Tabulation of Bids for Project STP 2020(329)HES

Last Update: Tuesday, February 25, 2020

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:VAN ZANDTLet Date:12/03/19
Type:GUARD RAIL, DRAINAGE STRUCTURES, BRIDGE RAILSeq No:3018
Time:338 WORKING DAYSProject ID:STP 2020(329)HES
Highway:FM 47Contract #:12193018
Length:11.367CCSJ:0646-02-029
Limits: 
From:US 80 IN WILLS POINT, SCheck:$100,000
To:SH 243, ETC.Misc Cost:$7,000.00
Estimate$5,095,340.20% Over/UnderCompany
Bidder 1$4,537,223.82-10.95%HIGHWAY 19 CONSTRUCTION LLC
Bidder 2$5,088,466.66-0.13%BAKER & COMPANY CONSTRUCTION, LLC
Bidder 3$5,195,328.90+1.96%EAST TEXAS BRIDGE, INC.
Bidder 4$5,248,423.51+3.00%LONGVIEW BRIDGE AND ROAD, LTD.
Bidder 5$6,563,701.75+28.82%ENCINO LANDSCAPE, INC.
Bidder 6$7,679,365.50+50.71%FNH CONSTRUCTION, LLC
Bidder 7$8,336,349.56+63.61%ALTUS CONSTRUCTION LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA17.4002,400.001
2
3
4
5
6
7
1,500.000
3,200.000
2,500.000
1,500.000
5,000.000
30,000.000
13,356.680
1326021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY2,423.00022.001
2
3
4
5
6
7
30.000
26.000
25.000
18.000
30.000
35.000
25.310
1506001BLADINGSTA412.680200.001
2
3
4
5
6
7
300.000
122.000
375.000
385.000
300.000
250.000
267.130
1606003FURNISHING AND PLACING TOPSOIL (4")SY90,993.0001.351
2
3
4
5
6
7
2.000
1.000
2.500
2.500
1.750
5.000
1.320
1626002BLOCK SODDINGSY1,207.0004.101
2
3
4
5
6
7
5.000
5.000
5.500
5.000
9.000
6.000
3.860
1646054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY90,993.0000.851
2
3
4
5
6
7
0.720
0.700
0.800
0.800
1.000
1.000
1.020
1646055BONDED FBR MTRX SEED (TEMP)(WARM)SY45,563.0000.711
2
3
4
5
6
7
0.620
0.700
0.600
0.750
0.750
1.000
0.870
1646056BONDED FBR MTRX SEED (TEMP)(COOL)SY45,563.0000.711
2
3
4
5
6
7
0.630
0.700
0.600
0.750
0.750
1.000
0.870
1686001VEGETATIVE WATERINGMG2,003.50010.001
2
3
4
5
6
7
10.000
11.000
10.000
2.000
9.000
35.000
23.610
4006005CEM STABIL BKFLCY4.000189.001
2
3
4
5
6
7
500.000
175.000
400.000
450.000
400.000
350.000
97.410
4006008CUT & RESTORE ASPH PAVINGSY12.00070.001
2
3
4
5
6
7
250.000
82.000
150.000
200.000
120.000
200.000
163.340
4016001FLOWABLE BACKFILLCY70.000185.001
2
3
4
5
6
7
180.000
225.000
275.000
350.000
240.000
350.000
203.800
4036001TEMPORARY SPL SHORINGSF3,216.00027.361
2
3
4
5
6
7
55.000
48.000
60.000
35.000
35.000
65.000
34.810
4206071CL C CONC (COLLAR)EA35.0001,200.001
2
3
4
5
6
7
1,000.000
1,120.000
1,000.000
1,050.000
1,500.000
1,500.000
1,710.060
4326001RIPRAP (CONC)(4 IN)CY67.000450.001
2
3
4
5
6
7
500.000
510.000
550.000
535.000
500.000
650.000
537.010
4326026RIPRAP (STONE COMMON)(DRY)(18 IN)CY112.000161.501
2
3
4
5
6
7
150.000
210.000
150.000
200.000
300.000
285.000
174.630
4326045RIPRAP (MOW STRIP)(4 IN)CY500.000495.001
2
3
4
5
6
7
400.000
490.000
445.000
500.000
500.000
400.000
567.710
4516019RETROFIT RAIL (TY T631)LF490.000104.001
2
3
4
5
6
7
90.000
67.000
