1MIS.CIS.01 CONTRACT TIME STATEMENT CONTRACT 8134011 MGR.NO. 770 PAGE 001 CONT 6253 SEC 53 JOB 001 RES ENGR FOWLER, DAVID PROJ RMC - 625353001 HWY FM0051 2281 E. WASHINGTON STEPHE CNTY SOMERVELL DIST 02 CONTRACT PRICE $ 1,895,641.11 REPORT DATE 08/18/2014 15.26.47 CONTRACTOR JAY MILLS CONTRACTING, EST PERIOD OCT 07,2013 TO MAY 06,2014 EST NO 009 & FINAL INCORPORATED 01465 --------------------------------------------------------------------------------------------------------- DATE WORK BEGAN OCT 07, 2013 TIME COMPUTED FROM OCT 14, 2013 SUMMARY INFORMATION 0 DATE WORKING REASONS FOR DAYS CREDITED MONTH/YEAR OR DAYS DAYS /COMMENTS FOR DAYS CHARGED PHASE I DAYS CHARGED CREDITED CONTRACT WORK DAYS = 66 206 119 87 BROUGHT FORWARD ADDL DAYS GRANTED = 50 MAY 14 1 1 TOTAL DAYS ALLOWED = 116 2 1 DATE WORK COMPLETED 05/06/14 3 1 SATURDAY DAYS CHARGED TO DATE = 122 4 1 SUNDAY ASSESSED LIQ DAMAGES = 6 5 1 LIQ DAMAGE RATE $ 785 6 1 WORK COMPLETED AND ACCEPTED LIQUIDATED DAMAGES 6 DAYS AT $ 785 PER DAY TOTAL = $ 4,710.00 0 CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR - ---------------------------- AREA/PROJECT ENGINEER - - - - - ----- ----- ----- 212 122 90 1 SATURDAY 1 SUNDAY 0 HOLIDAY 1 WORK COMPLETED AND ACCEPTED 1MIS.CIS.03 CONSTRUCTN ESTIMATE BREAKDOWN CONTRACT 8134011 MGR.NO. 770 PAGE 001 CONT 6253 SEC 53 JOB 001 RES ENGR FOWLER, DAVID PROJ RMC - 625353001 HWY FM0051 2281 E. WASHINGTON STEPHE CNTY SOMERVELL DIST 02 CONTRACT PRICE $ 1,895,641.11 REPORT DATE 08/18/2014 15.26.49 CONTRACTOR JAY MILLS CONTRACTING, EST PERIOD OCT 07,2013 TO MAY 06,2014 EST NO 009 & FINAL INCORPORATED 01465 DIST. 02 COUNTY SOMERVELL CONTROL 6253-53-001 PROJECT RMC - 625353001 HIGHWAY FM0051 0LIMITS- FM 51 FROM US 67 IN SOMERVELL COUNTY TO 5.65 MI N OF US 67 0TYPE OF WORK- MILL, BASE REPAIR, SEAL COAT 0 0050 MILLING,FLEX BASE,SEALCOAT,PVMT MRK NET LENGTH 5.650 MILES 0 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES ON CONTRACT PRICE($) ($) - 0070 ROADWAY RESTORATION ON FM 51 IN SOMERVELL COUNTY 0075 PREPARED BY: DAVID FOWLER, P.E. 0 0080 0100 PREPARING ROW AC 0.100 1.000 30,000.000 30,000.00 0085 0110 EXCAVATION (CHANNEL) CY 20.000 0.000 30.000 .00 0090 0112 SUBGRADE WIDENING (DENS CONT) STA 298.290 298.290 800.000 238,632.00 0095 0132 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 30.000 1,800.000 30.000 54,000.00 0100 0161 COMPOST MANUF TOPSOIL (BOS) (4") SY 57,705.000 59,927.000 .950 56,930.65 0105 0161 EROSION CONTROL COMPOST (2") SY 57,705.000 63,005.000 1.500 94,507.50 0110 0164 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 115,410.000 115,410.000 .220 25,390.20 0115 0164 CELL FBR MLCH SEED(TEMP)(WARM) SY 57,705.000 0.000 .190 .00 0120 0164 CELL FBR MLCH SEED(TEMP)(COOL) SY 