Tabulation of Bids for Project NH 2019(201)
Text version of this page | |||
County: | BOWIE | Let Date: | 11/07/18 |
Type: | PLANING, ACP & PAV MRKS | Seq No: | 3214 |
Time: | 75 WORKING DAYS | Project ID: | NH 2019(201) |
Highway: | US 59 | Contract #: | 11183214 |
Length: | 4.055 | CCSJ: | 0218-01-096 |
Limits: | |||
From: | 0.3 MI. S. OF FM 989 | Check: | $96,000 |
To: | 0.5 MI. S. OF FM 2148 | Misc Cost: | $24,000.00 |
Estimate | $4,788,910.40 | % Over/Under | Company |
Bidder 1 | $4,256,573.98 | -11.12% | RK HALL, LLC |
Bidder 2 | $4,844,091.64 | +1.15% | EAST TEXAS BRIDGE, INC. |
Bidder 3 | $5,099,545.40 | +6.49% | LONGVIEW BRIDGE AND ROAD, LTD. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 55.500 | 3,000.00 | 1 2 3 | 551.250 1,500.000 1,000.000 |
1046054 | REMOVING CONCRETE(MOW STRIP) | LF | 2,375.000 | 9.00 | 1 2 3 | 7.130 11.000 14.000 |
1346003 | BACKFILL (TY C) | STA | 243.000 | 300.00 | 1 2 3 | 207.300 300.000 225.000 |
1646001 | BROADCAST SEED (PERM) (RURAL) (SANDY) | SY | 14,282.000 | 0.20 | 1 2 3 | 1.000 0.250 0.200 |
1686001 | VEGETATIVE WATERING | MG | 229.000 | 12.00 | 1 2 3 | 89.720 12.000 1.000 |
3446138001 | SUPERPAVE MIXTURES SP-D PG76-22 | TON | 7,442.000 | 120.00 | 1 2 3 | 102.200 115.000 115.000 |
3466045002 | STONE-MTRX-ASPH SMA-D PG76-22 | TON | 15,354.000 | 140.00 | 1 2 3 | 140.000 155.000 155.000 |
3516013 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | SY | 5,691.000 | 5.00 | 1 2 3 | 36.920 32.000 40.000 |
3546021 | PLANE ASPH CONC PAV(0" TO 2") | SY | 163,169.000 | 1.50 | 1 2 3 | 1.160 1.750 1.950 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 147.000 | 450.00 | 1 2 3 | 405.970 450.000 480.000 |
4386001 | CLEANING AND SEALING EXISTING JOINTS | LF | 528.000 | 20.00 | 1 2 3 | 35.700 45.000 47.500 |
4386005 | CLEANING AND SEALING JOINTS | LF | 528.000 | 20.00 | 1 2 3 | 16.800 25.000 43.500 |
4516019 | RETROFIT RAIL (TY T631) | LF | 300.000 | 100.00 | 1 2 3 | 96.600 85.000 105.000 |
5006001 | MOBILIZATION | LS | 1.000 | 438,230.95 | 1 2 3 | 117,000.000 200,000.000 450,000.000 |
5026001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 6.000 | 5,000.00 | 1 2 3 | 533.060 10,000.000 2,500.000 |
5066038002 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 250.000 | 5.00 | 1 2 3 | 3.150 5.000 4.000 |
5066039002 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 250.000 | 1.00 | 1 2 3 | 1.050 1.000 2.200 |
5306005 | DRIVEWAYS (ACP) | SY | 2,699.000 | 35.00 | 1 2 3 | 14.530 23.000 30.000 |
5336001 | RUMBLE STRIPS (SHOULDER) | LF | 42,842.000 | 0.20 | 1 2 3 | 0.320 0.400 0.160 |
5406001 | MTL W-BEAM GD FEN (TIM POST) | LF | 2,350.000 | 24.00 | 1 2 3 | 19.430 21.000 20.250 |
5406006 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 8.000 | 1,800.00 | 1 2 3 | 1,834.740 1,800.000 1,625.000 |
5406016 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 3.000 | 1,200.00 | 1 2 3 | 1,023.750 1,300.000 1,075.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 1,475.000 | 3.00 | 1 2 3 | 2.100 2.500 2.200 |
