The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | CASS | Let Date: | 10/07/22 |
Type: | BRIDGE PREVENTATIVE MAINTENANCE | Seq No: | 4202 |
Time: | 100 W | Project ID: | BPM - 642095001 |
Highway: | SH0155 | Contract #: | 10224202 |
Length: | 0.010 | CCSJ: | 6420-95-001 |
Limits: | |||
From: | VARIOUS ROADWAYS | Check: | $14,000 |
To: | VARIOUS ROADWAYS | Misc Cost: |
Estimate | $695,776.40 | % Over/Under | Company |
Bidder 1 | $606,935.00 | -12.77% | THK CONSTRUCTION LLC |
Bidder 2 | $631,662.00 | -9.21% | TALBRAN ENTERPRISES LLC |
Bidder 3 | $650,881.00 | -6.45% | 3LW CIVIL LLC |
Bidder 4 | $653,671.00 | -6.05% | CROSS PLUS CONSTRUCTION, LLC |
Bidder 5 | $662,880.00 | -4.73% | GARRET SHIELDS INFRASTRUCTURE |
Bidder 6 | $772,895.00 | +11.08% | SHALOM SERVICES CORPORATION |
Bidder 7 | $773,785.00 | +11.21% | HODGES AND SON CONSTRUCTION COMPANY, INC. |
Bidder 8 | $871,760.00 | +25.29% | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC |
Bidder 9 | $932,710.00 | +34.05% | EAST TEXAS BRIDGE, INC. |
Bidder 10 | $942,670.00 | +35.48% | SCR CIVIL CONSTRUCTION, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1046009 | REMOVING CONC (RIPRAP) | SY | 472.000 | 20.00 | 1 2 3 4 5 6 7 8 9 10 | 20.000 110.000 57.500 22.000 40.000 80.000 55.000 100.000 50.000 84.000 |
1046025 | REMOVE CONC (WINGWALL) | CY | 4.000 | 422.00 | 1 2 3 4 5 6 7 8 9 10 | 250.000 1,650.000 432.000 550.000 500.000 135.000 8,000.000 250.000 500.000 4,500.000 |
1106002 | EXCAVATION (CHANNEL) | CY | 130.000 | 30.00 | 1 2 3 4 5 6 7 8 9 10 | 20.000 88.000 31.000 19.000 50.000 30.000 40.000 100.000 50.000 85.000 |
1326001 | EMBANKMENT (FINAL)(ORD COMP)(TY A) | CY | 117.000 | 35.00 | 1 2 3 4 5 6 7 8 9 10 | 25.000 55.000 49.000 44.000 80.000 35.000 50.000 40.000 75.000 228.000 |
4016001 | FLOWABLE BACKFILL | CY | 75.000 | 280.00 | 1 2 3 4 5 6 7 8 9 10 | 350.000 550.000 350.000 275.000 300.000 500.000 225.000 350.000 450.000 520.000 |
4036001 | TEMPORARY SPL SHORING | SF | 200.000 | 48.00 | 1 2 3 4 5 6 7 8 9 10 | 60.000 1.000 60.000 55.000 100.000 15.000 50.000 100.000 120.000 14.000 |
4296005 | CONC STR REPAIR(DECK REP (FULL DEPTH)) | SF | 15.000 | 250.00 | 1 2 3 4 5 6 7 8 9 10 | 200.000 880.000 292.000 330.000 200.000 600.000 320.000 325.000 700.000 365.000 |
4296007 | CONC STR REPAIR (VERTICAL & OVERHEAD) | SF | 310.000 | 230.00 | 1 2 3 4 5 6 7 8 9 10 | 110.000 205.000 244.000 165.000 180.000 150.000 150.000 200.000 300.000 320.000 |
4326001 | RIPRAP (CONC)(4 IN) | CY | 3.000 | 605.00 | 1 2 3 4 5 6 7 8 9 10 | 800.000 1,200.000 610.000 825.000 500.000 800.000 1,000.000 750.000 1,000.000 4,200.000 |
