1MIS.CIS.01 CONTRACT TIME STATEMENT CONTRACT 3124021 MGR.NO. 054 PAGE 001 CONT 6230 SEC 92 JOB 001 RES ENGR GUPTA, RAM PROJ RMC - 623092001 HWY BF1187C 2501 SW LOOP 820 FORT WOR CNTY TARRANT DIST 02 CONTRACT PRICE $ 984,699.20 REPORT DATE 02/21/2013 17.10.39 CONTRACTOR PEACHTREE CONSTRUCTION, LTD. 9654 EST PERIOD JUN 11,2012 TO DEC 12,2012 EST NO 004 & FINAL --------------------------------------------------------------------------------------------------------- DATE WORK BEGAN JUN 11, 2012 TIME COMPUTED FROM JUN 11, 2012 SUMMARY INFORMATION 0 DATE WORKING REASONS FOR DAYS CREDITED MONTH/YEAR OR DAYS DAYS /COMMENTS FOR DAYS CHARGED PHASE I DAYS CHARGED CREDITED CONTRACT WORK DAYS = 34 51 38 13 BROUGHT FORWARD ADDL DAYS GRANTED = 9 DEC 12 1 1 TIME SUSPENDED TIME NEGOTIATIONS TOTAL DAYS ALLOWED = 43 2 1 TIME SUSPENDED TIME NEGOTIATIONS DATE WORK COMPLETED 12/12/12 3 1 TIME SUSPENDED TIME NEGOTIATIONS DAYS CHARGED TO DATE = 50 4 1 TIME SUSPENDED TIME NEGOTIATIONS ASSESSED LIQ DAMAGES = 7 5 1 TIME SUSPENDED TIME NEGOTIATIONS LIQ DAMAGE RATE $ 610 6 1 TIME SUSPENDED TIME NEGOTIATIONS 7 1 TIME SUSPENDED TIME NEGOTIATIONS LIQUIDATED DAMAGES 8 1 TIME SUSPENDED TIME NEGOTIATIONS 7 DAYS AT $ 610 PER DAY 9 1 TIME SUSPENDED TIME NEGOTIATIONS TOTAL = $ 4,270.00 10 1 TIME SUSPENDED TIME NEGOTIATIONS 11 1 TIME SUSPENDED TIME NEGOTIATIONS CERTIFIED AS CORRECT AND 12 1 WORK COMPLETED AND ACCEPTED ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR - ---------------------------- AREA/PROJECT ENGINEER - - - - - ----- ----- ----- 63 38 25 0 SATURDAY 0 SUNDAY 0 HOLIDAY 11 TIME SUSPENDED TIME NEGOTIATIONS 1 WORK COMPLETED AND ACCEPTED 1MIS.CIS.03 CONSTRUCTN ESTIMATE BREAKDOWN CONTRACT 3124021 MGR.NO. 054 PAGE 001 CONT 6230 SEC 92 JOB 001 RES ENGR GUPTA, RAM PROJ RMC - 623092001 HWY BF1187C 2501 SW LOOP 820 FORT WOR CNTY TARRANT DIST 02 CONTRACT PRICE $ 984,699.20 REPORT DATE 02/21/2013 17.10.40 CONTRACTOR PEACHTREE CONSTRUCTION, LTD. 9654 EST PERIOD JUN 11,2012 TO DEC 12,2012 EST NO 004 & FINAL DIST. 02 COUNTY TARRANT CONTROL 6230-92-001 PROJECT RMC - 623092001 HIGHWAY BF1187C 0LIMITS- BF 1187C FROM CONCRETE PAVEMENT TO FM 1187 BYPASS IN SOUTH TARRANT COUNTY 0TYPE OF WORK- HMAC OVERLAY 0 0050 PLANING AND OVERLAY IN TARRANT CO NET LENGTH 2.229 MILES 0 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES ON CONTRACT PRICE($) ($) - 0070 PLANING AND OVERLAY ON BF 1187C IN TARRANT CO 0075 PREPARED BY: RAM GUPTA 0 0080 0132 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 7.000 60.000 150.000 9,000.00 0085 0134 BACKFILL (TY B) STA 2.000 0.000 850.000 .00 0090 0340 D-GR HMA(METH) TY-B PG64-22 TON 33.000 48.870 310.000 15,149.70 0095 0340 D-GR HMA(METH) TY-D SAC-B PG70-22 TON 5,656.000 6,244.560 74.500 465,219.72 0100 0340 D-GR HMA(METH) TY-D PG70-22 TON 1,414.000 0.000 78.000 .00 0105 0351 FLEX PAVEMENT STRUCTURE REPAIR (5"-10") SY 4.000 400.000 125.000 50,000.00 0110 0354 PLANE ASPH CONC PAV(0" TO 2") SY 48,222.000 51,114.890 2.100 107,341.27 0115 0356 ASPH BINDER(PG 64-22) GAL 14,467.000 6,700.000 3.500 23,450.00 0120 0356 FABRIC SY 48,222.000 51,114.890 1.000 51,114.89 