COUNTY: LAMB HIGHWAY: SL 430 LENGTH: 0.2390MI CONTROL NUMBER: 0052-13-005 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2018(603) TYPE: INTERSECTION IMPROVEMENT TIME FOR COMPLETION: 50 WORKING DAYSGUARANTY: 13,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 07, 2018*EST.COST: 680,878.90 BIDS WILL BE OPENED: 1:00 PM MARCH 07, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONSTEVAN PEREZ ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1600 W DELANO AVE. 200 E RIVERSIDELITTLEFIELD, TX 79339 AUSTIN TX 78704-1204806/385-3552 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.239 MI WEST OF US 84 LIMITS TO: US 84 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6028REMOVING CONC (MISC)SY 123.8501 110 6001EXCAVATION (ROADWAY)CY 70.0002 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 406.0003 134 6002BACKFILL (TY B)STA 7.5204 150 6001BLADINGSTA 7.5205 251 6483REWORK BS MTL (TY C)(7"- 9.5")(DC)SY 3,520.0006 310 6009PRIME COAT (MC-30)GAL 710.0007 314 6013EMULS ASPH (EROSN CONT)(CSS-1H)GAL 330.0008 316 6017ASPH (AC-20-5TR)GAL 1,500.0009 316 6224AGGR(TY-PB GR-4 SAC-B)CY 35.00010 340 6238D-GR HMA(SQ) TY-B PG70-28TON 1,176.00011 346 6048STONE-MTRX-ASPH SMA-D SAC-A PG70-28TON 417.00012 354 6161PLANE ASPH CONC PAV (4" TO 7")SY 3,520.00013 360 6004CONC PVMT (CONT REINF - CRCP) (10")SY 690.45014 360 6027CURB (TYPE II)LF 357.20015 400 6005CEM STABIL BKFLCY 49.30016 432 6001RIPRAP (CONC)(4 IN)CY 0.70017 464 6005RC PIPE (CL III)(24 IN)LF 264.00018 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 4.00019 500 6001MOBILIZATIONLS 1.00020 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00021 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 100.00022 506 6024CONSTRUCTION EXITS (REMOVE)SY 100.00023 506 6035SANDBAGS FOR EROSION CONTROLEA 60.00024 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 2.00025 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 8.00026 658 6002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA 4.00027 658 6049INSTL OM ASSM (OM-2Z)(FLX)GND(BI)EA 4.00028 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 6.00029 666 6147REFL PAV MRK TY I (Y)24"(SLD)(100MIL)LF 45.00030 666 6224PAVEMENT SEALER 4"LF 302.00031 666 6230PAVEMENT SEALER 24"LF 45.00032 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 1,904.00033 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 2,550.00034 668 6018PREFAB PAV MRK TY B (W)(24")(SLD)LF 89.00035 678 6001PAV SURF PREP FOR MRK (4")LF 302.00036 678 6008PAV SURF PREP FOR MRK (24")LF 134.00037 730 6002FULL - WIDTH MOWINGAC 2.09038 734 6001LITTER REMOVALAC 1.05039 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 60.00040 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $52,000.00