5426002 | REMOVE TERMINAL ANCHOR SECTION | EA | 3.000 | 300.00 | 1 2 3 | 315.000 200.000 330.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 5.000 | 2,800.00 | 1 2 3 | 2,808.750 2,700.000 2,950.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 5.000 | 350.00 | 1 2 3 | 341.250 250.000 360.000 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 6.000 | 52.00 | 1 2 3 | 778.690 800.000 815.000 |
6446004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T) | EA | 6.000 | 42.00 | 1 2 3 | 1,061.820 800.000 1,110.000 |
6446061 | IN SM RD SN SUP&AM TYTWT(1)WS(T) | EA | 6.000 | 42.00 | 1 2 3 | 633.900 800.000 665.000 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 4.000 | 68.00 | 1 2 3 | 251.950 200.000 265.000 |
6586014 | INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | EA | 10.000 | 40.00 | 1 2 3 | 25.200 30.000 26.400 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 15.000 | 40.00 | 1 2 3 | 30.450 30.000 32.000 |
6626001 | WK ZN PAV MRK NON-REMOV (W)4"(BRK) | LF | 5,355.000 | 0.35 | 1 2 3 | 0.260 0.270 0.280 |
6626004 | WK ZN PAV MRK NON-REMOV (W)4"(SLD) | LF | 42,841.000 | 0.35 | 1 2 3 | 0.260 0.270 0.280 |
6626034 | WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | LF | 42,841.000 | 0.35 | 1 2 3 | 0.260 0.270 0.280 |
6626060 | WK ZN PAV MRK REMOV (W)4"(BRK) | LF | 2,678.000 | 1.50 | 1 2 3 | 1.200 2.000 1.400 |
6626093 | WK ZN PAV MRK REMOV (Y)4"(BRK) | LF | 2,678.000 | 1.50 | 1 2 3 | 1.300 2.000 1.400 |
6666036007 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 1,366.000 | 1.00 | 1 2 3 | 1.060 1.100 1.100 |
6686076 | PREFAB PAV MRK TY C (W) (24") (SLD) | LF | 383.000 | 15.00 | 1 2 3 | 12.980 13.000 13.500 |
6686077 | PREFAB PAV MRK TY C (W) (ARROW) | EA | 21.000 | 200.00 | 1 2 3 | 193.350 200.000 200.000 |
6686085 | PREFAB PAV MRK TY C (W) (WORD) | EA | 17.000 | 250.00 | 1 2 3 | 236.790 250.000 245.000 |
6686092 | PREFAB PAV MRK TY C (W) (36")(YLD TRI) | EA | 40.000 | 60.00 | 1 2 3 | 47.150 50.000 48.000 |
6686108 | PREFAB PAV MRK TY C (Y) (24") (SLD) | LF | 1,190.000 | 11.00 | 1 2 3 | 12.980 14.000 13.500 |
6686110 | PREFAB PAV MRK TY C (Y) (MED NOSE) | EA | 1.000 | 500.00 | 1 2 3 | 211.890 250.000 220.000 |
6726007 | REFL PAV MRKR TY I-C | EA | 560.000 | 4.00 | 1 2 3 | 3.500 4.000 3.650 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 1,573.000 | 4.00 | 1 2 3 | 3.500 4.000 3.650 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 5,000.00 | 1 2 3 | 4,716.370 15,000.000 16,000.000 |
60566001 | PREFORMED IN-LANE(TRANS) RUMBLE STRIP | LF | 192.000 | 2.70 | 1 2 3 | 15.890 16.000 16.500 |
60566002 | PREFORMED CENTERLINE RUMBLE STRIP | LF | 42,842.000 | 5.50 | 1 2 3 | 3.550 3.700 3.700 |
61496016 | REFL PAV MRK AWT (W) (6")(SLD)(125 MIL) | LF | 43,380.000 | 0.70 | 1 2 3 | 0.660 0.680 0.680 |
61496017 | REFL PAV MRK AWT (W) (6")(BRK)(125 MIL) | LF | 10,721.000 | 0.70 | 1 2 3 | 0.690 0.700 0.720 |
61496022 | REFL PAV MRK AWT (Y) (6")(SLD)(125 MIL) | LF | 50,105.000 | 0.70 | 1 2 3 | 0.660 0.680 0.680 |
61496023 | REFL PAV MRK AWT (Y) (6")(BRK)(125 MIL) | LF | 9,788.000 | 0.70 | 1 2 3 | 0.690 0.700 0.700 |
61856001 | TMA (STATIONARY) | EA | 1.000 | 12,000.00 | 1 2 3 | 36,079.560 30,000.000 16,500.000 |
61856003 | TMA (MOBILE OPERATION) | HR | 100.000 | 12.00 | 1 2 3 | 776.240 30.000 27.500 |