The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:GRAYSONLet Date:12/01/21
Type:BICYCLE AND PEDESTRIAN IMPROVEMENTSSeq No:3021
Time:93 WORKING DAYSProject ID:STP 2021(597)TAPS
Highway:SH 5Contract #:12213021
Length:0.427CCSJ:0047-03-096
Limits: 
From:NEWPORT DR AT PARTIN ELEMENTARY SCHCheck:$18,000
To:0.645 MI S OF FM 3133 AT MOORE PARKMisc Cost:
Estimate$890,488.00% Over/UnderCompany
Bidder 1$662,920.28-25.56%THE FAIN GROUP, INC.
Bidder 2$743,748.32-16.48%PROJECT ALLIED RESOURCES, LLC
Bidder 3$748,075.00-15.99%HIGHWAY 19 CONSTRUCTION LLC
Bidder 4$862,977.77-3.09%GHB EQUIPMENT COMPANY, L.L.C.
Bidder 5$868,434.90-2.48%O. TREVINO CONSTRUCTION, LLC
Bidder 6$891,949.25+0.16%SOUTH TEXAS ILLUMINATION, LLC
Bidder 7$893,074.00+0.29%FNH CONSTRUCTION, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006003PREPARING ROW(TREE)(5" TO 12" DIA)EA20.000455.001
2
3
4
5
6
7
493.810
378.000
1,000.000
350.000
1,000.000
672.750
2,000.000
1006004PREPARING ROW(TREE)(12" TO 24" DIA)EA6.000800.001
2
3
4
5
6
7
775.980
647.000
1,000.000
700.000
1,500.000
1,725.000
5,000.000
1006007PREP ROW (TREE)(GREATER THAN 24" DIA)EA1.0002,010.001
2
3
4
5
6
7
2,539.570
1,600.000
1,000.000
1,500.000
6,000.000
3,277.500
10,000.000
1006015PREPARING ROW (HAND CLEARING)AC1.00020,000.001
2
3
4
5
6
7
3,304.300
6,810.000
5,000.000
5,000.000
50,000.000
35,167.500
8,500.000
1046001REMOVING CONC (PAV)SY104.00015.001
2
3
4
5
6
7
23.910
70.000
25.000
200.000
50.000
13.700
20.000
1046021REMOVING CONC (CURB)LF58.0005.001
2
3
4
5
6
7
10.560
11.400
10.000
100.000
22.000
12.330
20.000
1046031REMOVING CONC (HEADWALL)CY1.0009,000.001
2
3
4
5
6
7
493.800
504.000
1,000.000
10,000.000
2,600.000
3,767.500
500.000
1106003EXCAVATION (SPECIAL)CY437.0008.001
2
3
4
5
6
7
33.520
37.500
25.000
100.000
30.000
17.130
50.000
1326003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY700.00010.001
2
3
4
5
6
7
47.160
59.000
50.000
150.000
78.000
60.210
50.000
1626002BLOCK SODDINGSY2,845.00010.001
2
3
4
5
6
7
9.170
10.700
5.000
10.000
3.500
8.630
6.000
1686001VEGETATIVE WATERINGMG50.000500.001
2
3
4
5
6
7
630.310
166.000
50.000
200.000
165.000
57.500
35.000
4036001TEMPORARY SPL SHORINGSF280.00020.001
2
3
4
5
6
7
28.220
16.100
35.000
40.000
95.000
97.750
85.000
4326045RIPRAP (MOW STRIP)(4 IN)CY20.000500.001
2
3
4
5
6
7
680.710
842.000
550.000
550.000
750.000
741.400
650.000
4506051RAIL (HANDRAIL)(TY E)LF112.000300.001
2
3
4
5
6
7
223.410
364.000
300.000
190.000
215.000
187.430
300.000
4606001CMP (GAL STL 12 IN)LF88.00075.001
2
3
4
5
6
7
115.690
95.000
45.000
185.000
165.000
157.000
85.000
4606004CMP (GAL STL 30 IN)LF11.000150.001
2
3
4
5
6
7
214.350
200.000
75.000
250.000
320.000
437.900
200.000
4626046002CONC BOX CULV (3 FT X 3 FT)(EXTEND)LF11.000400.001
2
3
4
5
6
7
479.360
560.000
1,000.000
3,000.000
1,000.000
1,522.800
1,000.000
4676121SET (TY I)(S=3 FT)(HW= 6 FT)(3:1)(C)EA1.0007,500.001
2
3
4
5
6
7
11,287.020
17,000.000
16,000.000
15,000.000
23,000.000
9,676.000
15,000.000
4676319SET (TY II) (12 IN) (CMP) (6: 1) (P)EA2.000600.001
2
3
4
5
6
7
1,083.560
1,960.000
