Tabulation of Bids for Project STP 2021(597)TAPS
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | GRAYSON | Let Date: | 12/01/21 |
Type: | BICYCLE AND PEDESTRIAN IMPROVEMENTS | Seq No: | 3021 |
Time: | 93 WORKING DAYS | Project ID: | STP 2021(597)TAPS |
Highway: | SH 5 | Contract #: | 12213021 |
Length: | 0.427 | CCSJ: | 0047-03-096 |
Limits: | |||
From: | NEWPORT DR AT PARTIN ELEMENTARY SCH | Check: | $18,000 |
To: | 0.645 MI S OF FM 3133 AT MOORE PARK | Misc Cost: |
Estimate | $890,488.00 | % Over/Under | Company |
Bidder 1 | $662,920.28 | -25.56% | THE FAIN GROUP, INC. |
Bidder 2 | $743,748.32 | -16.48% | PROJECT ALLIED RESOURCES, LLC |
Bidder 3 | $748,075.00 | -15.99% | HIGHWAY 19 CONSTRUCTION LLC |
Bidder 4 | $862,977.77 | -3.09% | GHB EQUIPMENT COMPANY, L.L.C. |
Bidder 5 | $868,434.90 | -2.48% | O. TREVINO CONSTRUCTION, LLC |
Bidder 6 | $891,949.25 | +0.16% | SOUTH TEXAS ILLUMINATION, LLC |
Bidder 7 | $893,074.00 | +0.29% | FNH CONSTRUCTION, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006003 | PREPARING ROW(TREE)(5" TO 12" DIA) | EA | 20.000 | 455.00 | 1 2 3 4 5 6 7 | 493.810 378.000 1,000.000 350.000 1,000.000 672.750 2,000.000 |
1006004 | PREPARING ROW(TREE)(12" TO 24" DIA) | EA | 6.000 | 800.00 | 1 2 3 4 5 6 7 | 775.980 647.000 1,000.000 700.000 1,500.000 1,725.000 5,000.000 |
1006007 | PREP ROW (TREE)(GREATER THAN 24" DIA) | EA | 1.000 | 2,010.00 | 1 2 3 4 5 6 7 | 2,539.570 1,600.000 1,000.000 1,500.000 6,000.000 3,277.500 10,000.000 |
1006015 | PREPARING ROW (HAND CLEARING) | AC | 1.000 | 20,000.00 | 1 2 3 4 5 6 7 | 3,304.300 6,810.000 5,000.000 5,000.000 50,000.000 35,167.500 8,500.000 |
1046001 | REMOVING CONC (PAV) | SY | 104.000 | 15.00 | 1 2 3 4 5 6 7 | 23.910 70.000 25.000 200.000 50.000 13.700 20.000 |
1046021 | REMOVING CONC (CURB) | LF | 58.000 | 5.00 | 1 2 3 4 5 6 7 | 10.560 11.400 10.000 100.000 22.000 12.330 20.000 |
1046031 | REMOVING CONC (HEADWALL) | CY | 1.000 | 9,000.00 | 1 2 3 4 5 6 7 | 493.800 504.000 1,000.000 10,000.000 2,600.000 3,767.500 500.000 |
1106003 | EXCAVATION (SPECIAL) | CY | 437.000 | 8.00 | 1 2 3 4 5 6 7 | 33.520 37.500 25.000 100.000 30.000 17.130 50.000 |
1326003 | EMBANKMENT (FINAL)(ORD COMP)(TY B) | CY | 700.000 | 10.00 | 1 2 3 4 5 6 7 | 47.160 59.000 50.000 150.000 78.000 60.210 50.000 |
1626002 | BLOCK SODDING | SY | 2,845.000 | 10.00 | 1 2 3 4 5 6 7 | 9.170 10.700 5.000 10.000 3.500 8.630 6.000 |
1686001 | VEGETATIVE WATERING | MG | 50.000 | 500.00 | 1 2 3 4 5 6 7 | 630.310 166.000 50.000 200.000 165.000 57.500 35.000 |
4036001 | TEMPORARY SPL SHORING | SF | 280.000 | 20.00 | 1 2 3 4 5 6 7 | 28.220 16.100 35.000 40.000 95.000 97.750 85.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 20.000 | 500.00 | 1 2 3 4 5 6 7 | 680.710 842.000 550.000 550.000 750.000 741.400 650.000 |
4506051 | RAIL (HANDRAIL)(TY E) | LF | 112.000 | 300.00 | 1 2 3 4 5 6 7 | 223.410 364.000 300.000 190.000 215.000 187.430 300.000 |
4606001 | CMP (GAL STL 12 IN) | LF | 88.000 | 75.00 | 1 2 3 4 5 6 7 | 115.690 95.000 45.000 185.000 165.000 157.000 85.000 |
4606004 | CMP (GAL STL 30 IN) | LF | 11.000 | 150.00 | 1 2 3 4 5 6 7 | 214.350 200.000 75.000 250.000 320.000 437.900 200.000 |
4626046002 | CONC BOX CULV (3 FT X 3 FT)(EXTEND) | LF | 11.000 | 400.00 | 1 2 3 4 5 6 7 | 479.360 560.000 1,000.000 3,000.000 1,000.000 1,522.800 1,000.000 |
4676121 | SET (TY I)(S=3 FT)(HW= 6 FT)(3:1)(C) | EA | 1.000 | 7,500.00 | 1 2 3 4 5 6 7 | 11,287.020 17,000.000 16,000.000 15,000.000 23,000.000 9,676.000 15,000.000 |
