Tabulation of Bids for Project BR 1802(318)

Last Update: Tuesday, January 26, 2021

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:STONEWALLLet Date:11/05/20
Type:BRIDGE REPLACEMENT & APPROACHESSeq No:3216
Time:358 WORKING DAYSProject ID:BR 1802(318)
Highway:US 83Contract #:11203216
Length:0.137CCSJ:0033-01-040
Limits: 
From:DOUBLE MTN FORK BRIDGECheck:$90,000
To:DOUBLE MTN FORK BRIDGEMisc Cost:
Estimate$4,519,026.56% Over/UnderCompany
Bidder 1$4,007,232.00-11.33%INTEGRITY SERVICES, LLC
Bidder 2$4,334,790.50-4.08%EARTH BUILDERS, L.P.
Bidder 3$4,534,985.60+0.35%HODGES AND SON CONSTRUCTION COMPANY, INC.
Bidder 4$4,672,631.48+3.40%COPPELL CONSTRUCTION CO., INC.
Bidder 5$5,574,018.00+23.35%STATELINE CONSTRUCTION, LLC
Bidder 6$6,101,096.13+35.01%FLUOR HEAVY CIVIL, LLC
Bidder 7$7,552,619.05+67.13%ALLEN BUTLER CONSTRUCTION, INC.
Bidder 8$8,492,666.20+87.93%FNF CONSTRUCTION, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA22.0005,700.001
2
3
4
5
6
7
8
1,000.000
5,000.000
4,000.000
1,200.000
5,600.000
9,221.160
2,164.000
1,000.000
1056075REMOV STAB BASE AND ASPH PAV (10"-18")SY4,688.00010.001
2
3
4
5
6
7
8
6.520
8.000
10.000
7.000
11.250
8.000
8.100
5.000
1106001EXCAVATION (ROADWAY)CY1,074.00020.001
2
3
4
5
6
7
8
10.000
10.000
20.000
12.000
12.000
27.000
33.500
8.000
1326004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY1,717.00018.001
2
3
4
5
6
7
8
16.000
18.000
25.000
26.000
16.000
45.000
53.500
32.000
1646041DRILL SEEDING (TEMP) (WARM)SY5,536.0000.101
2
3
4
5
6
7
8
0.490
0.600
0.500
0.360
0.650
0.570
1.300
0.200
1646043DRILL SEEDING (TEMP) (COOL)SY5,536.0000.101
2
3
4
5
6
7
8
0.490
0.600
0.500
0.370
0.650
0.570
1.300
0.200
1646054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY5,536.0000.651
2
3
4
5
6
7
8
0.920
1.000
1.500
1.000
2.350
2.120
2.550
0.800
1686001VEGETATIVE WATERINGMG202.00029.001
2
3
4
5
6
7
8
25.920
80.000
1.000
30.000
20.000
50.000
76.000
24.000
1696004SOIL RETENTION BLANKETS (CL 1) (TY D)SY5,536.0003.311
2
3
4
5
6
7
8
2.160
2.300
3.000
1.000
5.250
1.770
4.800
2.000
2476041003FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)CY1,980.00050.001
2
3
4
5
6
7
8
67.510
55.000
65.000
77.000
52.500
90.000
89.500
87.000
3106005PRIME COAT (AE-P)GAL1,017.0005.001
2
3
4
5
6
7
8
6.370
5.000
8.000
11.000
14.000
5.000
9.500
10.000
3166001002ASPH (MULTI OPTION)GAL2,137.0004.001
2
3
4
5
6
7
8
5.500
5.000
12.000
9.000
11.000
4.000
4.700
6.300
3166175002AGGR(TY-B GR-4 SAC-B)CY41.000155.001
2
3
4
5
6
7
8
127.370
300.000
700.000
590.000
700.000
100.000
609.000
853.000
3546045PLANE ASPH CONC PAV (2")SY6,089.0002.001
2
3
4
5
6
7
8
2.160
4.000
12.000
2.000
6.750
2.370
2.500
3.000
4006005CEM STABIL BKFLCY129.000220.001
2
3
4
5
6
7
8
220.000
200.000
250.000
360.000
235.000
201.080
263.500
400.000
4036001TEMPORARY SPL SHORINGSF1,026.00028.001
2
3
4
5
6
7
8
25.000
20.000
40.000
50.000
