COUNTY: WICHITA HIGHWAY: IH 44 LENGTH: 2.50MI CONTROL NUMBER: 0156-07-109 DBE GOAL: 0.0 % PROJECT NUMBER: STP 1702(401)HES TYPE: HAZARD ELIMINATION SAFETY TIME FOR COMPLETION: 85 WORKING DAYSGUARANTY: 21,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 06, 2017*EST.COST: 1,062,495.95 BIDS WILL BE OPENED: 1:00 PM JUNE 06, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDAVID M. ROHMER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2844 CENTRAL FRWY E 200 E RIVERSIDEWICHITA FALLS, TX 76301 AUSTIN TX 78704-1204940/397-2076 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.023 MI. S OF SH 240 LIMITS TO: OKLAHOMA STATE LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 535.0001 164 6071BROADCAST SEED (TEMP)(WARM OR COOL)SY 19,020.0002 168 6001VEGETATIVE WATERINGMG 241.4103 360 6002CONC PVMT (CONT REINF - CRCP) (8")SY 452.0004 432 6046RIPRAP (MOW STRIP)(5 IN)CY 942.7005 500 6001MOBILIZATIONLS 1.0006 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.0007 506 6037SANDBAGS FOR EROSION CONTROL (12")LF 120.0008 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 400.0009 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 400.00010 514 6001PERM CTB (SGL SLOPE) (TY 1) (42 )LF 1,015.00011 540 6001MTL W-BEAM GD FEN (TIM POST)LF 9,037.00012 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 18.00013 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 6.00014 540 6018MTL BM GD FEN TRANS (NON - SYM)EA 8.00015 542 6001REMOVE METAL BEAM GUARD FENCELF 9,452.00016 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 6.00017 543 6002CABLE BARRIER SYSTEM (TL-4)LF 8,065.00018 543 6020CABLE BARRIER TERMINAL SECTION (TL-4)EA 4.00019 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 16.00020 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 16.00021 545 6005CRASH CUSH ATTEN (REMOVE)EA 2.00022 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 1.00023 658 6026INSTL DEL ASSM (D-SY)SZ (BRF)CTBEA 53.00024 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 190.00025 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00