOGS (REMOVE)LF175.0001.501
2
3
2.380
2.000
9.000
5296002CONC CURB (TY II)LF61.00020.001
2
3
283.580
160.000
50.000
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA2.000700.001
2
3
1,032.000
1,100.000
850.000
6446004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA13.000800.001
2
3
1,140.000
1,100.000
850.000
6446076REMOVE SM RD SN SUP&AMEA12.000300.001
2
3
80.530
125.000
250.000
6626057WK ZN PAV MRK REMOV (TRAF BTN) TY WLF1,996.0001.001
2
3
3.600
1.500
5.000
6626059WK ZN PAV MRK REMOV (TRAF BTN) TY YLF2,143.0001.001
2
3
3.600
1.500
5.000
6626075WK ZN PAV MRK REMOV (W)24"(SLD)LF11.00010.001
2
3
60.000
5.500
10.000
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF4,151.0001.001
2
3
1.200
1.000
1.000
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF4,260.0001.001
2
3
1.200
1.000
1.000
6686076PREFAB PAV MRK TY C (W) (24") (SLD)LF150.00011.001
2
3
24.000
13.000
15.000
6686089PREFAB PAV MRK TY C (W) (RR XING)EA1.000500.001
2
3
962.400
700.000
1,000.000
6686092PREFAB PAV MRK TY C (W) (36")(YLD TRI)EA3.00030.001
2
3
120.000
45.000
150.000
6726009REFL PAV MRKR TY II-A-AEA104.0003.001
2
3
12.000
5.000
5.000
6776001ELIM EXT PAV MRK & MRKS (4")LF3,376.0001.001
2
3
3.600
2.250
1.500
6776007ELIM EXT PAV MRK & MRKS (24")LF36.0003.001
2
3
21.600
5.500
1.500
6786001PAV SURF PREP FOR MRK (4")LF2,896.0001.001
2
3
1.200
0.500
0.500
6786008PAV SURF PREP FOR MRK (24")LF25.0001.001
2
3
1.200
1.500
1.500
6786020PAV SURF PREP FOR MRK (RR XING)EA1.00020.001
2
3
120.000
100.000
250.000
6786023PAV SURF PREP FOR MRK (36")(YLD TRI)EA3.0005.001
2
3
24.000
75.000
250.000
30776001SP MIXES SP-B PG64-22TON1,886.000120.001
2
3
131.690
170.000
165.000
30776044SP MIXES SP-D PG64-22 (LEVEL-UP)TON83.000110.001
2
3
220.850
335.000
185.000
30776066SP MIXES SP-D SAC-B PG76-22TON306.000110.001
2
3
142.820
225.000
165.000
30776075TACK COATGAL776.0007.651
2
3
11.750
5.500
10.000
61856002002TMA (STATIONARY)DAY90.000150.001
2
3
212.780
325.000
350.000
61856005002TMA (MOBILE OPERATION)DAY10.000200.001
2
3
550.070
325.000
550.000