COUNTY: MARTIN HIGHWAY: IH 20 LENGTH: 3.4910MI CONTROL NUMBER: 0005-04-071 DBE GOAL: 1.0 % PROJECT NUMBER: NH 2018(266) TYPE: PLANE,HOTMIX,MBGF & PAV MRKS TIME FOR COMPLETION: 137 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM NOVEMBER 03, 2017*EST.COST: 7,645,549.16 BIDS WILL BE OPENED: 1:00 PM NOVEMBER 03, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONSAUL ROMERO JR, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 5100 W IH 20 200 E RIVERSIDEMIDLAND, TX 79703 AUSTIN TX 78704-1204432/694-2195 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: WEST OF SH 137 LIMITS TO: EAST OF BI 20-F EAST INTERCHANGE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6002BACKFILL (TY B)STA 370.0001 150 6002BLADINGHR 15.0002 216 6001PROOF ROLLINGHR 15.0003 310 6005PRIME COAT (AE-P)GAL 28,778.0004 344 6014SUPERPAVE MIXTURES SP-B PG70-22TON 58,053.0005 347 6002TOM-C (AGGREGATE) SAC-ATON 10,028.0006 347 6003TOM (ASPHALT) PG 70-22TON 797.0007 354 6041PLANE ASPH CONC PAV (1.5")SY 152,020.0008 354 6045PLANE ASPH CONC PAV (2")SY 1,944.0009 354 6085PLANE ASPH CONC PAV (8.5")SY 104,012.00010 354 6100PLANE ASPH CONC PAV (5")SY 39,867.00011 354 6203PLANE ASPH CONC PAV (1" TO 1 1/2")SY 1,692.00012 454 6009JOINT SEALANTLF 160.00013 500 6001MOBILIZATIONLS 1.00014 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00015 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 1,955.00016 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,955.00017 533 6001RUMBLE STRIPS (SHOULDER)LF 73,727.00018 540 6010MTL W-BEAM GD FEN ADJUSTMENTLF 690.00019 540 6011MTL THRIE-BEAM GD FEN ADJUSTMENTLF 20.00020 544 6002GUARDRAIL END TREATMENT (MOVE & RESET)EA 1.00021 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 9,216.00022 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 49,124.00023 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 47,319.00024 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 5,530.00025 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 276.00026 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 3,485.00027 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 9,216.00028 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 49,124.00029 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 47,319.00030 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 118.00031 672 6009REFL PAV MRKR TY II-A-AEA 45.00032 672 6010REFL PAV MRKR TY II-C-REA 753.00033 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00034 60556001TMSP RADAR SPEED CONTROL MONITOREA 2.00035 60796001AUTO PORT SMRT TRF MONITOR SYSDAY 140.00036 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $30,000.00