57,705.000 0.000 .200 .00 0125 0168 VEGETATIVE WATERING MG 1,908.000 60.000 15.000 900.00 0130 0247 FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS) CY 5,248.000 5,248.000 40.000 209,920.00 0135 0251 REWORK BS MTL (TY D) (6") (DENS CONT) SY 33,143.000 33,143.000 2.050 67,943.15 0140 0310 PRIME COAT (MC-30) GAL 10,606.000 11,184.000 4.600 51,446.40 0145 0316 ASPH (AC-5 OR AC-10) GAL 55,879.000 46,391.000 4.020 186,491.82 0150 0316 AGGR(TY-PB GR-4 SAC-B) CY 1,270.000 1,270.000 82.500 104,775.00 0155 0430 CL C CONC FOR EXT STRU(CULV)(6'X 3') LF 16.000 16.000 500.000 8,000.00 0160 0430 CL C CONC FOR EXT STRU (CULV)(3'X 2') LF 19.000 19.000 350.000 6,650.00 0165 0430 CL C CONC FOR EXT STR 1 (CULV)(4'X 2') LF 17.000 17.000 420.000 7,140.00 0170 0432 RIPRAP (CONC)(CL B) CY 14.000 8.110 500.000 4,055.00 0175 0460 CMP (GAL STL 18 IN) LF 14.000 84.000 75.000 6,300.00 0180 0460 CMP AR (GAL STL DES 3) LF 40.000 0.000 75.000 .00 0185 0460 CMP AR (GAL STL DES 4) LF 4.000 4.000 125.000 500.00 0190 0460 CMP AR (GAL STL DES 7) LF 22.000 22.000 175.000 3,850.00 0195 0460 CMP (GAL STL 21 IN) LF 2.000 0.000 200.000 .00 0200 0464 RC PIPE (CL III)(48 IN) LF 52.000 52.000 150.000 7,800.00 0205 0464 RC PIPE (CL IV)(60 IN) LF 16.000 2.000 325.000 650.00 0210 0464 RC PIPE (CL IV)(72 IN) LF 40.000 44.000 400.000 17,600.00 0215 0466 WINGWALL (PW)(HW=3 FT) EA 4.000 4.000 5,900.000 23,600.00 0220 0466 WINGWALL (PW)(HW=4 FT) EA 6.000 6.000 6,900.000 41,400.00 0225 0466 WINGWALL (PW)(HW=5 FT) EA 2.000 2.000 11,600.000 23,200.00 0230 0466 WINGWALL (PW)(HW=6 FT) EA 6.000 6.000 15,100.000 90,600.00 0235 0466 WINGWALL (PW)(HW=7 FT) EA 4.000 4.000 20,100.000 80,400.00 0240 0467 SET (TY II)(24 IN)(RCP)(3:1)(C) EA 2.000 2.000 750.000 1,500.00 0245 0467 SET (TY II)(30 IN)(RCP)(3:1)(C) EA 10.000 10.000 950.000 9,500.00 0250 0467 SET (TY II)(30 IN)(RCP)(4:1)(C) EA 2.000 2.000 1,100.000 2,200.00 0255 0467 SET (TY II)(18 IN)(CMP)(3:1)(C) EA 2.000 2.000 610.000 1,220.00 0260 0467 SET (TY II)(21 IN)(CMP)(3:1)(C) EA 2.000 2.000 750.000 1,500.00 0265 0467 SET (TY II)(18 IN)(CMP)(6:1)(P) EA 12.000 20.000 765.000 15,300.00 0270 0467 SET (TY II)(24 IN)(CMP)(6:1)(P) EA 6.000 6.000 1,100.000 6,600.00 0275 0467 SET (TY II)(DES 3)(CMP)(3:1)(C) EA 8.000 0.000 1,725.000 .00 0280 0467 SET (TY II)(DES 4)(CMP)(3:1)(C) EA 3.000 3.000 1,700.000 5,100.00 0285 0467 SET (TY II)(DES 4)(CMP)(4:1)(C) EA 1.000 1.000 2,100.000 2,100.00 0290 0500 MOBILIZATION LS 1.000 1.000 160,000.000 160,000.00 0295 0502 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 5.000 6,150.000 30,750.00 0300 0530 DRIVEWAYS (SURF TREAT) SY 1,401.000 1,867.000 13.500 25,204.50 0305 0530 TURNOUTS (SURF TREAT) SY 203.000 217.000 13.500 2,929.50 0310 0556 PIPE