Tabulation of Bids for Project STP 2018(292)TP

Last Update: Thursday, November 16, 2017
Text version of this page
County:HARRISLet Date:11/03/17
Type:CONSTRUCT 6 TO 8 FT SIDEWALKSeq No:3220
Time:50 WORKING DAYSProject ID:STP 2018(292)TP
Highway:SL 8Contract #:11173220
Length:0.880CCSJ:3256-01-109
Limits: 
From:BRIAR HILLCheck:$12,000
To:MEMORIAL DRIVEMisc Cost:$5,000.00
Estimate$592,080.00% Over/UnderCompany
Bidder 1$486,999.66-17.75%RAGLE CONSTRUCTION, INC.
Bidder 2$496,071.45-16.22%ISI CONTRACTING, INC.
Bidder 3$498,894.78-15.74%TEXAS WALL & LANDSCAPE
Bidder 4$524,523.15-11.41%ARANDA BROTHERS CONSTRUCTION CO., INC.
Bidder 5$585,323.06-1.14%HIGHWAY 19 CONSTRUCTION LLC
Bidder 6$588,067.30-0.68%TI-ZACK CONCRETE, INC.
Bidder 7$637,738.06+7.71%MAIN LANE INDUSTRIES LTD.
Bidder 8$690,827.50+16.68%FNH CONSTRUCTION, LLC
Bidder 9$756,948.70+27.85%ALTUS CONSTRUCTION LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA41.7402,500.001
2
3
4
5
6
7
8
9
950.000
750.000
1,000.000
1,350.000
1,000.000
1,000.000
2,000.000
1,500.000
1,642.270
1046001REMOVING CONC (PAV)SY105.00010.001
2
3
4
5
6
7
8
9
10.000
25.000
12.000
20.000
25.000
20.000
20.000
20.000
9.060
1046017REMOVING CONC (DRIVEWAYS)SY142.0007.001
2
3
4
5
6
7
8
9
10.000
35.000
10.000
20.000
25.000
20.000
50.000
20.000
16.510
1046036REMOVING CONC (SIDEWALK OR RAMP)SY1,712.0007.001
2
3
4
5
6
7
8
9
5.000
11.000
2.000
10.000
25.000
10.000
20.000
20.000
16.350
1056008REMOVING STAB BASE AND ASPH PAV (6")SY105.0008.001
2
3
4
5
6
7
8
9
10.000
18.000
8.000
10.000
17.000
25.000
2.000
20.000
5.380
1106003EXCAVATION (SPECIAL)CY200.00015.001
2
3
4
5
6
7
8
9
80.000
48.000
30.000
15.000
20.000
25.000
25.000
20.000
16.760
1326007002EMBANKMENT (FINAL)(ORD COMP)(TY D)CY56.00020.001
2
3
4
5
6
7
8
9
20.000
43.000
40.000
20.000
30.000
25.000
25.000
35.000
40.320
1626002BLOCK SODDINGSY8,283.0003.001
2
3
4
5
6
7
8
9
1.000
4.000
3.000
5.000
5.000
4.000
3.000
5.500
6.880
1666001FERTILIZERAC1.7501,000.001
2
3
4
5
6
7
8
9
700.000
800.000
750.000
1,250.000
2,500.000
1,500.000
700.000
2,500.000
1,060.360
1686001VEGETATIVE WATERINGMG210.00020.001
2
3
4
5
6
7
8
9
20.000
15.000
35.000
20.000
100.000
25.000
50.000
100.000
141.120
4006005CEM STABIL BKFLCY2.000250.001
2
3
4
5
6
7
8
9
100.000
100.000
85.000
60.000
250.000
250.000
50.000
200.000
157.260
4006009CEMENT STAB BACKFILL (INLET OR MH)CY18.000150.001
2
3
4
5
6
7
8
9
95.000
50.000
85.000
60.000
200.000
250.000
50.000
250.000
116.640
4026001TRENCH EXCAVATION PROTECTIONLF16.00030.001
2
3
4
5
6
7
8
9
1.000
1.000
2.000
10.000
10.000
15.000
25.000
3.500
164.690
4206071CL C CONC (COLLAR)EA1.0001,500.001
2
3
4
5
6
7
8
9
775.000
3,000.000
1,500.000
1,650.000
1,000.000
1,000.000
1,000.000
1,500.000
2,232.270
4646005RC PIPE (CL III)(24 IN)LF2.000200.001
2
3
4
5
6
7
8
9
380.000
500.000
500.000
100.000
100.000
85.000
300.000
150.000
131.960
4656168INLET (COMPL)(TY A)EA2.0003,000.001
2
3
4
5
6
7
8
9
3,500.000
3,500.000
4,200.000
1,850.000
5,000.000
2,500.000
7,000.000
5,000.000
7,897.830
4796001ADJUSTING MANHOLESEA7.0001,000.001
2
3
4
5
6
7
8
9
750.000
500.000
800.000
1,250.000
1,000.000
500.000
750.000
1,500.000
1,397.970
4966002REMOV STR (INLET)EA2.0001,000.001
2
3
4
5
6
7
8
9
450.000
600.000
1,100.000
750.000
1,000.000
500.000
500.000
2,500.000
1,396.760
4966007REMOV STR (PIPE)LF2.000100.001
2
3
4
5
6
7
8
9
60.000
300.000
175.000
50.000
10.000
25.000
50.000
30.000
27.650
5006001MOBILIZATIONLS1.00057,634.001
2
3
4
5
6
7
8
9
48,000.000
49,000.000
49,000.000
57,500.000
50,000.000
45,000.000
60,000.000
70,000.000
