COUNTY: MOTLEY HIGHWAY: US 62 LENGTH: 0.7720MI CONTROL NUMBER: 0146-01-051 DBE GOAL: 2.5 % PROJECT NUMBER: BR 1802(481) TYPE: REPLACEMENT OF EXISTING BRIDGE FAC TIME FOR COMPLETION: 158 WORKING DAYSGUARANTY: 47,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 08, 2018*EST.COST: 2,253,025.40 BIDS WILL BE OPENED: 1:00 PM AUGUST 08, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJARRED GROVES ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 10860 SH 222 E 200 E RIVERSIDEMUNDAY, TX 76371 AUSTIN TX 78704-1204940/422-4115 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: @ HACKBERRY CREEK LIMITS TO: .___________________________7 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 106 6001OBLITERATING ABANDONED ROADSTA 39.0001 110 6001EXCAVATION (ROADWAY)CY 10,348.0002 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 10,704.0003 150 6002BLADINGHR 20.0004 164 6034DRILL SEEDING (PERM) (RURAL) (SANDY)AC 3.6005 164 6042DRILL SEEDING (TEMP) (WARM)AC 1.8006 164 6044DRILL SEEDING (TEMP) (COOL)AC 1.8007 168 6001VEGETATIVE WATERINGMG 141.0008 169 6004SOIL RETENTION BLANKETS (CL 1) (TY D)SY 550.0009 216 6001PROOF ROLLINGHR 20.00010 247 6047FL BS (CMP IN PLC)(TY B GR 3)(FNAL POS)CY 6,122.00011 310 6009PRIME COAT (MC-30)GAL 3,673.00012 314 6013EMULS ASPH (EROSN CONT)(CSS-1H)GAL 100.00013 316 6010ASPH (AC-5)GAL 6,944.00014 316 6078AGGR(TY-B GR-4 SAC-A)CY 145.00015 340 6139D-GR HMA(SQ) TY-D SAC-A PG76-28TON 2,020.00016 400 6005CEM STABIL BKFLCY 256.00017 416 6001DRILL SHAFT (18 IN)LF 170.00018 416 6004DRILL SHAFT (36 IN)LF 515.00019 420 6014CL C CONC (ABUT)(HPC)CY 74.60020 422 6002REINF CONC SLAB (HPC)SF 5,750.00021 422 6016APPROACH SLAB (HPC)CY 115.80022 425 6039PRESTR CONC GIRDER (TX54)LF 746.54023 432 6035RIPRAP (STONE PROTECTION)(24 IN)CY 240.00024 432 6045RIPRAP (MOW STRIP)(4 IN)CY 46.00025 450 6007RAIL (TY T223)(HPC)LF 310.00026 454 6001SEALED EXPANSION JOINT (4 IN) (SEJ - A)LF 102.50027 496 6010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA 1.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 10.00030 506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF 200.00031 506 6011ROCK FILTER DAMS (REMOVE)LF 200.00032 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 70.00033 506 6024CONSTRUCTION EXITS (REMOVE)SY 70.00034 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 520.00035 510 6003ONE-WAY TRAF CONT (PORT TRAF SIG)MO 2.00036 533 6001RUMBLE STRIPS (SHOULDER)LF 7,910.00037 533 6002RUMBLE STRIPS (CENTERLINE)LF 3,955.00038 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 525.00039 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00040 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00041 552 6003WIRE FENCE (TY C)LF 500.00042 552 6008WIRE FENCE (WATER GAP)LF 60.00043 644 6070RELOCATE SM RD SN SUP&AM TY S80EA 5.00044 658 6002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA 30.00045 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 2.00046 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 10.00047 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 20.00048 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 1,106.00049 662 6056WK ZN PAV MRK REMOV (TRAF BTN) TY WEA 2,598.00050 662 6075WK ZN PAV MRK REMOV (W)24"(SLD)LF 24.00051 666 6218REFL PAV MRK TY II (BLACK) 4"(SHADOW)LF 5,280.00052 666 6224PAVEMENT SEALER 4"LF 756.00053 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 8,760.00054 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 2,263.00055 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 6,497.00056 672 6010REFL PAV MRKR TY II-C-REA 408.00057 678 6001PAV SURF PREP FOR MRK (4")LF 756.00058 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00059 61856002TMA (STATIONARY)DAY 39.00060 61856005 TMA (MOBILE OPERATION)DAY 3.00061 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $63,174.00