UNDERDRAINS (TY 5,6,7 OR 8)(6") LF 100.000 0.000 22.000 .00 0315 0560 MAILBOX INSTALL-S (RR-POST) TY 4 FND-TB EA 7.000 7.000 170.000 1,190.00 0320 0560 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 1.000 1.000 525.000 525.00 0325 0644 RELOCATE SM RD SN SUP & AM TY 10BWG EA 167.000 104.000 275.000 28,600.00 0330 0658 INSTL OM ASSM (OM-2Z)(FLX)GND EA 40.000 64.000 35.000 2,240.00 0335 0662 WK ZN PAV MRK SHT TERM (TAB) 1 TY Y-2 EA 2,932.000 2,932.000 1.250 3,665.00 0340 0666 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 59,664.000 59,664.000 .400 23,865.60 0345 0666 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 14.000 65.000 27.500 1,787.50 0350 0666 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 230.000 230.000 .420 96.60 0355 0666 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 58,627.000 58,627.000 .400 23,450.80 0360 0672 REFL PAV MRKR TY II-A-A EA 746.000 605.000 3.030 1,833.15 0365 0681 TEMP TRAF SIGNALS EA 1.000 1.000 52,000.000 52,000.00 0370 1122 ROCK FILTER DAMS (INSTALL) (TY 1) LF 1,000.000 777.000 15.000 11,655.00 0375 1122 ROCK FILTER DAMS (REMOVE) LF 1,000.000 777.000 5.000 3,885.00 0380 1122 EARTHWORK (ERSN & SEDM CONT, IN VEH) CY 20.000 0.000 25.000 .00 0385 1122 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 2,000.000 2,000.000 2.550 5,100.00 0390 1122 BIOGRD EROSN CONT LOGS (12" DIA)INSTALL LF 1,000.000 1,000.000 3.000 3,000.00 0395 1122 BIODEGRADBLE EROSION CONTROL LOGS REMOV LF 1,000.000 0.000 .600 .00 0400 1122 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 2,000.000 2,000.000 .750 1,500.00 0405 0104*REMOVING CONC (RIPRAP) SY 102.000 102.000 9.000 918.00 0415 0275*CEMENT TON 4.000 4.000 250.000 1,000.00 0420 0275*CEMENT TREAT (EXIST MATL) (6") SY 320.000 867.000 4.500 3,901.50 0425 0460*CMP AR (GAL STL DES 5) LF 40.000 40.000 145.000 5,800.00 0430 0467*SET (TY II)(DES 5)(CMP)(4:1)(C) EA 8.000 8.000 3,600.000 28,800.00 0435 9001*RETURN 8 DES 3 SET TO COMPANY LS 1.000 1.000 2,800.000 2,800.00 0440 9001*TXDOT PURCHASE OF DES 3 PIPE LS 1.000 1.000 1,000.000 1,000.00 0445 3268*D-GR HMA TY-D PG76-22 (LEVEL-UP) TON 49.300 49.300 194.600 9,593.78 0450 6055*IN-LANE OR TRANSVERSE RUMBLE STRIP LF 190.000 190.000 15.900 3,021.00 0 SUBTOTAL BID ITEMS $ 1,927,813.65 0 TOTAL AMOUNT WORK DONE MILLING,FLEX BASE,SEALCOAT,PVMT MRK $ 1,927,813.65 0 TOTAL AMOUNT WORK DONE CONTROL 6253-53-001 $ 1,927,813.65 0 * ITEMS ADDED IN ACCORDANCE WITH STANDARD SPECIFICATIONS OR BY SUPPLEMENTAL AGREEMENTS 1MIS.CIS.04 CONSTRUCTION ESTIMATE COMBINED CONTRACT 8134011 MGR.NO. 770 PAGE 001 CONT 6253 SEC 53 JOB 001 RES ENGR FOWLER, DAVID PROJ RMC - 625353001 HWY FM0051 2281 E. WASHINGTON STEPHE CNTY SOMERVELL DIST 02 CONTRACT PRICE $ 1,895,641.11 