COUNTY: UPSHUR HIGHWAY: US 271 LENGTH: 7.0720MI CONTROL NUMBER: 0248-05-064 SBE GOAL: 0.0 % PROJECT NUMBER: C 248-5-64 TYPE: PLANE ACP, ACP SURF, & PAV MARK TIME FOR COMPLETION: 121 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 01, 2018*EST.COST: 5,482,193.80 BIDS WILL BE OPENED: 1:00 PM MAY 01, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBILL COMPTON ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2210 FERGUSON ROAD 200 E RIVERSIDEMT. PLEASANT, TX 75456 AUSTIN TX 78704-1204903/572-8511 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 155(S) LIMITS TO: FM 726 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6017REMOVING CONC (DRIVEWAYS)SY 163.0001 104 6054REMOVING CONCRETE(MOW STRIP)LF 802.0002 112 6001SUBGRADE WIDENING (ORD COMP)STA 277.0003 134 6002BACKFILL (TY B)STA 378.0004 168 6001VEGETATIVE WATERINGMG 665.0005 247 6061FL BS (CMP IN PLC)(TYA GR1-2) (6")SY 21,348.0006 344 6066SUPERPAVE MIXTURES SP-C PG76-22TON 5,485.0007 344 6138SUPERPAVE MIXTURES SP-D PG76-22TON 1,722.0008 346 6014STONE-MTRX-ASPH SMA-D SAC-A PG76-22TON 23,853.0009 354 6077PLANE ASPH CONC PAV (0" TO 3/4")SY 65,417.00010 354 6090PLANE ASPH CONC PAV (3/4")SY 145,662.00011 354 6206PLANE ASPH CONC PAV (3/4"-2")SY 4,747.00012 432 6045RIPRAP (MOW STRIP)(4 IN)CY 51.00013 500 6001MOBILIZATIONLS 1.00014 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 9.00015 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 1,040.00016 506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF 265.00017 506 6011ROCK FILTER DAMS (REMOVE)LF 1,305.00018 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 12,960.00019 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 12,960.00020 530 6004DRIVEWAYS (CONC)SY 130.00021 530 6005DRIVEWAYS (ACP)SY 1,279.00022 530 6008TURNOUTS (ACP)SY 859.00023 533 6001RUMBLE STRIPS (SHOULDER)LF 71,800.00024 540 6001MTL W-BEAM GD FEN (TIM POST)LF 587.50025 542 6001REMOVE METAL BEAM GUARD FENCELF 587.50026 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00027 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00028 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 21.00029 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 4.00030 560 6023MAILBOX INSTALL-M (TWG-POST) TY 4EA 1.00031 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 33.00032 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 38.00033 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 7.00034 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 26,590.00035 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 105,380.00036 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 112,180.00037 662 6112WK ZN PAV MRK SHT TERM RMV (W)(4")LF 8,730.00038 662 6113WK ZN PAV MRK SHT TERM RMV (Y)(4")LF 9,740.00039 666 6030REFL PAV MRK TY I (W)8"(DOT)(100MIL)LF 105.00040 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 40.00041 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 3.00042 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 5.00043 668 6108PREFAB PAV MRK TY C (Y) (24") (SLD)LF 287.00044 672 6007REFL PAV MRKR TY I-CEA 943.00045 672 6009REFL PAV MRKR TY II-A-AEA 1,114.00046 672 6010REFL PAV MRKR TY II-C-REA 5.00047 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00048 60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF 160.00049 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 9,420.00050 61496004REFL PAV MRK AWT (W) 6" (SLD) (100MIL)LF 73,788.00051 61496005REFL PAV MRK AWT (W) 6" (BRK) (100MIL)LF 18,630.00052 61496010REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)LF 76,470.00053 61856002TMA (STATIONARY)DAY 173.00054 61856003TMA (MOBILE OPERATION)HR 340.00055 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $58,000.00