COUNTY: TITUS HIGHWAY: US 271 LENGTH: 7.7210MI CONTROL NUMBER: 0221-05-090 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2018(646) TYPE: PLANE ACP, ACP SURF, & PAV MARK TIME FOR COMPLETION: 64 WORKING DAYSGUARANTY: 51,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 06, 2018*EST.COST: 2,629,224.44 BIDS WILL BE OPENED: 1:00 PM MARCH 06, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBILL COMPTON ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2210 FERGUSON RD 200 E RIVERSIDEMT PLEASANT, TX 75456 AUSTIN TX 78704-1204903/572-8511 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 1896 LIMITS TO: BU 271 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6054REMOVING CONCRETE(MOW STRIP)LF 674.0001 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 1,494.0002 168 6001VEGETATIVE WATERINGMG 24.0003 346 6014STONE-MTRX-ASPH SMA-D SAC-A PG76-22TON 12,364.0004 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 678.0005 354 6045PLANE ASPH CONC PAV (2")SY 17,905.0006 354 6048PLANE ASPH CONC PAV (3")SY 94,494.0007 432 6045RIPRAP (MOW STRIP)(4 IN)CY 203.2008 500 6001MOBILIZATIONLS 1.0009 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00010 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 500.00011 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 500.00012 530 6008TURNOUTS (ACP)SY 640.00013 533 6001RUMBLE STRIPS (SHOULDER)LF 61,409.00014 533 6002RUMBLE STRIPS (CENTERLINE)LF 29,172.00015 540 6001MTL W-BEAM GD FEN (TIM POST)LF 3,150.00016 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 50.00017 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00018 540 6017MTL BM GD FEN (LONG SPAN SYSTEM)LF 75.00019 542 6001REMOVE METAL BEAM GUARD FENCELF 2,725.00020 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 4.00021 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 24.00022 544 6004GDRAIL END TRT(INST)(WOOD POST)(TY I)EA 24.00023 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 21.00024 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 7.00025 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 3.00026 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 56.00027 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 29,199.00028 672 6009REFL PAV MRKR TY II-A-AEA 758.00029 30426001BONDING COURSESEGAL 12,364.00030 61496001REFL PAV MRK AWT (W) 4" (SLD) (100MIL)LF 64,922.00031 61496007REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)LF 44,326.00032 61496008REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)LF 4,040.00033 61856001TMA (STATIONARY)EA 4.00034 61856003TMA (MOBILE OPERATION)HR 64.00035 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $13,000.00