0125 0400 STRUCT EXCAV (PIPE) CY 62.000 62.000 35.000 2,170.00 0130 0400 CEM STABIL BKFL CY 22.000 23.000 200.000 4,600.00 0135 0464 RC PIPE (CL III)(24 IN) LF 208.000 208.000 72.000 14,976.00 0140 0464 RC PIPE (CL III)(30 IN) LF 16.000 16.000 135.000 2,160.00 0145 0465 MANH (COMPL)(JUNCT BOX)(TY M) EA 1.000 1.000 5,500.000 5,500.00 0150 0467 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 8.000 10.000 875.000 8,750.00 0155 0467 SET (TY II)(30 IN)(RCP)(4:1)(C) EA 6.000 6.000 2,250.000 13,500.00 0160 0467 SET (TY II)(24 IN)(CMP)(6:1)(P) EA 1.000 1.000 1,500.000 1,500.00 0165 0500 MOBILIZATION LS 1.000 1.000 90,000.000 90,000.00 0170 0502 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 3.000 3,500.000 10,500.00 1 0175 0506 TEMPORARY SEDIMENT CONTROL FENCE LF 500.000 0.000 2.000 .00 0180 0529 CONCRETE CURB (SPECIAL) LF 20.000 20.000 130.000 2,600.00 0185 0560 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 2.000 2.000 600.000 1,200.00 0190 0560 MAILBOX INSTALL-S(TWW-POST)TY 4 FND- EA 2.000 5.000 280.000 1,400.00 0195 0636 REPLACE EXISTING ALUMINUM SIGNS (TY A) SF 12.000 152.500 27.000 4,117.50 0200 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 20.000 585.000 11,700.00 0205 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 2.000 700.000 1,400.00 0210 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 3.000 0.000 675.000 .00 0215 0644 RELOCATE SM RD SN SUP & AM TY 10BWG EA 5.000 0.000 325.000 .00 0220 0644 REMOVE SM RD SN SUP & AM EA 9.000 33.000 110.000 3,630.00 0225 0658 INSTL OM ASSM (OM-2Z)(FLX)SRF EA 3.000 13.000 110.000 1,430.00 0230 0658 REMOVE DELIN & OBJECT MARKERS ASSMS EA 2.000 2.000 33.000 66.00 0235 0662 WK ZN PAV MRK SHT TERM (TAB) TY W EA 589.000 768.000 1.000 768.00 0240 0666 REFL PAV MRK TY I (W) 4" (BRK)(100MIL) LF 750.000 0.000 .360 .00 0245 0666 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 23,540.000 21,055.000 .360 7,579.80 0250 0666 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 1,492.000 1,356.000 1.100 1,491.60 0255 0666 REFL PAV MRK TY I (W) 12"(SLD)(090MIL) LF 120.000 290.000 3.300 957.00 0260 0666 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 336.000 400.000 5.500 2,200.00 0265 0666 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 17.000 18.000 140.000 2,520.00 0270 0666 REFL PAV MRK TY I(W)(RR XING) (100MIL) EA 2.000 2.000 500.000 1,000.00 0275 0666 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 10.000 13.000 210.000 2,730.00 0280 0666 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 750.000 730.000 .360 262.80 0285 0666 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 23,540.000 26,979.000 .360 9,712.44 0290 0666 REF PAV MRK TY II (W) 4" (BRK) LF 750.000 0.000 .270 .00 0295 0666 REF PAV MRK TY II (W) 4" (SLD) LF 23,540.000 21,055.000 .270 5,684.85 0300 0666 REF PAV MRK TY II (W) 8" (SLD) LF 1,492.000 1,356.000 .550 745.80 0305 0666 REF PAV MRK TY II (W) 12" 1 (SLD) LF 212.000 0.000 2.200 .00 0310 0666 REF PAV MRK TY II (W) 24" (SLD) LF 336.000 0.000 3.250 .00 0315 0666 REF PAV MRK TY II (W) (ARROW) EA 17.000 0.000 70.000 .00 0320 0666 REF PAV MRK TY