46.000
54.420
70.000
115.000
4166004DRILL SHAFT (36 IN)LF875.000250.001
2
3
4
5
6
7
8
177.450
210.000
220.000
238.000
230.000
214.460
269.000
500.000
4166005DRILL SHAFT (42 IN)LF280.000400.001
2
3
4
5
6
7
8
236.250
270.000
285.000
316.000
295.000
303.320
372.000
600.000
4206014CL C CONC (ABUT)(HPC)CY61.7002,000.001
2
3
4
5
6
7
8
1,150.000
1,500.000
1,100.000
1,525.000
1,225.000
2,647.150
3,402.000
2,400.000
4206030CL C CONC (CAP)(HPC)CY144.10033.001
2
3
4
5
6
7
8
1,150.000
1,500.000
1,000.000
1,200.000
1,350.000
2,039.460
2,930.000
2,000.000
4206038CL C CONC (COLUMN)(HPC)CY170.5001,500.001
2
3
4
5
6
7
8
1,250.000
1,500.000
800.000
1,200.000
1,475.000
2,406.920
2,778.000
1,905.000
4226002REINF CONC SLAB (HPC)SF24,976.00033.001
2
3
4
5
6
7
8
22.000
23.000
21.000
25.000
26.850
38.430
46.500
42.000
4226016APPROACH SLAB (HPC)CY115.600750.001
2
3
4
5
6
7
8
600.000
680.000
700.000
500.000
650.000
1,136.990
1,249.000
1,200.000
4256036PRESTR CONC GIRDER (TX34)LF1,918.000220.001
2
3
4
5
6
7
8
130.020
150.000
220.000
226.000
160.000
185.810
286.000
315.000
4256037PRESTR CONC GIRDER (TX40)LF1,183.000200.001
2
3
4
5
6
7
8
133.480
150.000
220.000
232.000
165.000
215.010
241.500
280.000
4276004003SILICONE RESIN PAINT FINISHSF770.00020.001
2
3
4
5
6
7
8
10.750
12.000
10.000
32.000
16.000
23.750
13.000
16.000
4326010RIPRAP (CONC)(CL B)(5 IN)CY129.000470.001
2
3
4
5
6
7
8
500.000
650.000
550.000
600.000
495.000
1,418.250
874.000
940.000
4326045RIPRAP (MOW STRIP)(4 IN)CY38.000505.001
2
3
4
5
6
7
8
475.000
650.000
550.000
800.000
485.000
1,504.930
717.000
1,100.000
4506007RAIL (TY T223)(HPC)LF928.000175.001
2
3
4
5
6
7
8
125.000
100.000
125.000
165.000
130.000
332.720
270.000
265.000
4546004ARMOR JOINT (SEALED)LF156.000100.001
2
3
4
5
6
7
8
82.920
95.000
75.000
98.000
85.000
466.540
199.500
190.000
4966010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA1.000125,000.001
2
3
4
5
6
7
8
174,960.000
350,000.000
175,000.000
269,000.000
265,000.000
150,000.000
344,576.000
1,150,000.000
4966043REMOV STR (SMALL FENCE)LF52.0003.001
2
3
4
5
6
7
8
4.750
3.000
10.000
12.000
25.000
31.820
27.500
13.000
5006001MOBILIZATIONLS1.000407,880.001
2
3
4
5
6
7
8
364,624.220
450,000.000
395,000.000
450,000.000
550,000.000
610,000.000
1,112,926.000
840,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO20.00010,000.001
2
3
4
5
6
7
8
5,694.300
1,200.000
7,000.000
1,371.000
4,500.000
9,376.890
2,633.000
7,200.000
5066001005ROCK FILTER DAMS (INSTALL) (TY 1)LF140.00032.001
2
3
4
5
6
7
8
42.010
70.000
1.000
30.000
45.000
43.960
64.500
38.000
5066011005ROCK FILTER DAMS (REMOVE)LF140.00012.001
2
3
4
5
6
7
8
17.720
5.000
1.000
12.000
15.000
18.550
15.000
11.000
5066020005CONSTRUCTION EXITS (INSTALL) (TY 1)SY222.00030.001
2
3
4
5
6
7
8
40.070
45.000
1.000
30.000
40.000
41.930
64.000
38.000
5066024005CONSTRUCTION EXITS (REMOVE)SY222.0009.001