100.000
125.000
200.000
185.000
187.660
4626007002CONC BOX CULV (5 FT X 3 FT)LF156.000450.001
2
3
4
5
6
7
350.000
480.000
420.000
360.000
500.000
550.000
422.410
4626049002CONC BOX CULV (4 FT X 4 FT)(EXTEND)LF16.000625.001
2
3
4
5
6
7
500.000
690.000
700.000
640.000
500.000
1,000.000
1,273.510
4626051002CONC BOX CULV (5 FT X 3 FT)(EXTEND)LF12.000600.001
2
3
4
5
6
7
450.000
845.000
700.000
800.000
500.000
1,000.000
749.310
4626052002CONC BOX CULV (5 FT X 4 FT)(EXTEND)LF84.000550.001
2
3
4
5
6
7
500.000
690.000
700.000
510.000
500.000
1,000.000
1,429.000
4626055002CONC BOX CULV (6 FT X 4 FT)(EXTEND)LF18.000850.001
2
3
4
5
6
7
600.000
855.000
800.000
740.000
500.000
1,000.000
1,025.110
4626056002CONC BOX CULV (6 FT X 5 FT)(EXTEND)LF16.000620.001
2
3
4
5
6
7
650.000
940.000
800.000
800.000
600.000
1,000.000
1,710.290
4626057002CONC BOX CULV (6 FT X 6 FT)(EXTEND)LF82.000900.001
2
3
4
5
6
7
700.000
836.000
800.000
710.000
600.000
1,000.000
1,733.690
4626093002CONC BOX CULV (5 FT X 6 FT) (EXTEND)LF20.000750.001
2
3
4
5
6
7
600.000
875.000
800.000
800.000
600.000
1,000.000
1,357.670
4626147002CONC BOX CULV (4 FT X 2.5 FT) (EXTEND)LF18.000900.001
2
3
4
5
6
7
500.000
660.000
600.000
550.000
600.000
1,000.000
1,444.520
4646003001RC PIPE (CL III)(18 IN)LF7,541.00056.001
2
3
4
5
6
7
35.000
50.000
40.000
35.000
75.000
70.000
74.970
4646005001RC PIPE (CL III)(24 IN)LF972.00058.001
2
3
4
5
6
7
47.000
70.000
58.000
48.000
110.000
95.000
105.370
4646008001RC PIPE (CL III)(36 IN)LF86.000112.001
2
3
4
5
6
7
106.000
105.000
115.000
95.000
200.000
125.000
153.530
4656126001INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)EA3.0004,400.001
2
3
4
5
6
7
3,500.000
4,260.000
5,000.000
6,500.000
7,500.000
6,500.000
4,097.330
4666095HEADWALL (CH - PW - 0) (DIA= 18 IN)EA3.0003,885.001
2
3
4
5
6
7
2,000.000
5,330.000
4,000.000
4,500.000
6,000.000
3,000.000
8,636.520
4666097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA10.0004,800.001
2
3
4
5
6
7
3,500.000
6,700.000
4,500.000
6,000.000
7,500.000
4,000.000
9,722.010
4666101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA6.0007,500.001
2
3
4
5
6
7
5,500.000
9,900.000
5,500.000
7,700.000
9,000.000
5,000.000
15,086.370
4666151WINGWALL (FW - 0) (HW=4 FT)EA1.0006,850.001
2
3
4
5
6
7
6,000.000
9,500.000
9,000.000
8,000.000
16,000.000
6,500.000
13,522.560
4666182WINGWALL (PW - 1) (HW=7 FT)EA2.00015,000.001
2
3
4
5
6
7
9,000.000
25,000.000
18,000.000
23,000.000
22,500.000
9,500.000
42,159.310
4666183WINGWALL (PW - 1) (HW=8 FT)EA2.00025,000.001
2
3
4
5
6
7
12,500.000
22,600.000
21,000.000
25,000.000
25,000.000
12,500.000
51,606.140
4666193WINGWALL (PW - 2) (HW=4 FT)EA5.0009,300.001
2
3
4
5
6
7
6,000.000
11,250.000
9,000.000
10,000.000
16,000.000
11,000.000
15,945.470
4666194WINGWALL (PW - 2) (HW=5 FT)EA8.00012,000.001
2
3
4
5
6
7
8,000.000
17,700.000
17,000.000
13,000.000
18,000.000
15,000.000
20,592.920
