COUNTY: BEXAR HIGHWAY: IH 37 LENGTH: 0.5730MI CONTROL NUMBER: 0073-08-195 DBE GOAL: 4.0 % PROJECT NUMBER: NH 2019(109) TYPE: BSE, STR, RAIL TIME FOR COMPLETION: 222 WORKING DAYSGUARANTY: 55,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 02, 2018*EST.COST: 2,815,159.01 BIDS WILL BE OPENED: 1:00 PM OCTOBER 02, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONEDDIE REYES ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 9320 SE LOOP 410 200 E RIVERSIDESAN ANTONIO, TX 78223 AUSTIN TX 78704-1204210/633-1401 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: HACKBERRY LIMITS TO: IH 10 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 534.0001 110 6001EXCAVATION (ROADWAY)CY 36,732.0002 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 35,788.0003 150 6002BLADINGHR 20.0004 161 6017COMPOST MANUF TOPSOIL (4")SY 15,609.0005 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 15,609.0006 164 6071BROADCAST SEED (TEMP)(WARM OR COOL)SY 15,609.0007 168 6001VEGETATIVE WATERINGMG 246.0008 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 15,609.0009 340 6239D-GR HMA(SQ) TY-B SAC-B PG64-22TON 642.00010 340 6247D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)TON 128.00011 347 6001TOM (ASPHALT) PG 76-22TON 25.00012 347 6002TOM-C (AGGREGATE) SAC-ATON 353.00013 354 6027PLANE ASPH CONC PAV(8" TO 10")SY 1,165.00014 354 6043PLANE ASPH CONC PAV (1")SY 5,316.00015 401 6001FLOWABLE BACKFILLCY 20.00016 410 6001SOIL NAIL ANCHORSLF 50,309.00017 416 6022DRILL SHAFT (SIGN MTS) (48 IN)LF 52.00018 423 6020RET. WALL (SOIL NAILED) (GUNNITE FACIA)SF 29,949.00019 432 6001RIPRAP (CONC)(4 IN)CY 67.00020 432 6045RIPRAP (MOW STRIP)(4 IN)CY 6.00021 438 6001CLEANING AND SEALING EXISTING JOINTSLF 174.00022 450 6054RAIL (TY SSTR) (W/DRAIN SLOTS)LF 2,060.20023 450 6062 RAIL (TY SSTR)(MOD)LF 26.80024 454 6008HEADER TYPE EXPANSION JOINTCF 30.00025 454 6009JOINT SEALANTLF 174.00026 500 6001MOBILIZATIONLS 1.00027 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 11.00028 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 171.00029 506 6011ROCK FILTER DAMS (REMOVE)LF 171.00030 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 336.00031 506 6024CONSTRUCTION EXITS (REMOVE)SY 336.00032 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 3,922.00033 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 3,922.00034 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 123.00035 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 123.00036 512 6005PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF 1,220.00037 512 6029PORT CTB (MOVE)(F-SHAPE)(TY 1)LF 1,785.00038 512 6053PORT CTB (REMOVE)(F-SHAPE)(TY 1)LF 3,005.00039 540 6001MTL W-BEAM GD FEN (TIM POST)LF 25.00040 540 6021MTL THRIE-BEAM GD FEN (TIM POST)EA 1.00041 542 6001REMOVE METAL BEAM GUARD FENCELF 1,984.00042 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 3.00043 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 1.00044 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 1.00045 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 1.00046 545 6005CRASH CUSH ATTEN (REMOVE)EA 1.00047 624 6028REMOVE GROUND BOXEA 3.00048 636 6003ALUMINUM SIGNS (TY O)SF 116.00049 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 3.00050 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 1.00051 644 6076REMOVE SM RD SN SUP&AMEA 2.00052 650 6032INS OH SN SUP(30 FT CANT)EA 1.00053 650 6204REMOVE OVERHD SIGN SUPEA 1.00054 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 23.00055 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 3.00056 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 2,605.00057 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 230.00058 666 6039REFL PAV MRK TY I (W)12"(LNDP)(100MIL)LF 230.00059 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 125.00060 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 2.00061 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 2.00062 666 6224PAVEMENT SEALER 4"LF 3,110.00063 666 6225PAVEMENT SEALER 6"LF 426.00064 666 6226PAVEMENT SEALER 8"LF 230.00065 666 6228PAVEMENT SEALER 12"LF 355.00066 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 436.00067 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 2,875.00068 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 235.00069 672 6010REFL PAV MRKR TY II-C-REA 68.00070 677 6001ELIM EXT PAV MRK & MRKS (4")LF 357.00071 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 256.00072 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00073 61856002TMA (STATIONARY)DAY 32.00074 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $44,400.00