COUNTY: HARRIS HIGHWAY: UA 90 LENGTH: 6.70MI CONTROL NUMBER: 0027-09-109 DBE GOAL: 0.0 % PROJECT NUMBER: F 2B24(181) TYPE: TRAFFIC CONTROL DEVICES TIME FOR COMPLETION: 68 WORKING DAYSGUARANTY: 14,000.00 BIDS RECEIVED UNTIL: 1:00 PM SEPTEMBER 06, 2024*EST.COST: 708,509.21 BIDS WILL BE OPENED: 1:00 PM SEPTEMBER 06, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMARIA PILAR APONTE ATTN: CONSTRUCTION DIVISION - M1C3.02 18671 FM 523 6230 E. STASSNEY LANEANGLETON, TX 77515 AUSTIN TX 78744-3147979/864-8512 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SL 8 (S) LIMITS TO: IH 610 (S) ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 500 7001MOBILIZATIONLS 1.0001 502 7001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.0002 503 7001PORTABLE CHANGEABLE MESSAGE SIGNDAY 68.0003 505 7001TMA (STATIONARY)DAY 68.0004 505 7002TMA (MOBILE OPERATION)HR 60.0005 666 7182RE PM TY II (W) 12" (SLD)LF 268.0006 666 7215RE PM TY II (Y) 12" (SLD)LF 538.0007 666 7236RE PM TY III (W)(6")(SLD)LF 49,061.0008 666 7237RE PM TY III (W)(6")(BRK)LF 44,560.0009 666 7238RE PM TY III (W)(6")(DOT)LF 426.00010 666 7239RE PM TY III (W)(8")(SLD)LF 26,560.00011 666 7242RE PM TY III (W)(12")(SLD)LF 13,034.00012 666 7243RE PM TY III (W)(12")(DOT)LF 3,660.00013 666 7244RE PM TY III (W)(24")(SLD)LF 5,917.00014 666 7248RE PM TY III (Y)(6")(SLD)LF 74,424.00015 666 7251RE PM TY III (Y)(8")(SLD)LF 5,402.00016 666 7252RE PM TY III (Y)(12")(SLD)LF 2,785.00017 666 7262RE PM TY III (BLK)(6")(SHADOW)LF 44,550.00018 666 7353PAVEMENT SLER (ARROW)EA 65.00019 666 7354PAVEMENT SLER (WORD)EA 67.00020 666 7356PAVEMENT SLER (DBL ARROW)EA 28.00021 666 7358PAVEMENT SLER (UTURN ARROW)EA 6.00022 666 7364PAVEMENT SLER (RR XING)EA 4.00023 666 7365PAVEMENT SLER (YLD TRI)EA 80.00024 668 7091PREFAB PM TY C (W)(ARROW)EA 65.00025 668 7093PREFAB PM TY C (W)(DBL ARROW)EA 28.00026 668 7096PREFAB PM TY C (W)(UTURN ARROW)EA 6.00027 668 7103PREFAB PM TY C (W)(WORD)EA 67.00028 668 7108PREFAB PM TY C (W)(RR XING)EA 4.00029 668 7111PREFAB PM TY C (W)(36")(YLD TRI)EA 80.00030 672 7001REFL PAV MRKR TY I-AEA 266.00031 672 7006REFL PAV MRKR TY II-C-REA 4,574.00032 677 7002ELIM EXT PM & MRKS (6")LF 213,021.00033 677 7004ELIM EXT PM & MRKS (8")LF 31,962.00034 677 7006ELIM EXT PM & MRKS (12")LF 6,522.00035 677 7008ELIM EXT PM & MRKS (24")LF 1,995.00036 677 7009ELIM EXT PM & MRKS (ARROW)EA 65.00037 677 7010ELIM EXT PM & MRKS (DBL ARROW)EA 28.00038 677 7012ELIM EXT PM & MRKS (UTURN ARROW)EA 6.00039 677 7015ELIM EXT PM & MRKS (WORD)EA 67.00040 677 7019ELIM EXT PM & MRKS (RR XING)EA 4.00041 677 7024ELIM EXT PM & MRKS (36")(YLD TRI)EA 80.00042 678 7002PAV SURF PREP FOR MRK (6")LF 213,021.00043 678 7004PAV SURF PREP FOR MRK (8")LF 31,962.00044 678 7006PAV SURF PREP FOR MRK (12")LF 20,285.00045 678 7008PAV SURF PREP FOR MRK (24")LF 5,917.00046 678 7009PAV SURF PREP FOR MRK (ARROW)EA 65.00047 678 7010PAV SURF PREP FOR MRK (DBL ARROW)EA 28.00048 678 7012PAV SURF PREP FOR MRK (UTURN ARR)EA 6.00049 678 7016PAV SURF PREP FOR MRK (WORD)EA 67.00050 678 7020PAV SURF PREP FOR MRK (RR XING)EA 4.00051 678 7023PAV SURF PREP FOR MRK (36")(YLD TRI)EA 80.00052 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: RAILROAD FORCE ACCOUNT WORK (PART) $2,600.00 CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $3,000.00 CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $3,000.00