4666195WINGWALL (PW - 2) (HW=6 FT)EA4.00011,471.001
2
3
4
5
6
7
9,000.000
27,200.000
27,000.000
17,000.000
20,000.000
17,000.000
29,500.060
4666196WINGWALL (PW - 2) (HW=7 FT)EA1.00015,235.001
2
3
4
5
6
7
10,000.000
32,200.000
22,000.000
25,000.000
22,500.000
18,000.000
31,630.290
4666197WINGWALL (PW - 2) (HW=8 FT)EA2.00022,571.851
2
3
4
5
6
7
12,000.000
29,000.000
25,000.000
30,000.000
25,000.000
25,000.000
38,971.040
4676363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA754.000700.001
2
3
4
5
6
7
538.000
710.000
595.000
500.000
1,200.000
850.000
1,561.070
4676388SET (TY II) (24 IN) (RCP) (3: 1) (C)EA3.000980.001
2
3
4
5
6
7
550.000
970.000
650.000
550.000
2,500.000
2,000.000
2,356.940
4676390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA5.000910.001
2
3
4
5
6
7
675.000
1,050.000
750.000
750.000
2,500.000
2,000.000
2,455.470
4676395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA98.0001,070.001
2
3
4
5
6
7
875.000
970.000
950.000
750.000
2,250.000
2,000.000
2,670.510
4676448SET (TY II) (36 IN) (RCP) (3: 1) (C)EA2.0002,000.001
2
3
4
5
6
7
1,936.000
2,300.000
2,500.000
1,450.000
4,000.000
3,500.000
4,615.630
4676450SET (TY II) (36 IN) (RCP) (4: 1) (C)EA1.0001,900.001
2
3
4
5
6
7
2,170.000
3,300.000
3,000.000
1,900.000
4,500.000
3,500.000
5,715.250
4966016REMOV STR (PIPE)EA289.000400.001
2
3
4
5
6
7
250.000
195.000
275.000
100.000
400.000
500.000
438.710
5006001MOBILIZATIONLS1.000450,000.001
2
3
4
5
6
7
350,000.000
335,500.000
350,000.000
500,000.000
500,000.000
750,000.000
801,400.790
5026001007BARRICADES, SIGNS AND TRAFFIC HANDLINGMO19.0008,000.001
2
3
4
5
6
7
5,000.000
3,150.000
7,500.000
3,000.000
9,500.000
8,500.000
26,713.360
5066002004ROCK FILTER DAMS (INSTALL) (TY 2)LF4,875.00031.401
2
3
4
5
6
7
28.000
28.000
26.000
48.000
30.000
30.000
38.710
5066011004ROCK FILTER DAMS (REMOVE)LF4,875.00013.001
2
3
4
5
6
7
5.000
7.500
5.000
14.500
10.000
15.000
11.670
5066029004EARTHWORK (EROSN & SEDMT CONT, IN VEH)CY514.00019.901
2
3
4
5
6
7
15.000
40.000
40.000
25.000
20.000
35.000
15.510
5066030004BACKHOE WORK (EROSION & SEDMT CONT)HR205.00096.001
2
3
4
5
6
7
20.000
57.000
100.000
250.000
100.000
150.000
86.780
5066038004TEMP SEDMT CONT FENCE (INSTALL)LF10,252.0002.701
2
3
4
5
6
7
2.500
3.000
3.200
1.800
3.000
4.000
3.050
5066039004TEMP SEDMT CONT FENCE (REMOVE)LF10,252.0000.911
2
3
4
5
6
7
0.630
0.450
0.500
0.480
1.000
2.000
0.850
5066042004BIODEG EROSN CONT LOGS (INSTL) (18")LF4,220.0006.001
2
3
4
5
6
7
4.000
5.250
5.500
4.750
5.000
18.000
7.610
5066043004BIODEG EROSN CONT LOGS (REMOVE)LF4,220.0001.131
2
3
4
5
6
7
0.630
1.000
1.000
0.700
1.000
12.000
1.440
5066046004TRACKHOE WORK (EROSION & SEDMT CONT)HR123.000123.001
2
3
4
5
6
7
20.000
126.000
100.000
120.000
100.000
150.000
144.690
5106004ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)DAY22.000515.001
2
3
4
5
6
7
1,000.000
430.000
800.000
650.000
1,000.000
375.000