II (W) (RR XING) EA 2.000 0.000 220.000 .00 0325 0666 REF PAV MRK TY II (W) (WORD) EA 10.000 0.000 110.000 .00 0330 0666 REF PAV MRK TY II (Y) 4" (BRK) LF 750.000 730.000 .280 204.40 0335 0666 REF PAV MRK TY II (Y) 4" (SLD) LF 23,540.000 27,050.000 .280 7,574.00 0340 0672 REFL PAV MRKR TY II-A-A EA 80.000 528.000 4.500 2,376.00 0345 0672 REFL PAV MRKR TY II-C-R EA 80.000 70.000 4.500 315.00 0350 0680 INSTALL HWY TRF SIG (SYSTEM) EA 1.000 1.000 325.000 325.00 0355 0690 REMOVAL OF CABLES LF 2,000.000 1,771.000 .500 885.50 0360 0760 DITCH CLEANING AND RESHAPING (FOOT) LF 400.000 850.000 25.000 21,250.00 0365 5049 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 200.000 200.000 4.000 800.00 0370 6266 VIVDS PROCESSOR SYSTEM EA 1.000 1.000 7,200.000 7,200.00 0375 6266 VIVDS CAMERA ASSEMBLY EA 4.000 4.000 1,500.000 6,000.00 0380 6266 VIVDS SET-UP SYSTEM EA 1.000 1.000 700.000 700.00 0385 6266 VIVDS COMMUNICATION CABLE (COAXIAL) LF 800.000 715.000 2.100 1,501.50 0390 6834 PORTABLE CHANGEABLE MESSAGE SIGN DAY 30.000 48.000 120.000 5,760.00 0 SUBTOTAL BID ITEMS $ 993,018.77 0 TOTAL AMOUNT WORK DONE PLANING AND OVERLAY IN TARRANT CO $ 993,018.77 0 TOTAL AMOUNT WORK DONE CONTROL 6230-92-001 $ 993,018.77 1MIS.CIS.04 CONSTRUCTION ESTIMATE COMBINED CONTRACT 3124021 MGR.NO. 054 PAGE 001 CONT 6230 SEC 92 JOB 001 RES ENGR GUPTA, RAM PROJ RMC - 623092001 HWY BF1187C 2501 SW LOOP 820 FORT WOR CNTY TARRANT DIST 02 CONTRACT PRICE $ 984,699.20 REPORT DATE 02/21/2013 17.10.40 CONTRACTOR PEACHTREE CONSTRUCTION, LTD. 9654 EST PERIOD JUN 11,2012 TO DEC 12,2012 EST NO 004 & FINAL 0*********************************************************************************************************************************** -LIMITS - BF 1187C FROM CONCRETE PAVEMENT TO 0 FM 1187 BYPASS IN SOUTH TARRANT COUNTY DATE WORK BEGAN JUN 11, 2012 WORKING DAYS USED 50 PERCENT COMPLETE 100.00 PERCENT TIME USED 116.20 DATE COMPLETED DEC 12 2012 0 CONTROL PROJECT DISTRICT HIGHWAY COUNTY 0 6230-92-001 RMC - 623092001 02 BF1187C TARRANT - ITEM DESCRIPTION UNIT ESTIMATED WORK DONE CONTRACT AMOUNT NO. QUANTITIES ON CONTRACT PRICE($) ($) -0132 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 7.000 60.000 150.000 9,000.00 0340 D-GR HMA(METH) TY-B PG64-22 TON 33.000 48.870 310.000 15,149.70 0340 D-GR HMA(METH) TY-D SAC-B PG70-22 TON 5,656.000 6,244.560 74.500 465,219.72 0351 FLEX PAVEMENT STRUCTURE REPAIR (5"-10") SY 4.000 400.000 125.000 50,000.00 0354 PLANE ASPH CONC PAV(0" TO 2") SY 48,222.000 51,114.890 2.100 107,341.27 0356 ASPH BINDER(PG 64-22) GAL 14,467.000 6,700.000 3.500 23,450.00 0356 FABRIC SY 48,222.000 51,114.890 1.000 51,114.89 0400 STRUCT EXCAV (PIPE) CY 62.000 62.000 35.000 2,170.00 0400 CEM STABIL BKFL CY 22.000 23.000 200.000 4,600.00 0464 RC PIPE (CL III)(24 IN) LF 208.000 208.000 72.000 14,976.00 0464 RC PIPE (CL III)(30 IN) LF 16.000 16.000 135.000 2,160.00 0465 MANH (COMPL)(JUNCT BOX)(TY M) EA 1.000 1.000 5,500.000 5,500.00 0467 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 8.000 10.000 875.000 8,750.00 0467 SET (TY II)(30 IN)(RCP)(4:1)(C) EA 6.000 6.000 2,250.000 13,500.00 