2
3
4
5
6
7
8
15.720
5.000
1.000
12.000
15.000
16.450
14.500
11.000
5066038005TEMP SEDMT CONT FENCE (INSTALL)LF1,650.0003.001
2
3
4
5
6
7
8
5.030
3.200
1.000
2.500
3.000
5.260
3.850
5.000
5066039005TEMP SEDMT CONT FENCE (REMOVE)LF1,650.0001.001
2
3
4
5
6
7
8
1.410
1.000
1.000
1.000
1.000
1.470
1.300
1.000
5066041005BIODEG EROSN CONT LOGS (INSTL) (12")LF470.0006.501
2
3
4
5
6
7
8
11.610
3.000
8.000
4.500
8.750
12.150
6.900
8.000
5106003ONE-WAY TRAF CONT (PORT TRAF SIG)MO20.0005,000.001
2
3
4
5
6
7
8
1,998.000
4,000.000
5,000.000
3,500.000
5,600.000
2,825.000
3,628.000
4,900.000
5126013PORT CTB (DES SOURCE)(SGL SLP)(TY 1)LF4,560.00010.001
2
3
4
5
6
7
8
26.380
30.000
30.000
27.000
88.000
15.000
34.500
32.000
5126037PORT CTB (STKPL)(SGL SLP)(TY 1)LF4,560.00010.001
2
3
4
5
6
7
8
15.340
10.000
30.000
16.000
16.000
10.000
23.000
21.000
5336001RUMBLE STRIPS (SHOULDER)LF4,220.0000.151
2
3
4
5
6
7
8
1.080
3.000
4.000
3.000
4.500
0.500
1.200
1.200
5336002RUMBLE STRIPS (CENTERLINE)LF2,110.0000.191
2
3
4
5
6
7
8
1.080
3.000
2.000
5.000
4.500
0.500
1.800
2.200
5406001001MTL W-BEAM GD FEN (TIM POST)LF287.50023.001
2
3
4
5
6
7
8
21.000
25.000
26.000
23.000
26.000
20.000
33.500
27.000
5406006001MTL BEAM GD FEN TRANS (THRIE-BEAM)EA4.0002,000.001
2
3
4
5
6
7
8
1,443.750
1,500.000
1,200.000
2,100.000
1,600.000
1,375.000
2,568.000
2,200.000
5426001REMOVE METAL BEAM GUARD FENCELF750.0003.001
2
3
4
5
6
7
8
2.630
3.000
2.000
2.500
3.000
2.500
391.500
5.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA1.000300.001
2
3
4
5
6
7
8
210.000
250.000
500.000
225.000
500.000
200.000
449.500
400.000
5426004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA4.000275.001
2
3
4
5
6
7
8
157.500
250.000
200.000
150.000
500.000
150.000
449.500
400.000
5436001CABLE BARRIER SYSTEM (TL-3)LF26.00011.001
2
3
4
5
6
7
8
18.000
25.000
50.000
225.000
125.000
10.190
38.500
32.000
5436019CABLE BARRIER TERMINAL SECTION (TL-3)EA2.0003,000.001
2
3
4
5
6
7
8
5,275.000
5,500.000
5,000.000
6,200.000
1,500.000
2,900.000
5,137.000
4,100.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA4.0002,700.001
2
3
4
5
6
7
8
2,625.000
2,500.000
2,600.000
2,800.000
2,850.000
2,500.000
3,853.000
3,100.000
5446003GUARDRAIL END TREATMENT (REMOVE)EA3.000290.001
2
3
4
5
6
7
8
210.000
250.000
500.000
225.000
500.000
200.000
449.500
400.000
5456003CRASH CUSH ATTEN (MOVE & RESET)EA2.0002,300.001
2
3
4
5
6
7
8
2,625.000
2,000.000
5,000.000
2,900.000
2,000.000
2,500.000
3,210.000
1,000.000
5456004CRASH CUSH ATTEN (STKPL)EA2.0001,500.001
2
3
4
5
6
7
8
2,625.000
2,000.000
2,000.000
2,900.000
2,000.000
2,500.000
1,605.000
450.000
5456019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA2.00010,000.001
2
3
4
5
6
7
8
9,791.250
9,000.000
15,000.000
11,000.000
11,500.000
9,325.000
9,631.000
15,000.000
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA1.000600.001
2
