COUNTY: ROBERTSON, ETCHIGHWAY: SH 6, ETCLENGTH: 31.2890MI CONTROL NUMBER: 0049-06-078, ETCDBE GOAL: 0.0 % PROJECT NUMBER: NH 2018(395), ETC TYPE: ASPHALT RUBBER SEAL TIME FOR COMPLETION: 53 WORKING DAYSGUARANTY: 46,000.00 BIDS RECEIVED UNTIL: 1:00 PM JANUARY 05, 2018 EST.COST: 2,300,701.17 BIDS WILL BE OPENED: 1:00 PM JANUARY 05, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONANDREW HOLICK ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 580 IH 45 NORTH 200 E RIVERSIDEHUNTSVILLE, TX 77320 AUSTIN TX 78704-1204936/295-3462 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ ROBERTSON0049-06-0780.6 MILES NORTH OF FM 979 SH 6NH ( )0.35 MILES SOUTH OF FM 1644 WEST LENGTH: 1.3840 MILES ROBERTSON0205-01-0423.35 MILES WEST OF FM 46 US 79NH 2018(395)SH 6 LENGTH: 8.3170 MILES ROBERTSON0205-02-058FM 46 US 79NH 2018(395)3.35 MILES WEST OF FM 46 LENGTH: 3.1430 MILES GRIMES0315-03-061FM 149 E SH 90STP ( )3.7 MILES SOUTH OF FM 149E LENGTH: 3.6830 MILES BURLESON0186-03-063FM 60 SH 36NH 2018(395)FM 1361 LENGTH: 3.1680 MILES BURLESON0186-04-033FM 1361 SH 36NH 2018(395)YEGUA CREEK LENGTH: 2.1190 MILES WALKER0110-01-044US 190 (HUNTSVILLE) SH 75STP 2018(399)0.26 MI SOUTH OF SH 19 LENGTH: 3.0910 MILES BRAZOS0540-04-0770.14 MILES NORTH OF SALLIE LN FM 2154STP 2018(399)SH 40 LENGTH: 2.0230 MILES BRAZOS2446-01-029SH 6 EFR SH 30STP 2018(398)FM 158 LENGTH: 2.2790 MILES WALKER0166-08-0500.4 MILES WEST OF FM 2821 US 190STP 2018(398)NORTH SAM HOUSTON AVE LENGTH: 2.0820 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 316 6007ASPH (A-R TYPE II)GAL 559,733.0001 316 6404AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)CY 8,141.0002 500 6001MOBILIZATIONLS 1.0003 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.0004 530 6003INTERSECTIONS (SURF TREAT)SY 6,902.0005 530 6006DRIVEWAYS (SURF TREAT)SY 16,593.0006 530 6009TURNOUTS (SURF TREAT)SY 1,838.0007 644 6076REMOVE SM RD SN SUP&AMEA 2.0008 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 9,759.0009 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 11,776.00010 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 12,132.00011 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 5,661.00012 666 6099REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)EA 7.00013 666 6147REFL PAV MRK TY I (Y)24"(SLD)(100MIL)LF 1,106.00014 666 6156REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)EA 11.00015 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 39,791.00016 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 239,549.00017 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 35,250.00018 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 192,721.00019 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 99.00020 668 6078PREFAB PAV MRK TY C (W) (DBL ARROW)EA 2.00021 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 61.00022 668 6096PREFAB PAV MRK TY C (W)(BIKE SYMBOL)EA 1.00023 672 6007REFL PAV MRKR TY I-CEA 2,616.00024 672 6009REFL PAV MRKR TY II-A-AEA 6,023.00025 672 6010REFL PAV MRKR TY II-C-REA 60.00026 677 6001ELIM EXT PAV MRK & MRKS (4")LF 1,280.00027