REPORT DATE 08/18/2014 15.26.49 CONTRACTOR JAY MILLS CONTRACTING, EST PERIOD OCT 07,2013 TO MAY 06,2014 EST NO 009 & FINAL INCORPORATED 01465 0*********************************************************************************************************************************** -LIMITS - FM 51 FROM US 67 IN SOMERVELL COUNTY 0 TO 5.65 MI N OF US 67 DATE WORK BEGAN OCT 7 , 2013 WORKING DAYS USED 122 PERCENT COMPLETE 100.00 PERCENT TIME USED 105.10 DATE COMPLETED MAY 6 2014 0 CONTROL PROJECT DISTRICT HIGHWAY COUNTY 0 6253-53-001 RMC - 625353001 02 FM0051 SOMERVELL - ITEM DESCRIPTION UNIT ESTIMATED WORK DONE CONTRACT AMOUNT NO. QUANTITIES ON CONTRACT PRICE($) ($) -0100 PREPARING ROW AC 0.100 1.000 30,000.000 30,000.00 0112 SUBGRADE WIDENING (DENS CONT) STA 298.290 298.290 800.000 238,632.00 0132 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 30.000 1,800.000 30.000 54,000.00 0161 COMPOST MANUF TOPSOIL (BOS) (4") SY 57,705.000 59,927.000 .950 56,930.65 0161 EROSION CONTROL COMPOST (2") SY 57,705.000 63,005.000 1.500 94,507.50 0164 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 115,410.000 115,410.000 .220 25,390.20 0168 VEGETATIVE WATERING MG 1,908.000 60.000 15.000 900.00 0247 FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS) CY 5,248.000 5,248.000 40.000 209,920.00 0251 REWORK BS MTL (TY D) (6") (DENS CONT) SY 33,143.000 33,143.000 2.050 67,943.15 0310 PRIME COAT (MC-30) GAL 10,606.000 11,184.000 4.600 51,446.40 0316 ASPH (AC-5 OR AC-10) GAL 55,879.000 46,391.000 4.020 186,491.82 0316 AGGR(TY-PB GR-4 SAC-B) CY 1,270.000 1,270.000 82.500 104,775.00 0430 CL C CONC FOR EXT STRU(CULV)(6'X 3') LF 16.000 16.000 500.000 8,000.00 0430 CL C CONC FOR EXT STRU (CULV)(3'X 2') LF 19.000 19.000 350.000 6,650.00 0430 CL C CONC FOR EXT STR (CULV)(4'X 2') LF 17.000 17.000 420.000 7,140.00 0432 RIPRAP (CONC)(CL B) CY 14.000 8.110 500.000 4,055.00 10460 CMP (GAL STL 18 IN) LF 14.000 84.000 75.000 6,300.00 0460 CMP AR (GAL STL DES 4) LF 4.000 4.000 125.000 500.00 0460 CMP AR (GAL STL DES 7) LF 22.000 22.000 175.000 3,850.00 0464 RC PIPE (CL III)(48 IN) LF 52.000 52.000 150.000 7,800.00 0464 RC PIPE (CL IV)(60 IN) LF 16.000 2.000 325.000 650.00 0464 RC PIPE (CL IV)(72 IN) LF 40.000 44.000 400.000 17,600.00 0466 WINGWALL (PW)(HW=3 FT) EA 4.000 4.000 5,900.000 23,600.00 0466 WINGWALL (PW)(HW=4 FT) EA 6.000 6.000 6,900.000 41,400.00 0466 WINGWALL (PW)(HW=5 FT) EA 2.000 2.000 11,600.000 23,200.00 0466 WINGWALL (PW)(HW=6 FT) EA 6.000 6.000 15,100.000 90,600.00 0466 WINGWALL (PW)(HW=7 FT) EA 4.000 4.000 20,100.000 80,400.00 0467 SET (TY II)(24 IN)(RCP)(3:1)(C) EA 2.000 2.000 750.000 1,500.00 0467 SET (TY II)(30 IN)(RCP)(3:1)(C) EA 10.000 10.000 950.000 9,500.00 0467 SET (TY II)(30 IN)(RCP)(4:1)(C) EA 