647.050
5126001PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)LF1,350.00032.001
2
3
4
5
6
7
85.000
106.000
75.000
85.000
70.000
90.000
56.550
5126025PORT CTB (MOVE)(SGL SLP)(TY 1)LF4,980.0006.001
2
3
4
5
6
7
15.000
1.000
14.000
14.000
8.000
20.000
7.440
5126037PORT CTB (STKPL)(SGL SLP)(TY 1)LF1,350.0006.001
2
3
4
5
6
7
25.000
4.000
8.000
14.000
8.000
20.000
8.450
5306002INTERSECTIONS (ACP)SY2,291.00041.331
2
3
4
5
6
7
55.000
50.000
42.000
48.000
40.000
42.000
40.200
5306005DRIVEWAYS (ACP)SY15,114.00030.601
2
3
4
5
6
7
35.000
38.000
35.000
40.000
40.000
42.000
45.640
5306017DRIVEWAYS (CONC) (HES)SY502.00099.691
2
3
4
5
6
7
100.000
130.000
90.000
125.000
100.000
150.000
114.080
5406001001MTL W-BEAM GD FEN (TIM POST)LF5,025.00021.581
2
3
4
5
6
7
18.500
19.000
20.000
18.250
25.000
22.000
28.120
5406002001MTL W-BEAM GD FEN (STEEL POST)LF100.00084.001
2
3
4
5
6
7
21.250
38.000
25.000
30.000
35.000
35.000
35.340
5406021001MTL THRIE-BEAM GD FEN (TIM POST)EA30.0001,900.001
2
3
4
5
6
7
1,300.000
1,400.000
1,500.000
1,650.000
2,000.000
1,850.000
2,237.980
5406022001MTL THRIE-BEAM GD FEN (STEEL POST)EA2.0001,975.001
2
3
4
5
6
7
1,500.000
1,900.000
1,700.000
1,900.000
2,500.000
2,000.000
2,967.850
5426001REMOVE METAL BEAM GUARD FENCELF4,725.0003.191
2
3
4
5
6
7
2.250
4.000
2.500
2.200
4.000
3.000
3.460
5426002REMOVE TERMINAL ANCHOR SECTIONEA38.000280.001
2
3
4
5
6
7
150.000
131.000
200.000
330.000
250.000
500.000
308.870
5446001GUARDRAIL END TREATMENT (INSTALL)EA46.0002,675.001
2
3
4
5
6
7
2,450.000
2,600.000
2,800.000
2,750.000
3,000.000
2,850.000
3,624.320
5446003GUARDRAIL END TREATMENT (REMOVE)EA4.000300.001
2
3
4
5
6
7
200.000
260.000
300.000
400.000
500.000
1,500.000
387.540
5456003CRASH CUSH ATTEN (MOVE & RESET)EA20.0002,195.001
2
3
4
5
6
7
2,000.000
1,500.000
2,200.000
2,750.000
2,500.000
5,000.000
1,913.080
5456005CRASH CUSH ATTEN (REMOVE)EA6.0001,000.001
2
3
4
5
6
7
800.000
700.000
1,000.000
1,000.000
1,000.000
2,500.000
1,206.260
5456019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA6.0007,800.001
2
3
4
5
6
7
8,500.000
8,000.000
10,000.000
11,000.000
10,000.000
12,500.000
11,862.760
6586013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA48.00021.001
2
3
4
5
6
7
15.000
25.000
20.000
26.000
30.000
100.000
26.390
6586048INSTL OM ASSM (OM-2Z)(FLX)GNDEA55.00076.001
2
3
4
5
6
7
45.000
53.000
50.000
50.000
120.000
100.000
122.450
6586061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA120.00031.751
2
3
4
5
6
7
20.000
35.000
25.000
38.000
40.000
100.000
34.270
6626075WK ZN PAV MRK REMOV (W)24"(SLD)LF48.0008.001
2
3
4
5
6
7
30.000
26.000
50.000
15.000
10.000
20.000
5.100
60016002PORTABLE CHANGEABLE MESSAGE SIGNEA4.00017,000.001
2
3
4
5
6
7
5,000.000
1,800.000
15,000.000
16,000.000
12,500.000
16,500.000
11,270.890
61856002002TMA (STATIONARY)DAY191.000195.001
2
3
4
5
6
7
250.000
245.000
250.000
130.000
250.000
400.000
467.480