3
4
5
6
7
8
945.000
450.000
800.000
1,000.000
1,000.000
451.500
995.000
780.000
6446004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA4.000790.001
2
3
4
5
6
7
8
1,155.000
650.000
800.000
1,300.000
900.000
616.750
1,284.000
1,100.000
6446030IN SM RD SN SUP&AM TYS80(1)SA(T)EA2.000750.001
2
3
4
5
6
7
8
1,365.000
1,000.000
800.000
1,600.000
1,000.000
913.100
1,669.000
1,350.000
6446076REMOVE SM RD SN SUP&AMEA5.00090.001
2
3
4
5
6
7
8
136.500
100.000
100.000
150.000
250.000
78.450
128.500
80.000
6586014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA10.00022.001
2
3
4
5
6
7
8
36.750
30.000
50.000
42.000
45.000
50.000
46.000
40.000
6586062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA6.00030.001
2
3
4
5
6
7
8
26.250
15.000
50.000
30.000
45.000
25.000
58.000
50.000
6626004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF4,214.0000.401
2
3
4
5
6
7
8
1.080
1.200
1.500
1.200
1.250
0.120
1.300
1.100
6626063WK ZN PAV MRK REMOV (W)4"(SLD)LF5,037.0001.001
2
3
4
5
6
7
8
1.780
1.200
2.000
1.200
1.250
1.280
1.300
1.100
6626075WK ZN PAV MRK REMOV (W)24"(SLD)LF24.0007.001
2
3
4
5
6
7
8
21.600
25.000
20.000
23.000
25.000
5.000
25.500
22.000
6626095WK ZN PAV MRK REMOV (Y)4"(SLD)LF4,200.0001.001
2
3
4
5
6
7
8
1.080
1.200
2.000
1.200
1.250
1.280
1.300
1.100
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF4,220.0000.351
2
3
4
5
6
7
8
0.970
1.100
1.500
1.000
1.250
0.900
1.150
1.100
6666312007RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF595.0000.351
2
3
4
5
6
7
8
0.970
1.100
1.500
1.000
1.250
0.980
1.150
1.100
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF3,475.0000.351
2
3
4
5
6
7
8
0.970
1.100
1.500
1.000
1.250
0.920
1.150
1.100
6726009REFL PAV MRKR TY II-A-AEA54.0003.001
2
3
4
5
6
7
8
10.080
14.000
15.000
10.000
15.000
5.000
13.000
12.000
6776001ELIM EXT PAV MRK & MRKS (4")LF8,858.0001.001
2
3
4
5
6
7
8
0.970
1.100
1.200
1.000
1.250
0.980
2.350
1.100
30776013SP MIXES SP-C SAC-B PG64-22TON840.000120.001
2
3
4
5
6
7
8
120.370
120.000
180.000
139.000
185.000
100.000
146.500
120.000
30776053SP MIXES SP-D SAC-B PG70-22TON1,229.000100.001
2
3
4
5
6
7
8
130.000
125.000
180.000
139.000
175.000
100.000
133.500
130.000
30776075TACK COATGAL1,118.0004.001
2
3
4
5
6
7
8
4.500
6.000
6.000
4.000
8.000
4.000
11.500
15.000
40276001TEMP CONSTRUCTION ACCESSLS1.000200,000.001
2
3
4
5
6
7
8
389,160.510
175,000.000
190,000.000
247,000.000
625,850.000
425,692.680
179,606.000
1,000,000.000
60016002PORTABLE CHANGEABLE MESSAGE SIGNEA3.00015,000.001
2
3
4
5
6
7
8
15,750.000
15,000.000
2,500.000
7,200.000
15,000.000
11,000.000
24,674.000
25,000.000
61856002002TMA (STATIONARY)DAY10.000200.001
2
3
4
5
6
7
8
166.280
250.000
200.000
475.000
450.000
142.000
1,755.000
230.000
61856005002TMA (MOBILE OPERATION)DAY10.000200.001
2
3
4
5
6
7
8
366.280
300.000
200.000
700.000
950.000
1,535.070
940.000
1,000.000