2.000 2.000 1,100.000 2,200.00 0467 SET (TY II)(18 IN)(CMP)(3:1)(C) EA 2.000 2.000 610.000 1,220.00 0467 SET (TY II)(21 IN)(CMP)(3:1)(C) EA 2.000 2.000 750.000 1,500.00 0467 SET (TY II)(18 IN)(CMP)(6:1)(P) EA 12.000 20.000 765.000 15,300.00 0467 SET (TY II)(24 IN)(CMP)(6:1)(P) EA 6.000 6.000 1,100.000 6,600.00 0467 SET (TY II)(DES 4)(CMP)(3:1)(C) EA 3.000 3.000 1,700.000 5,100.00 0467 SET (TY II)(DES 4)(CMP)(4:1)(C) EA 1.000 1.000 2,100.000 2,100.00 0500 MOBILIZATION LS 1.000 1.000 160,000.000 160,000.00 0502 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 5.000 6,150.000 30,750.00 0530 DRIVEWAYS (SURF TREAT) SY 1,401.000 1,867.000 13.500 25,204.50 0530 TURNOUTS (SURF TREAT) SY 203.000 217.000 13.500 2,929.50 0560 MAILBOX INSTALL-S (RR-POST) TY 4 FND-TB EA 7.000 7.000 170.000 1,190.00 0560 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 1.000 1.000 525.000 525.00 0644 RELOCATE SM RD SN SUP & AM TY 10BWG EA 167.000 104.000 275.000 28,600.00 0658 INSTL OM ASSM (OM-2Z)(FLX)GND EA 40.000 64.000 35.000 2,240.00 0662 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 2,932.000 2,932.000 1.250 3,665.00 0666 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 59,664.000 59,664.000 .400 23,865.60 0666 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 14.000 65.000 27.500 1,787.50 0666 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 230.000 230.000 .420 96.60 0666 REFL PAV MRK TY I (Y) 4" 1 (SLD)(100MIL) LF 58,627.000 58,627.000 .400 23,450.80 0672 REFL PAV MRKR TY II-A-A EA 746.000 605.000 3.030 1,833.15 0681 TEMP TRAF SIGNALS EA 1.000 1.000 52,000.000 52,000.00 1122 ROCK FILTER DAMS (INSTALL) (TY 1) LF 1,000.000 777.000 15.000 11,655.00 1122 ROCK FILTER DAMS (REMOVE) LF 1,000.000 777.000 5.000 3,885.00 1122 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 2,000.000 2,000.000 2.550 5,100.00 1122 BIOGRD EROSN CONT LOGS (12" DIA)INSTALL LF 1,000.000 1,000.000 3.000 3,000.00 1122 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 2,000.000 2,000.000 .750 1,500.00 0 * ITEMS ADDED IN ACCORDANCE WITH STANDARD SPECIFICATIONS OR BY SUPPLEMENTAL AGREEMENTS 00104* REMOVING CONC (RIPRAP) SY 102.000 102.000 9.000 918.00 0275* CEMENT TON 4.000 4.000 250.000 1,000.00 0275* CEMENT TREAT (EXIST MATL) (6") SY 320.000 867.000 4.500 3,901.50 0460* CMP AR (GAL STL DES 5) LF 40.000 40.000 145.000 5,800.00 0467* SET (TY II)(DES 5)(CMP)(4:1)(C) EA 8.000 8.000 3,600.000 28,800.00 3268* D-GR HMA TY-D PG76-22 (LEVEL-UP) TON 49.300 49.300 194.600 9,593.78 6055* IN-LANE OR TRANSVERSE RUMBLE STRIP LF 190.000 190.000 15.900 3,021.00 9001* RETURN 8 DES 3 SET TO COMPANY LS 1.000 1.000 2,800.000 2,800.00 9001* TXDOT PURCHASE OF DES 3 PIPE LS 1.000 1.000 1,000.000 1,000.00 0 