4326033 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 405.000 | 150.00 | 1 2 3 4 5 6 7 8 9 10 | 200.000 330.000 245.000 248.000 180.000 200.000 300.000 400.000 185.000 460.000 |
4326039 | BEDDING MATERIAL (6 IN) | CY | 136.000 | 130.00 | 1 2 3 4 5 6 7 8 9 10 | 175.000 275.000 145.000 165.000 40.000 200.000 300.000 400.000 185.000 536.000 |
4386002 | CLEANING AND SEALING EXIST JOINTS(CL3) | LF | 1,020.000 | 27.00 | 1 2 3 4 5 6 7 8 9 10 | 40.000 6.000 41.750 33.000 40.000 60.000 30.000 40.000 45.000 45.000 |
4666153 | WINGWALL (FW - 0) (HW=6 FT) | EA | 1.000 | 13,000.00 | 1 2 3 4 5 6 7 8 9 10 | 13,000.000 22,000.000 9,500.000 15,400.000 25,000.000 18,000.000 15,000.000 35,000.000 55,000.000 2,600.000 |
4666158 | WINGWALL (FW - S) (HW=11 FT) | EA | 1.000 | 36,350.00 | 1 2 3 4 5 6 7 8 9 10 | 18,000.000 28,000.000 23,650.000 24,200.000 50,000.000 60,000.000 25,000.000 75,000.000 95,000.000 28,500.000 |
4806002 | CLEAN EXIST CULVERTS | CY | 130.000 | 65.00 | 1 2 3 4 5 6 7 8 9 10 | 24.000 115.000 48.000 110.000 100.000 100.000 160.000 750.000 150.000 170.000 |
5006001 | MOBILIZATION | LS | 1.000 | 61,752.40 | 1 2 3 4 5 6 7 8 9 10 | 65,000.000 15,000.000 80,000.000 66,000.000 60,000.000 40,000.000 55,000.000 125,000.000 85,000.000 91,400.000 |
5026025008 | BARR, SIGNS, TRAFFIC HANDLING | EA | 15.000 | 3,570.00 | 1 2 3 4 5 6 7 8 9 10 | 4,000.000 500.000 6,500.000 3,300.000 7,500.000 6,500.000 12,500.000 1,000.000 9,000.000 4,900.000 |
7786013 | CONCRETE RAIL REPLACEMENT (TYPE 201) | LF | 7.000 | 610.00 | 1 2 3 4 5 6 7 8 9 10 | 1,500.000 2,750.000 640.000 440.000 1,000.000 500.000 250.000 600.000 1,000.000 2,300.000 |
7786014 | CONCRETE RAIL REPLACEMENT (TYPE 202) | LF | 10.000 | 610.00 | 1 2 3 4 5 6 7 8 9 10 | 1,500.000 2,800.000 640.000 440.000 1,000.000 500.000 250.000 600.000 1,000.000 2,155.000 |
7786021 | CONCRETE RAIL REPLACEMENT (TYPE 501) | LF | 25.000 | 630.00 | 1 2 3 4 5 6 7 8 9 10 | 1,500.000 3,300.000 649.000 440.000 500.000 340.000 250.000 600.000 1,000.000 1,400.000 |
7806002 | CNC CRACK REPAIR (DISCRETE)(INJECT) | LF | 250.000 | 78.00 | 1 2 3 4 5 6 7 8 9 10 | 100.000 110.000 105.000 55.000 50.000 190.000 150.000 50.000 150.000 75.000 |
7856002 | BRIDGE JOINT REPAIR (POLYMER) | LF | 500.000 | 462.00 | 1 2 3 4 5 6 7 8 9 10 | 190.000 23.000 105.000 330.000 150.000 300.000 120.000 60.000 150.000 95.000 |
60016001 | PORTABLE CHANGEABLE MESSAGE SIGN | DAY | 24.000 | 100.00 | 1 2 3 4 5 6 7 8 9 10 | 150.000 1.000 100.000 1.000 200.000 50.000 200.000 70.000 350.000 100.000 |
61856002002 | TMA (STATIONARY) | DAY | 73.000 | 152.00 | 1 2 3 4 5 6 7 8 9 10 | 300.000 1.000 75.000 275.000 300.000 200.000 200.000 225.000 400.000 325.000 |