Tabulation of Bids for Project BR 2025(152)
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | TARRANT | Let Date: | 10/02/24 |
Type: | REHABILITATE BRIDGE | Seq No: | 3214 |
Time: | 192 WORKING DAYS | Project ID: | BR 2025(152) |
Highway: | US 377 | Contract #: | 10243214 |
Length: | 0.177 | CCSJ: | 0081-01-050 |
Limits: | |||
From: | E. BELKNAP AT TRINITY RIVER | Check: | $67,000 |
To: | . | Misc Cost: |
Estimate | $3,341,800.00 | % Over/Under | Company |
Bidder 1 | $2,055,473.49 | -38.49% | GIBSON & ASSOCIATES, INC. |
Bidder 2 | $2,089,214.00 | -37.48% | RAGLE CONSTRUCTION, INC. |
Bidder 3 | $3,592,826.78 | +7.51% | MB WESTERN INDUSTRIAL CONTRACTING CO. |
Bidder 4 | $3,822,760.38 | +14.39% | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1047006 | REMOV CONC (RIPRAP) | SY | 13.000 | 40.00 | 1 2 3 4 | 250.000 50.000 105.000 500.000 |
1047015 | REMOV CONC (CURB RAMP) | SY | 8.000 | 50.00 | 1 2 3 4 | 250.000 100.000 125.000 500.000 |
1047017 | REMOV CONC (CURB & GUTTER) | LF | 8.000 | 17.00 | 1 2 3 4 | 125.000 50.000 125.000 500.000 |
1057022 | RMV (2") TRT/UNTRT BASE & ASPH PAV | SY | 105.000 | 7.00 | 1 2 3 4 | 60.500 20.000 81.000 200.000 |
1327001 | EMBANK (FNL)(OC)(TY A) | CY | 13.000 | 60.00 | 1 2 3 4 | 400.000 150.000 145.000 100.000 |
1617002 | COMPOST MANUF TOPSOIL (4") | SY | 131.000 | 10.00 | 1 2 3 4 | 16.500 25.000 22.200 25.000 |
1627002 | BLOCK SODDING | SY | 131.000 | 4.00 | 1 2 3 4 | 8.800 25.000 11.840 25.000 |
1687001 | VEGETATIVE WATERING | TGL | 5.000 | 50.00 | 1 2 3 4 | 825.000 250.000 1,110.000 850.000 |
3417025 | D-GR HMA TY-C SAC-A PG70-22 (EXEMPT) | TON | 115.000 | 250.00 | 1 2 3 4 | 458.700 310.000 400.000 500.000 |
3417064 | D-GR HMA TY-D PG 64-22 (EXEMPT) | TON | 13.000 | 200.00 | 1 2 3 4 | 599.500 725.000 450.000 500.000 |
3417082 | TACK COAT | GAL | 229.000 | 5.00 | 1 2 3 4 | 5.060 1.000 10.000 10.000 |
3547035 | PLANE ASPH CONC PAV(0" TO 6") | SY | 4,313.000 | 12.00 | 1 2 3 4 | 6.580 9.000 8.850 30.000 |
4207052 | CL C CONC (RAIL FOUNDATION) | CY | 21.200 | 960.00 | 1 2 3 4 | 1,072.500 250.000 950.000 2,500.000 |
4207067 | CL C CONC (MISC) | CY | 2.200 | 1,500.00 | 1 2 3 4 | 1,980.000 1,150.000 1,750.000 2,500.000 |
4287001 | PENETRATING CONCRETE SURFACE TREATMENT | SY | 7,507.000 | 20.00 | 1 2 3 4 | 7.650 6.500 10.290 25.000 |
4297003 | CONC STR REPAIR(DECK REP(PART DEPTH)) | SF | 4,300.000 | 175.00 | 1 2 3 4 | 20.000 35.000 250.000 200.000 |
4297005 | CONC STR REPAIR(DECK REP (FULL DEPTH)) | SF | 66.000 | 920.00 | 1 2 3 4 | 750.000 320.000 350.000 650.000 |
4297007 | CONC STR REPAIR (VERTICAL & OVERHEAD) | SF | 845.000 | 900.00 | 1 2 3 4 | 203.500 150.000 313.760 250.000 |
4327007 | RIPRAP (CONC) (CL B) (4 IN) | CY | 3.000 | 1,500.00 | 1 2 3 4 | 1,650.000 1,750.000 1,000.000 1,200.000 |
4387001 | CLEANING AND SEALING EXISTING JOINTS | LF | 533.000 | 100.00 | 1 2 3 4 | 41.800 38.000 56.240 60.000 |
4397017 | POLYESTER POLYMER CONC OVERLAY (2") | SY | 2,834.000 | 200.00 | 1 2 3 4 | 226.000 234.000 325.000 300.000 |
4397019 | POLYESTER POLYMER CONC OVERLAY (3") | SY | 353.000 | 220.00 | 1 2 3 4 | 315.000 465.000 470.000 400.000 |
4427007 | STR STEEL (MISC NON-BRIDGE) | LB | 712.000 | 50.00 | 1 2 3 4 | 35.000 10.000 11.230 200.000 |
4507038 | RAIL (TY C411) | LF | 50.000 | 165.00 | 1 2 3 4 | 423.500 350.000 450.000 250.000 |
