COUNTY: COMANCHE HIGHWAY: SH 36 LENGTH: 10MI CONTROL NUMBER: 0182-02-038 SBE GOAL: 0.0 % PROJECT NUMBER: C 182-2-38 TYPE: BASE OVERLAY,2 COURSE SURF TRT, ACP TIME FOR COMPLETION: 235 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 07, 2018*EST.COST: 5,314,297.75 BIDS WILL BE OPENED: 1:00 PM MARCH 07, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRIS GRAF ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 906 E MAIN ST 200 E RIVERSIDEEASTLAND, TX 76448 AUSTIN TX 78704-1204254/629-6311 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: EASTLAND C/L LIMITS TO: FM 1477 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 110 6001EXCAVATION (ROADWAY)CY 4,933.0001 150 6001BLADINGSTA 193.0002 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 43,318.0003 164 6009BROADCAST SEED (TEMP) (WARM)SY 21,659.0004 164 6011BROADCAST SEED (TEMP) (COOL)SY 21,659.0005 168 6001VEGETATIVE WATERINGMG 1,924.0006 216 6001PROOF ROLLINGHR 65.0007 247 6053FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)CY 32,073.0008 251 6086REWORK BS MTL (TY C)(10")(DENS CONT)SY 83,797.0009 310 6012PRIME COAT (RC-250)GAL 20,034.00010 316 6222AGGR(TY-PB GR-3 SAC-B)CY 813.00011 316 6226AGGR(TY-PB GR-5 SAC-B)CY 729.00012 316 6420ASPH (AC 20-5TR OR CRS-1P)GAL 33,146.00013 341 6008D-GR HMA TY-B PG64-22TON 4,177.00014 347 6001TOM (ASPHALT) PG 76-22TON 1,081.00015 1347 6002TOM-C (AGGREGATE) SAC-ATON 15,545.00016 354 6004PLAN & TEXT ASPH CONC PAV(0" TO 4")SY 1,027.00017 420 6066CL C CONC (RAIL FOUNDATION)CY 38.35018 429 6003CONC STR REPAIR(DECK REP(PART DEPTH))SF 50.00019 429 6009CONC STR REPAIR (STANDARD)SF 33.33020 432 6002RIPRAP (CONC)(5 IN)CY 20.00021 438 6004CLEANING AND SEALING EXIST JOINTS(CL7)LF 370.00022 451 6024RETROFIT RAIL (TY SSTR)LF 251.00023 460 6010CMP AR (GAL STL DES 3)LF 42.00024 467 6037SET (TY I) (DES 3) (CMP) (6: 1) (C)EA 2.00025 500 6001MOBILIZATIONLS 1.00026 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00027 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 80.00028 506 6011ROCK FILTER DAMS (REMOVE)LF 80.00029 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 420.00030 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 420.00031 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 165.00032 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 165.00033 512 6077PORT CTB (DES SOURCE)(SAFETY SH)LF 350.00034 512 6078PORT CTB (MOVE)(SAFETY SH)LF 350.00035 512 6079PORT CTB (STKPL)(SAFETY SH)LF 350.00036 530 6002INTERSECTIONS (ACP)SY 682.80037 530 6003INTERSECTIONS (SURF TREAT)SY 455.20038 530 6006DRIVEWAYS (SURF TREAT)SY 1,128.60039 530 6009TURNOUTS (SURF TREAT)SY 138.60040 540 6001MTL W-BEAM GD FEN (TIM POST)LF 400.00041 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.00042 542 6001REMOVE METAL BEAM GUARD FENCELF 970.00043 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00044 545 6001CRASH CUSH ATTEN (INSTL)EA 2.00045 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 2.00046 545 6005CRASH CUSH ATTEN (REMOVE)EA 2.00047 556 6007PIPE UNDERDRAINS (TY 7) (6")LF 150.00048 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 13.00049 560 6005MAILBOX INSTALL-D (TWG-POST) TY 2EA 1.00050 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 2.00051 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 3.00052 644 6034IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)EA 1.00053 644 6037IN SM RD SN SUP&AM TYS80(1)SA(U-WC)EA 2.00054 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 18.00055 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 12.00056 644 6070RELOCATE SM RD SN SUP&AM TY S80EA 1.00057 644 6076REMOVE SM RD SN SUP&AMEA 38.00058 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 12.00059 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 12.00060 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 82,100.00061 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 82,100.00062 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 4,100.00063 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 7,200.00064 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 421.00065 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 3,396.00066 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 47.00067 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 5,381.00068 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 107,526.00069 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 10,300.00070 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 51,242.00071 672 6007REFL PAV MRKR TY I-CEA 479.00072 672 6009REFL PAV MRKR TY II-A-AEA 1,161.00073 677 6001ELIM EXT PAV MRK & MRKS (4")LF 25,610.00074 681 6001TEMP TRAF SIGNALSEA 2.00075 61856002TMA (STATIONARY)DAY 26.00076 61856003TMA (MOBILE OPERATION)HR 360.00077 1A347 6006TOM - C (AGGREGATE) SAC - BTON 15,545.00078 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $96,500.00