COUNTY: DALLAS, ETCHIGHWAY: IH 20, ETCLENGTH: 7.9060MI CONTROL NUMBER: 0095-13-040, ETCDBE GOAL: 0.0 % PROJECT NUMBER: NH 2018(450), ETC TYPE: LANDSCAPE ENHANCEMENT TIME FOR COMPLETION: 266 WORKING DAYSGUARANTY: 58,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 02, 2018*EST.COST: 3,371,472.91 BIDS WILL BE OPENED: 1:00 PM MAY 02, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJASON MASHELL ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4777 E. HIGHWAY 80 200 E RIVERSIDEMESQUITE, TX 75150 AUSTIN TX 78704-1204214/319-6502 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ DALLAS0095-13-040AT SEAGOVILLE ROAD IH 20NH 2018(450)AT S BELTLINE ROAD LENGTH: 2.3550 MILES DALLAS0009-03-046AT ANTIOCH SH 66NH 2018(886). LENGTH: 0.0540 MILES KAUFMAN0197-08-008WEST OF JACKSON ST SH 243NH 2018(886)WASHINGTON ST LENGTH: 0.1030 MILES ROCKWALL0009-04-069HERITAGE PARKWAY SH 66NH 2018(886)EASTERN CITY LIMITS LENGTH: 0.1790 MILES DALLAS0430-01-062SAM HOUSTON SH 352NH 2018(886)SH 352 LENGTH: 3.63 MILES DALLAS2374-02-155ELAM ROAD IH 635NH 2018(450)LAKE JUNE ROAD LENGTH: 1.5850 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6001PREPARING ROWAC 0.7901 100 6002PREPARING ROWSTA 53.0002 104 6011REMOVING CONC (MEDIANS)SY 629.0003 110 6003EXCAVATION (SPECIAL)CY 1,683.0004 158 6005SPEC EXCAV WORK (ORIGINAL)CY 151.0005 160 6005FURNISHING AND PLACING TOPSOILCY 72.0006 161 6022GENERAL USE COMPOST (4")SY 1,322.0007 161 6024GENERAL USE COMPOST (2")SY 33.7508 161 6028COMPOST MANUF TOPSOIL (2")SY 39,412.0009 162 6002BLOCK SODDINGSY 2,450.00010 162 6004MULCH SODDINGSY 191.00011 166 6001FERTILIZERAC 1.49012 168 6001VEGETATIVE WATERINGMG 100.00013 170 6002IRRIGATION SYSTEM (TY I)LS 1.00014 170 6003IRRIGATION SYSTEM (TY II)LS 1.00015 170 6004IRRIGATION SYSTEM (TY III)LS 1.00016 170 6005IRRIGATION SYSTEM (TY IV)LS 1.00017 192 6002PLANT MATERIAL (1-GAL)EA 20,169.00018 192 6003PLANT MATERIAL (3-GAL)EA 3,513.00019 192 6004PLANT MATERIAL (5-GAL)EA 6,741.00020 192 6005PLANT MATERIAL (15-GAL)EA 389.00021 192 6012MULCHCY 8.00022 192 6013MULCHSY 4,716.00023 192 6015LANDSCAPE EDGELF 2,783.00024 192 6016PLANT BED PREPARATIONSY 27,176.00025 192 6017VEGETATION BARRIERSY 474.00026 192 6024PLANT MATERIAL (30 GAL) (TREE)EA 73.00027 192 6025PLANT MATERIAL (45 GAL) (TREE)EA 30.00028 192 6026PLANT MATERIAL (65 GAL) (TREE)EA 30.00029 192 6063PLANT BED PREP (TYPE I)SY 27.00030 192 6097CONC LNDSCP EDG (12 IN WIDTH)LF 9,301.00031 193 6007IRRIGATION SYSTEM OPER AND MAINTMO 60.00032 500 6001MOBILIZATIONLS 1.00033 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 12.00034 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 550.00035 506 6024CONSTRUCTION EXITS (REMOVE)SY 550.00036 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 6,000.00037 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 6,000.00038 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 5,000.00039 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 5,000.00040 528 6002COLORED TEXTURED CONC (6")SY 171.00041 618 6023CONDT (PVC) (SCH 40) (2")LF 824.00042 618 6033CONDT (PVC) (SCH 40) (4")LF 928.00043 618 6038CONDT (PVC) (SCH 40) (6") (BORE)LF 1,160.00044 628 6120ELC SRV TY D 120/240 060(NS)AL(N)PS(U)EA 1.00045 677 6015ELIM EXT PAV MRK & MRKS (ISLAND)SF 684.00046 752 6001TREE TRIMMINGMI 1.00047 752 6015TREE AND BRUSH REMOVALAC 7.00048 10026001LANDSCAPE AMENITYEA 318.00049 10026002LANDSCAPE AMENITY (TY 1)EA 2.00050 10056001LOOSE AGGR FOR GROUNDCOVER (TYPE I)CY 3,669.00051 10056002LOOSE AGGR FOR GROUNDCOVER (TYPE II)CY 4,071.00052 61856002TMA (STATIONARY)DAY 160.00053 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $12.00