0467 SET (TY II)(24 IN)(CMP)(6:1)(P) EA 1.000 1.000 1,500.000 1,500.00 0500 MOBILIZATION LS 1.000 1.000 90,000.000 90,000.00 0502 BARRICADES, SIGNS AND 1 TRAFFIC HANDLING MO 2.000 3.000 3,500.000 10,500.00 0529 CONCRETE CURB (SPECIAL) LF 20.000 20.000 130.000 2,600.00 0560 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 2.000 2.000 600.000 1,200.00 0560 MAILBOX INSTALL-S(TWW-POST)TY 4 FND- EA 2.000 5.000 280.000 1,400.00 0636 REPLACE EXISTING ALUMINUM SIGNS (TY A) SF 12.000 152.500 27.000 4,117.50 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 20.000 585.000 11,700.00 0644 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 2.000 700.000 1,400.00 0644 REMOVE SM RD SN SUP & AM EA 9.000 33.000 110.000 3,630.00 0658 INSTL OM ASSM (OM-2Z)(FLX)SRF EA 3.000 13.000 110.000 1,430.00 0658 REMOVE DELIN & OBJECT MARKERS ASSMS EA 2.000 2.000 33.000 66.00 0662 WK ZN PAV MRK SHT TERM (TAB) TY W EA 589.000 768.000 1.000 768.00 0666 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 23,540.000 21,055.000 .360 7,579.80 0666 REFL PAV MRK TY I (W) 8" (SLD)(100MIL) LF 1,492.000 1,356.000 1.100 1,491.60 0666 REFL PAV MRK TY I (W) 12"(SLD)(090MIL) LF 120.000 290.000 3.300 957.00 0666 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 336.000 400.000 5.500 2,200.00 0666 REFL PAV MRK TY I (W) (ARROW) (100MIL) EA 17.000 18.000 140.000 2,520.00 0666 REFL PAV MRK TY I(W)(RR XING) (100MIL) EA 2.000 2.000 500.000 1,000.00 0666 REFL PAV MRK TY I (W) (WORD) (100MIL) EA 10.000 13.000 210.000 2,730.00 0666 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 750.000 730.000 .360 262.80 0666 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 23,540.000 26,979.000 .360 9,712.44 0666 REF PAV MRK TY II (W) 4" (SLD) LF 23,540.000 21,055.000 .270 5,684.85 0666 REF PAV MRK TY II (W) 8" (SLD) LF 1,492.000 1,356.000 .550 745.80 0666 REF PAV MRK TY II (Y) 4" (BRK) LF 750.000 730.000 .280 204.40 0666 REF PAV MRK TY II (Y) 4" (SLD) LF 23,540.000 27,050.000 .280 7,574.00 0672 REFL PAV MRKR TY II-A-A EA 80.000 528.000 4.500 2,376.00 0672 REFL PAV MRKR TY II-C-R EA 80.000 70.000 4.500 315.00 0680 INSTALL HWY TRF SIG (SYSTEM) EA 1.000 1.000 325.000 325.00 0690 REMOVAL OF CABLES LF 2,000.000 1,771.000 .500 885.50 0760 DITCH CLEANING AND RESHAPING (FOOT) LF 400.000 850.000 25.000 21,250.00 15049 BIODGRD EROSION CONTROL LOGS (18" DIA) LF 200.000 200.000 4.000 800.00 6266 VIVDS PROCESSOR SYSTEM EA 1.000 1.000 7,200.000 7,200.00 6266 VIVDS CAMERA ASSEMBLY EA 4.000 4.000 1,500.000 6,000.00 6266 VIVDS SET-UP SYSTEM EA 1.000 1.000 700.000 700.00 6266 VIVDS COMMUNICATION CABLE (COAXIAL) LF 800.000 715.000 2.100 1,501.50 6834 PORTABLE CHANGEABLE MESSAGE SIGN DAY 30.000 48.000 120.000 5,760.00 0 SUBTOTAL BID ITEMS $ 993,018.77 0 CONTRACT TOTAL ALL ITEMS $ 993,018.77 1MIS.CIS.05 CONSTR ESTIMATE DISTRIBUTION CONTRACT 3124021 MGR.NO. 054 PAGE 001 CONT 6230 SEC 92 JOB 001 RES ENGR GUPTA, RAM PROJ RMC - 623092001 HWY BF1187C 2501 SW LOOP 820 FORT WOR CNTY TARRANT DIST 02 CONTRACT PRICE $ 984,699.20 REPORT DATE 02/21/2013 17.10.40 CONTRACTOR PEACHTREE CONSTRUCTION, LTD. 9654 EST PERIOD JUN 11,2012 