SUBTOTAL BID ITEMS $ 1,927,813.65 0 CONTRACT TOTAL ALL ITEMS $ 1,927,813.65 1MIS.CIS.05 CONSTR ESTIMATE DISTRIBUTION CONTRACT 8134011 MGR.NO. 770 PAGE 001 CONT 6253 SEC 53 JOB 001 RES ENGR FOWLER, DAVID PROJ RMC - 625353001 HWY FM0051 2281 E. WASHINGTON STEPHE CNTY SOMERVELL DIST 02 CONTRACT PRICE $ 1,895,641.11 REPORT DATE 08/18/2014 15.26.49 CONTRACTOR JAY MILLS CONTRACTING, EST PERIOD OCT 07,2013 TO MAY 06,2014 EST NO 009 & FINAL INCORPORATED 01465 ********************************************************************************************************************************** CO NO PROJECT CONT SEC JOB LINE NO TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 213 RMC - 625353001 6253-53-001 1,927,813.65 .00 1,927,813.65 .00 4,710.00 1,923,103.65 1,921,270.50 1,833.15 ---------------------------------------------------------------------------------------------------------------------------------- 0********************************** TOTALS ***************************************************************************** TOTAL AMOUNT .00 % DIFFERENCE LESS TOTAL LESS LIQ DIFFERENCE LESS PREV AMOUNT DUE WORK DONE RETAINAGE SPL DEDUCTS DAMAGE PAYMENTS THIS EST ********************************************************************************************************************************** 1,927,813.65 .00 1,927,813.65 .00 4,710.00 1,923,103.65 1,921,270.50 1,833.15 ---------------------------------------------------------------------------------------------------------------------------------- 0INPUT PROOF READ BY- SUPPORTING PAPERS OK ------------------------------ ---------------------------- 0 **APPROVED BY** DATE --------------------------------------------- AREA/PROJECT ENGINEER 0 DATE --------------------------------------------- DISTRICT ENGINEER 1MIS.CIS.07 WORK PERFORMED THIS PERIOD CONTRACT 8134011 MGR.NO. 770 PAGE 001 CONT 6253 SEC 53 JOB 001 RES ENGR FOWLER, DAVID PROJ RMC - 625353001 HWY FM0051 2281 E. WASHINGTON STEPHE CNTY SOMERVELL DIST 02 CONTRACT PRICE $ 1,895,641.11 REPORT DATE 08/18/2014 15.26.50 CONTRACTOR JAY MILLS CONTRACTING, EST PERIOD OCT 07,2013 TO MAY 06,2014 EST NO 009 & FINAL INCORPORATED 01465 ********************************************************************************************************************* - CONTROL PROJECT DISTRICT HIGHWAY COUNTY 6253-53-001 RMC - 625353001 02 FM0051 SOMERVELL -LIMITS - FM 51 FROM US 67 IN SOMERVELL COUNTY TO 5.65 MI N OF US 67 LINE ITEM ESTIMATED WORK DONE CONTRACT AMOUNT NO. NO. DESCRIPTION UNIT QUANTITIES THIS ESTIMATE PRICE($) ($) 0 360 0672 REFL PAV MRKR TY II-A-A EA 746.000 605.000 3.030 1,833.15 --------------- - TOTAL BID ITEMS DONE THIS ESTIMATE - $ 1,833.15 0 TOTAL AMOUNT WORK DONE TO DATE - $ 1,927,813.65