67,200.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO3.0008,000.001
2
3
4
5
6
7
8
9
16,000.000
7,000.000
4,500.000
1,700.000
5,000.000
1,000.000
10,000.000
8,500.000
6,720.000
5066038003TEMP SEDMT CONT FENCE (INSTALL)LF3,893.0003.001
2
3
4
5
6
7
8
9
2.600
3.250
2.750
3.050
3.000
2.400
2.500
4.000
4.050
5066039003TEMP SEDMT CONT FENCE (REMOVE)LF3,893.0001.001
2
3
4
5
6
7
8
9
0.600
1.400
1.250
1.000
1.000
0.700
0.500
2.000
1.240
5066040003BIODEG EROSN CONT LOGS (INSTL) (8")LF150.0007.001
2
3
4
5
6
7
8
9
2.100
7.000
9.000
8.000
5.000
7.000
8.000
12.000
14.050
5066041003BIODEG EROSN CONT LOGS (INSTL) (12")LF36.00010.001
2
3
4
5
6
7
8
9
5.500
9.000
9.000
9.000
5.000
8.000
10.000
12.000
12.450
5066043003BIODEG EROSN CONT LOGS (REMOVE)LF186.0003.001
2
3
4
5
6
7
8
9
1.000
1.500
1.000
2.000
1.000
1.000
2.000
8.000
2.280
5286008COLORED TEXTURED CONC (5")SY41.000125.001
2
3
4
5
6
7
8
9
80.000
140.000
200.000
80.000
100.000
125.000
200.000
150.000
137.880
5296011CONC CURB (DOWEL)LF28.00015.001
2
3
4
5
6
7
8
9
15.000
28.000
20.000
20.000
45.000
25.000
40.000
30.000
15.300
5296036CONCRETE CURB (SPECIAL)LF600.00030.001
2
3
4
5
6
7
8
9
15.000
46.000
25.000
9.000
65.000
35.000
90.000
30.000
60.570
5306025DRIVEWAYS (CONC) (FAST TRACK)SY142.00090.001
2
3
4
5
6
7
8
9
75.000
115.000
80.000
110.000
100.000
75.000
190.000
200.000
122.800
5316002CONC SIDEWALKS (5")SY3,456.00065.001
2
3
4
5
6
7
8
9
60.000
50.000
63.000
60.000
60.000
65.000
57.000
65.000
79.530
5316004CURB RAMPS (TY 1)EA3.0002,000.001
2
3
4
5
6
7
8
9
1,500.000
2,000.000
1,350.000
1,350.000
1,800.000
1,200.000
1,900.000
1,850.000
1,863.150
5316009CURB RAMPS (TY 6)EA9.0002,000.001
2
3
4
5
6
7
8
9
1,000.000
2,000.000
1,700.000
1,450.000
1,800.000
12,000.000
2,100.000
1,850.000
3,427.790
5316013CURB RAMPS (TY 10)EA1.0001,500.001
2
3
4
5
6
7
8
9
2,250.000
2,000.000
1,300.000
1,350.000
1,100.000
1,200.000
1,900.000
1,850.000
2,473.200
5316038CURB RAMPS (TY 10) (MOD)EA1.0002,000.001
2
3
4
5
6
7
8
9
2,250.000
2,000.000
1,500.000
1,352.000
1,100.000
1,200.000
1,900.000
2,500.000
5,554.730
5316049CURB RAMPS (TY 11)(MOD)EA2.0002,500.001
2
3
4
5
6
7
8
9
2,250.000
2,000.000
2,500.000
1,450.000
2,500.000
1,200.000
2,100.000
2,500.000
3,181.250
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA2.000500.001
2
3
4
5
6
7
8
9
510.000
750.000
600.000
550.000
510.000
250.000
510.000
650.000
683.020
6446068RELOCATE SM RD SN SUP&AM TY 10BWGEA8.000450.001
2
3
4
5
6
7
8
9
360.000
400.000
450.000
375.000
360.000
250.000
360.000
650.000
1,081.380
6446070RELOCATE SM RD SN SUP&AM TY S80EA1.000400.001
2
3
4
5
6
7
8
9
360.000
400.000
450.000
375.000
360.000
250.000
360.000
650.000
353.120
6446076REMOVE SM RD SN SUP&AMEA9.000150.001
2
3
4
5
6
7
8
9
74.000
100.000
90.000
250.000
74.000
150.000
74.000
50.000
123.590
6786006PAV SURF PREP FOR MRK (12")LF872.0000.501
2
3
4
5
6
7
8
9
0.060
1.000
0.060
10.000
0.060
1.000
0.060
8.000
0.620
6786008PAV SURF PREP FOR MRK (24")LF158.0001.001
2
3
4
5
6
7
8
9
0.130
1.000
0.120
12.000
0.130
5.000
0.130
20.000
1.110
50336002REMOVABLE BOLLARDEA4.0001,200.001
2
3
4
5
6
7
8
9
1,000.000
800.000
1,800.000
1,650.000
500.000
250.000
1,000.000
150.000
1,008.000
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY114.00060.001
2
3
4
5
6
7
8
9
100.000
73.000
82.000
90.000
66.000
25.000
60.000
150.000
67.740
60386011MULTIPOLYMER PAV MRK (W)(12")(SLD)LF872.0005.001
2
3
4
5
6
7
8
9
4.200
5.000
4.000
6.000
4.200
8.000
4.200
8.000
4.090
60386013MULTIPOLYMER PAV MRK (W)(24")(SLD)LF158.00010.001
2
3
4
5
6
7
8
9
8.100
9.000
10.000
8.000
8.100
10.000
8.100
20.000
15.730