800.000
4,000.000
2,000.000
1,197.000
4,500.000
4676410SET (TY II) (30 IN) (CMP) (6: 1) (P)EA1.0002,200.001
2
3
4
5
6
7
3,628.780
6,670.000
3,500.000
9,000.000
4,000.000
3,517.000
8,500.000
4966004REMOV STR (SET)EA1.000400.001
2
3
4
5
6
7
507.920
2,410.000
500.000
10,000.000
2,000.000
822.000
1,500.000
5006001MOBILIZATIONLS1.00050,000.001
2
3
4
5
6
7
5,643.520
81,000.000
200,000.000
90,390.770
86,500.000
80,020.000
85,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO6.00015,000.001
2
3
4
5
6
7
3,291.580
4,020.000
10,000.000
10,000.000
10,000.000
1,725.000
8,500.000
5066020005CONSTRUCTION EXITS (INSTALL) (TY 1)SY234.00025.001
2
3
4
5
6
7
25.400
66.000
35.000
100.000
21.000
34.830
30.000
5066024005CONSTRUCTION EXITS (REMOVE)SY234.00010.001
2
3
4
5
6
7
13.050
33.200
5.000
20.000
11.000
17.300
15.000
5066034005CONSTRUCTION PERIMETER FENCELF108.0005.001
2
3
4
5
6
7
11.290
7.600
10.000
40.000
12.000
13.700
25.000
5066038005TEMP SEDMT CONT FENCE (INSTALL)LF2,164.00010.001
2
3
4
5
6
7
2.470
6.500
3.000
11.000
2.000
4.030
4.000
5066039005TEMP SEDMT CONT FENCE (REMOVE)LF2,164.0003.001
2
3
4
5
6
7
0.780
4.130
1.000
2.000
0.600
1.150
2.000
5296008CONC CURB & GUTTER (TY II)LF29.00060.001
2
3
4
5
6
7
27.610
95.000
50.000
75.000
64.000
46.400
55.000
5306004DRIVEWAYS (CONC)SY77.000120.001
2
3
4
5
6
7
98.550
114.000
110.000
100.000
150.000
103.730
85.000
5316003CONC SIDEWALKS (6")SY2,678.00090.001
2
3
4
5
6
7
66.070
98.000
78.000
55.000
120.000
142.930
75.000
5316024CURB RAMPS (TY 7)SY5.0008,000.001
2
3
4
5
6
7
2,204.970
669.000
1,500.000
300.000
235.000
2,715.000
2,500.000
5406022001MTL THRIE-BEAM GD FEN (STEEL POST)EA400.00075.001
2
3
4
5
6
7
318.860
29.100
35.500
33.000
2.000
88.200
40.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA2.0005,500.001
2
3
4
5
6
7
3,950.470
2,860.000
3,500.000
3,300.000
3,850.000
3,517.000
3,200.000
6446070RELOCATE SM RD SN SUP&AM TY S80EA14.000800.001
2
3
4
5
6
7
952.340
579.000
350.000
1,000.000
1,100.000
708.150
850.000
6586047INSTL OM ASSM (OM-2Y)(WC)GNDEA2.00070.001
2
3
4
5
6
7
63.490
90.000
70.000
80.000
62.000
78.600
100.000
6586062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA6.00040.001
2
3
4
5
6
7
35.270
22.600
70.000
30.000
35.000
78.600
100.000
7726001POST AND CABLE FENCE (REMOVAL)LF18.00020.001
2
3
4
5
6
7
141.090
10.200
50.000
55.000
13.000
34.250
100.000
7726005POST AND CABLE FENCE(REMV / REPL POSTS)EA14.00050.001
2
3
4
5
6
7
211.630
194.000
150.000
200.000
34.000
34.250
2,000.000
7726006POST AND CABLE FENCE(RMV/REPL CNC ANCH)EA14.00050.001
2
3
4
5
6
7
282.180
349.000
300.000
250.000
237.000
68.500
8,000.000
7726007POST AND CABLE FENCE (REMV/ REPL CABLE)LF108.00010.001
2
3
4
5
6
7
7.650
7.500
75.000
50.000
3.500
20.550
35.000
50336002REMOVABLE BOLLARDEA10.00016,500.001
2
3
4
5
6
7
2,557.910
1,620.000
10.000
3,000.000
2,000.000
2,185.360
250.000
61856002002TMA (STATIONARY)DAY90.000175.001
2
3
4
5
6
7
269.480
321.000
100.000
400.000
165.000
345.000
350.000
61856003002TMA (MOBILE OPERATION)HR20.00080.001
2
3
4
5
6
7
176.360
62.000
50.000
80.000
19.000
39.100