COUNTY: TARRANT HIGHWAY: SH 180 LENGTH: 4.9030MI CONTROL NUMBER: 0008-05-027, ETCSBE GOAL: 0.0 % PROJECT NUMBER: C 8-5-27, ETC TYPE: BASE RPR, MILL, OVERLAY, PAVMT MARK TIME FOR COMPLETION: 150 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 02, 2018*EST.COST: 7,359,568.66 BIDS WILL BE OPENED: 1:00 PM MAY 02, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONRANDY BOWERS ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2501 SW LOOP 820 200 E RIVERSIDEFORT WORTH, TX 76133 AUSTIN TX 78704-1204817/370-6640 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ TARRANT0008-05-027WEST OF RIVERSIDE DRIVE SH 180C 8-5-27TIERNEY ROAD LENGTH: 3.5350 MILES TARRANT0008-06-051TIERNEY RD SH 180C 8-6-51LOUISE ST LENGTH: 1.3680 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6021REMOVING CONC (CURB)LF 5,000.0001 344 6122SUPERPAVE MIXTURES SP-D PG70-22TON 29,005.1702 344 6169SUPERPAV MIX SP-D SAC-B PG70-22(LEV-UP)TON 14,609.0003 354 6029PLANE ASPH CONC PAV(0" TO 6")SY 252,218.8604 361 6002FULL - DEPTH REPAIR CRCP (8")SY 5,081.0005 438 6010RESIZING AND SEALING JOINTSLF 191.0006 454 6007HEADER TYPE EXPANSION JOINTLF 72.0007 479 6001ADJUSTING MANHOLESEA 50.0008 500 6001MOBILIZATIONLS 1.0009 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00010 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 50.00011 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 50.00012 529 6001CONC CURB (TY I)LF 5,000.00013 530 6005DRIVEWAYS (ACP)SY 7,389.80014 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 98,507.00015 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 52,117.00016 662 6012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF 5,332.00017 662 6014WK ZN PAV MRK NON-REMOV (W)12"(SLD)LF 5,584.00018 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 1,634.00019 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 50,489.00020 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 7,342.00021 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 5,332.00022 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 5,584.00023 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 1,634.00024 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 45.00025 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 45.00026 666 6099REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)EA 12.00027 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 98,507.00028 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 52,117.00029 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 50,489.00030 672 6007REFL PAV MRKR TY I-CEA 267.00031 672 6009REFL PAV MRKR TY II-A-AEA 1,224.00032 764 6001DRAIN INLET CLEANINGEA 33.00033 40016001ASPHALT PLUG EXP JOINTLF 352.00034 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 150.00035 61856001TMA (STATIONARY)EA 5.00036 70126001CURB INLET SEDIMENT PROTECTIONLF 420.00037 70216102ADJUST WATER VALVE COVERS AND STACKSEA 50.00038 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $131,403.00