TO DEC 12,2012 EST NO 004 & FINAL ********************************************************************************************************************************** CO NO PROJECT CONT SEC JOB LINE NO TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 220 RMC - 623092001 6230-92-001 993,018.77 .00 993,018.77 .00 4,270.00 988,748.77 980,281.06 8,467.71 ---------------------------------------------------------------------------------------------------------------------------------- 0********************************** TOTALS ***************************************************************************** TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 993,018.77 .00 993,018.77 .00 4,270.00 988,748.77 980,281.06 8,467.71 ---------------------------------------------------------------------------------------------------------------------------------- 0INPUT PROOF READ BY- SUPPORTING PAPERS OK ------------------------------ ---------------------------- 0 **APPROVED BY** DATE --------------------------------------------- AREA/PROJECT ENGINEER 0 DATE --------------------------------------------- DISTRICT ENGINEER 1MIS.CIS.07 WORK PERFORMED THIS PERIOD CONTRACT 3124021 MGR.NO. 054 PAGE 001 CONT 6230 SEC 92 JOB 001 RES ENGR GUPTA, RAM PROJ RMC - 623092001 HWY BF1187C 2501 SW LOOP 820 FORT WOR CNTY TARRANT DIST 02 CONTRACT PRICE $ 984,699.20 REPORT DATE 02/21/2013 17.10.41 CONTRACTOR PEACHTREE CONSTRUCTION, LTD. 9654 EST PERIOD JUN 11,2012 TO DEC 12,2012 EST NO 004 & FINAL ********************************************************************************************************************* - CONTROL PROJECT DISTRICT HIGHWAY COUNTY 6230-92-001 RMC - 623092001 02 BF1187C TARRANT -LIMITS - BF 1187C FROM CONCRETE PAVEMENT TO FM 1187 BYPASS IN SOUTH TARRANT COUNTY LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES THIS ESTIMATE PRICE($) ($) 0 195 0636 REPLACE EXISTING ALUMINUM SF 12.000 54.000 27.000 1,458.00 SIGNS (TY A) 200 0644 IN SM RD SN SUP&AM EA 2.000 -2.000 585.000 -1,170.00 TY10BWG(1)SA(P) 205 0644 IN SM RD SN SUP&AM EA 2.000 2.000 700.000 1,400.00 TY10BWG(1)SA(T) 220 0644 REMOVE SM RD SN SUP & AM EA 9.000 21.000 110.000 2,310.00 245 0666 REFL PAV MRK TY I (W) 4" LF 23,540.000 -20,992.000 0.360 -7,557.12 (SLD)(100MIL) 250 0666 REFL PAV MRK TY I (W) 8" LF 1,492.000 -963.000 1.100 -1,059.30 (SLD)(100MIL) 255 0666 REFL PAV MRK TY I (W) LF 120.000 -10.000 3.300 -33.00 12"(SLD)(090MIL) 260 0666 REFL PAV MRK TY I (W) LF 336.000 -200.000 5.500 -1,100.00 24"(SLD)(100MIL) 280 0666 REFL PAV MRK TY I (Y) 4" LF 750.000 -750.000 0.360 -270.00 (BRK)(100MIL) 285 0666 REFL PAV MRK TY I (Y) 4" LF 23,540.000 -14,472.000 0.360 -5,209.92 (SLD)(100MIL) 295 0666 REF PAV MRK TY II (W) 4" LF 23,540.000 21,055.000 0.270 5,684.85 (SLD) 300 0666 REF PAV MRK TY II (W) 8" LF 1,492.000 1,356.000 0.550 745.80 (SLD) 330 0666 REF PAV MRK TY II (Y) 4" LF 750.000 730.000 0.280 204.40 (BRK) 335 0666 REF PAV MRK TY II (Y) 4" LF 23,540.000 27,050.000 0.280 7,574.00 (SLD) --------------- - TOTAL BID ITEMS DONE THIS ESTIMATE - $ 2,977.71 0 TOTAL AMOUNT WORK DONE TO DATE - $ 993,018.77