5007001 | MOBILIZATION | LS | 1.000 | 295,620.00 | 1 2 3 4 | 250,000.000 220,000.000 325,000.000 350,000.000 |
5027001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 9.000 | 10,000.00 | 1 2 3 4 | 16,000.000 25,000.000 5,000.000 3,500.000 |
5037002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 10,000.00 | 1 2 3 4 | 10,250.000 50,000.000 10,000.000 20,000.000 |
5057001 | TMA (STATIONARY) | DAY | 30.000 | 165.00 | 1 2 3 4 | 360.000 100.000 250.000 300.000 |
5057002 | TMA (MOBILE OPERATION) | HR | 8.000 | 75.00 | 1 2 3 4 | 100.000 100.000 250.000 300.000 |
5067020 | CONSTRUCTION EXITS (INSTALL) (TY 1) | SY | 156.000 | 21.00 | 1 2 3 4 | 37.400 34.000 50.320 50.000 |
5067024 | CONSTRUCTION EXITS (REMOVE) | SY | 156.000 | 7.25 | 1 2 3 4 | 15.400 14.000 20.720 2.000 |
5067044 | BIODEG EROSN CONT LOGS (INSTL) (12") | LF | 963.000 | 5.00 | 1 2 3 4 | 5.780 5.250 7.770 7.000 |
5067046 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 963.000 | 1.00 | 1 2 3 4 | 1.380 1.250 1.850 3.000 |
5297009 | CONC CURB & GUTTER (TY II) | LF | 132.000 | 90.00 | 1 2 3 4 | 124.000 50.000 75.000 150.000 |
5317001 | CONC SIDEWALKS (4") | SY | 20.000 | 250.00 | 1 2 3 4 | 300.000 85.000 105.000 250.000 |
5317006 | CURB RAMPS (TY 2) | EA | 1.000 | 3,000.00 | 1 2 3 4 | 4,000.000 1,750.000 3,500.000 10,000.000 |
5407001 | MTL W-BEAM GD FEN (TIM POST) | LF | 50.000 | 32.00 | 1 2 3 4 | 24.750 22.500 33.300 35.000 |
5407006 | MTL BEAM GD FEN TRANS (TL2) | EA | 2.000 | 1,450.00 | 1 2 3 4 | 1,320.000 1,200.000 1,776.000 2,000.000 |
5427001 | REMOVE METAL BEAM GUARD FENCE | LF | 88.000 | 12.00 | 1 2 3 4 | 15.000 3.000 29.600 15.000 |
5447001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 2.000 | 3,500.00 | 1 2 3 4 | 3,165.250 2,877.500 4,258.700 4,000.000 |
6587012 | INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB | EA | 18.000 | 15.00 | 1 2 3 4 | 22.000 20.000 29.600 30.000 |
6587018 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | EA | 2.000 | 26.00 | 1 2 3 4 | 27.500 25.000 37.000 40.000 |
6587056 | INSTL OM ASSM (OM-2Y)(WC)GND | EA | 2.000 | 80.00 | 1 2 3 4 | 66.000 60.000 88.800 40.000 |
6627112 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 144.000 | 10.00 | 1 2 3 4 | 2.000 1.000 5.000 0.010 |
6627114 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 94.000 | 10.00 | 1 2 3 4 | 2.000 1.000 5.000 0.010 |
6667347 | PAVEMENT SLER 6" | LF | 3,228.000 | 0.50 | 1 2 3 4 | 0.280 0.750 0.250 1.000 |
6667407 | REFL PAV MRK TY I (W)6"(BRK)(090MIL) | LF | 460.000 | 1.00 | 1 2 3 4 | 1.210 2.000 3.090 2.000 |
6667410 | REFL PAV MRK TY I (W)6"(SLD)(090MIL) | LF | 1,911.000 | 1.00 | 1 2 3 4 | 1.210 1.750 2.960 2.000 |
6667422 | REFL PAV MRK TY I (Y)6"(SLD)(090MIL) | LF | 1,873.000 | 1.00 | 1 2 3 4 | 1.210 1.750 2.960 2.000 |
6727002 | REFL PAV MRKR TY I-C | EA | 28.000 | 6.00 | 1 2 3 4 | 11.000 10.000 11.840 20.000 |
6727004 | REFL PAV MRKR TY II-A-A | EA | 28.000 | 6.00 | 1 2 3 4 | 11.000 10.000 11.840 20.000 |
7787001 | CONCRETE RAIL REPAIR (IN-KIND) | LF | 183.000 | 400.00 | 1 2 3 4 | 440.000 150.000 250.000 500.000 |
7787004 | CONCRETE RAIL REPLACEMENT (IN-KIND) | LF | 51.000 | 410.00 | 1 2 3 4 | 550.000 540.000 500.000 500.000 |
7807002 | CNC CRACK REPAIR (DISCRETE)(INJECT) | LF | 1,965.000 | 75.00 | 1 2 3 4 | 55.000 50.000 149.480 165.000 |
7857004 | BRIDGE JOINT REPAIR (ARMOR) | LF | 82.000 | 670.00 | 1 2 3 4 | 240.000 150.000 355.200 1,000.000 |