4676319 | SET (TY II) (12 IN) (CMP) (6: 1) (P) | EA | 2.000 | 600.00 | 1 2 3 4 5 6 7 | 1,083.560 1,960.000 800.000 4,000.000 2,000.000 1,197.000 4,500.000 |
4676410 | SET (TY II) (30 IN) (CMP) (6: 1) (P) | EA | 1.000 | 2,200.00 | 1 2 3 4 5 6 7 | 3,628.780 6,670.000 3,500.000 9,000.000 4,000.000 3,517.000 8,500.000 |
4966004 | REMOV STR (SET) | EA | 1.000 | 400.00 | 1 2 3 4 5 6 7 | 507.920 2,410.000 500.000 10,000.000 2,000.000 822.000 1,500.000 |
5006001 | MOBILIZATION | LS | 1.000 | 50,000.00 | 1 2 3 4 5 6 7 | 5,643.520 81,000.000 200,000.000 90,390.770 86,500.000 80,020.000 85,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 6.000 | 15,000.00 | 1 2 3 4 5 6 7 | 3,291.580 4,020.000 10,000.000 10,000.000 10,000.000 1,725.000 8,500.000 |
5066020005 | CONSTRUCTION EXITS (INSTALL) (TY 1) | SY | 234.000 | 25.00 | 1 2 3 4 5 6 7 | 25.400 66.000 35.000 100.000 21.000 34.830 30.000 |
5066024005 | CONSTRUCTION EXITS (REMOVE) | SY | 234.000 | 10.00 | 1 2 3 4 5 6 7 | 13.050 33.200 5.000 20.000 11.000 17.300 15.000 |
5066034005 | CONSTRUCTION PERIMETER FENCE | LF | 108.000 | 5.00 | 1 2 3 4 5 6 7 | 11.290 7.600 10.000 40.000 12.000 13.700 25.000 |
5066038005 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 2,164.000 | 10.00 | 1 2 3 4 5 6 7 | 2.470 6.500 3.000 11.000 2.000 4.030 4.000 |
5066039005 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 2,164.000 | 3.00 | 1 2 3 4 5 6 7 | 0.780 4.130 1.000 2.000 0.600 1.150 2.000 |
5296008 | CONC CURB & GUTTER (TY II) | LF | 29.000 | 60.00 | 1 2 3 4 5 6 7 | 27.610 95.000 50.000 75.000 64.000 46.400 55.000 |
5306004 | DRIVEWAYS (CONC) | SY | 77.000 | 120.00 | 1 2 3 4 5 6 7 | 98.550 114.000 110.000 100.000 150.000 103.730 85.000 |
5316003 | CONC SIDEWALKS (6") | SY | 2,678.000 | 90.00 | 1 2 3 4 5 6 7 | 66.070 98.000 78.000 55.000 120.000 142.930 75.000 |
5316024 | CURB RAMPS (TY 7) | SY | 5.000 | 8,000.00 | 1 2 3 4 5 6 7 | 2,204.970 669.000 1,500.000 300.000 235.000 2,715.000 2,500.000 |
5406022001 | MTL THRIE-BEAM GD FEN (STEEL POST) | EA | 400.000 | 75.00 | 1 2 3 4 5 6 7 | 318.860 29.100 35.500 33.000 2.000 88.200 40.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 2.000 | 5,500.00 | 1 2 3 4 5 6 7 | 3,950.470 2,860.000 3,500.000 3,300.000 3,850.000 3,517.000 3,200.000 |
6446070 | RELOCATE SM RD SN SUP&AM TY S80 | EA | 14.000 | 800.00 | 1 2 3 4 5 6 7 | 952.340 579.000 350.000 1,000.000 1,100.000 708.150 850.000 |
6586047 | INSTL OM ASSM (OM-2Y)(WC)GND | EA | 2.000 | 70.00 | 1 2 3 4 5 6 7 | 63.490 90.000 70.000 80.000 62.000 78.600 100.000 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 6.000 | 40.00 | 1 2 3 4 5 6 7 | 35.270 22.600 70.000 30.000 35.000 78.600 100.000 |
7726001 | POST AND CABLE FENCE (REMOVAL) | LF | 18.000 | 20.00 | 1 2 3 4 5 6 7 | 141.090 10.200 50.000 55.000 13.000 34.250 100.000 |
7726005 | POST AND CABLE FENCE(REMV / REPL POSTS) | EA | 14.000 | 50.00 | 1 2 3 4 5 6 7 | 211.630 194.000 150.000 200.000 34.000 34.250 2,000.000 |
7726006 | POST AND CABLE FENCE(RMV/REPL CNC ANCH) | EA | 14.000 | 50.00 | 1 2 3 4 5 6 7 | 282.180 349.000 300.000 250.000 237.000 68.500 8,000.000 |
7726007 | POST AND CABLE FENCE (REMV/ REPL CABLE) | LF | 108.000 | 10.00 | 1 2 3 4 5 6 7 | 7.650 7.500 75.000 50.000 3.500 20.550 35.000 |
50336002 | REMOVABLE BOLLARD | EA | 10.000 | 16,500.00 | 1 2 3 4 5 6 7 | 2,557.910 1,620.000 10.000 3,000.000 2,000.000 2,185.360 250.000 |
61856002002 | TMA (STATIONARY) | DAY | 90.000 | 175.00 | 1 2 3 4 5 6 7 | 269.480 321.000 100.000 400.000 165.000 345.000 350.000 |
61856003002 | TMA (MOBILE OPERATION) | HR | 20.000 | 80.00 | 1 2 3 4 5 6 7 | 176.360 62.000 50.000 80.000 19.000 39.100 85.000 |