COUNTY: ERATH HIGHWAY: US 67 LENGTH: 13.3770MI CONTROL NUMBER: 0259-01-036 DBE GOAL: 8.5 % PROJECT NUMBER: NH 2019(873) TYPE: SUPER-2 HIGHWAY TIME FOR COMPLETION: 214 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 03, 2019*EST.COST: 14,250,559.37 BIDS WILL BE OPENED: 1:00 PM DECEMBER 03, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDAVID FOWLER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2281 E WASHINGTON 200 E RIVERSIDESTEPHENVILLE, TX 76401 AUSTIN TX 78704-1204254/965-3511 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 220 LIMITS TO: US 281 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 506.0001 105 6011REMOVING STAB BASE AND ASPH PAV (2"-6")SY 14,973.0002 110 6001EXCAVATION (ROADWAY)CY 27,833.0003 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 17,929.0004 161 6008EROSION CONTROL COMPOST (2")SY 21,170.0005 161 6017COMPOST MANUF TOPSOIL (4")SY 89,765.0006 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 110,473.0007 168 6001VEGETATIVE WATERINGMG 4,565.0008 169 6004SOIL RETENTION BLANKETS (CL 1) (TY D)SY 3,695.0009 247 6053FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)CY 22,721.00010 310 6028PRIME COAT (MC-30 OR EC-30)GAL 28,021.00011 316 6016ASPH (AC-20XP)GAL 99,287.00012 316 6224AGGR(TY-PB GR-4 SAC-B)CY 2,579.00013 341 6008D-GR HMA TY-B PG64-22TON 15,428.00014 344 6051SUPERPAVE MIXTURES SP-C SAC-A PG70-28TON 49,997.00015 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 10,000.00016 354 6022PLANE ASPH CONC PAV(0" TO 3")SY 190,273.00017 400 6008CUT & RESTORE ASPH PAVINGSY 168.00018 402 6001TRENCH EXCAVATION PROTECTIONLF 400.00019 403 6001TEMPORARY SPL SHORINGSF 5,516.00020 416 6006DRILL SHAFT (48 IN)LF 100.00021 416 6007DRILL SHAFT (54 IN)LF 25.00022 420 6011CL B CONC (FLUME)CY 16.00023 432 6002RIPRAP (CONC)(5 IN)CY 303.00024 432 6005RIPRAP (CONC) (CL A )CY 5.00025 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 2.00026 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 224.00027 432 6046RIPRAP (MOW STRIP)(5 IN)CY 294.05028 438 6001CLEANING AND SEALING EXISTING JOINTSLF 190.00029 462 6057CONC BOX CULV (6 FT X 6 FT)(EXTEND)LF 202.00030 464 6003RC PIPE (CL III)(18 IN)LF 1,653.00031 464 6005RC PIPE (CL III)(24 IN)LF 703.00032 464 6007RC PIPE (CL III)(30 IN)LF 528.00033 464 6009RC PIPE (CL III)(42 IN)LF 28.00034 464 6014RC PIPE (CL III)(72 IN)LF 30.00035 466 6099HEADWALL (CH - PW - 0) (DIA= 30 IN)EA 1.00036 466 6173WINGWALL (PW - 1) (HW=12 FT)EA 1.00037 466 6182WINGWALL (PW - 1) (HW=7 FT)EA 2.00038 466 6183WINGWALL (PW - 1) (HW=8 FT)EA 2.00039 467 6005SET (TY I) (24 IN) (3: 1) (C)EA 2.00040 467 6006SET (TY I) (24 IN) (4: 1) (C)EA 11.00041 467 6008SET (TY I) (30 IN) (3: 1) (C)EA 7.00042 467 6009SET (TY I) (30 IN) (4: 1) (C)EA 12.00043 467 6018SET (TY I) (42 IN) (3: 1) (C)EA 1.00044 467 6019SET (TY I) (42 IN) (4: 1) (C)EA 1.00045 467 6357SET (TY II) (18 IN) (RCP) (3: 1) (P)EA 2.00046 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 56.00047 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 12.00048 480 6001CLEAN EXIST CULVERTSEA 16.00049 496 6005REMOV STR (WINGWALL)EA 27.00050 496 6006REMOV STR (HEADWALL)EA 1.00051 496 6007REMOV STR (PIPE)LF 442.00052 496 6008REMOV STR (BOX CULVERT)LF 317.00053 500 6001MOBILIZATIONLS 1.00054 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 12.00055 506 6004ROCK FILTER DAMS (INSTALL) (TY 4)LF 1,409.00056 506 6011ROCK FILTER DAMS (REMOVE)LF 1,409.00057 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 2,184.00058 506 6024CONSTRUCTION EXITS (REMOVE)SY 2,184.00059 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 12,990.00060 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 12,990.00061 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 2,036.00062 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 2,036.00063 510 6001ONE-WAY TRAF CONT (FLAGGER CONT)HR 160.00064 512 6001PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)LF 1,650.00065 512 6025PORT CTB (MOVE)(SGL SLP)(TY 1)LF 1,020.00066 512 6037PORT CTB (STKPL)(SGL SLP)(TY 1)LF 1,650.00067 514 6001PERM CTB (SGL SLOPE) (TY 1) (42 )LF 400.00068 530 6002INTERSECTIONS (ACP)SY 790.00069 530 6005DRIVEWAYS (ACP)SY 603.00070 530 6006DRIVEWAYS (SURF TREAT)SY 1,038.00071 533 6001RUMBLE STRIPS (SHOULDER)LF 139,507.00072 533 6002RUMBLE STRIPS (CENTERLINE)LF 70,331.00073 540 6001MTL W-BEAM GD FEN (TIM POST)LF 3,050.00074 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 2.00075 542 6001REMOVE METAL BEAM GUARD FENCELF 298.00076 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 18.00077 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 5.00078 545 6004CRASH CUSH ATTEN (STKPL)EA 5.00079 545 6005CRASH CUSH ATTEN (REMOVE)EA 10.00080 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 10.00081 560 6001MAILBOX INSTALL-S (TWG-POST) TY 1EA 5.00082 560 6002MAILBOX INSTALL-D (TWG-POST) TY 1EA 3.00083 618 6023CONDT (PVC) (SCH 40) (2")LF 35.00084 618 6029CONDT (PVC) (SCH 40) (3")LF 360.00085 618 6054CONDT (PVC) (SCH 80) (3") (BORE)LF 260.00086 618 6070CONDT (RM) (2")LF 4.00087 618 6074CONDT (RM) (3")LF 16.00088 620 6009ELEC CONDR (NO.6) BARELF 453.00089 620 6010ELEC CONDR (NO.6) INSULATEDLF 906.00090 620 6011ELEC CONDR (NO.4) BARELF 149.00091 620 6012ELEC CONDR (NO.4) INSULATEDLF 432.00092 628 6132ELC SRV TY D 120/240 060(NS)GS(N)SP(U)EA 1.00093 628 6152ELC SRV TY D 120/240 060(NS)SS(N)SP(O)EA 4.00094 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 126.00095 644 6002IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)EA 16.00096 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 17.00097 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 1.00098 644 6017IN SM RD SN SUP&AM TY10BWG(2)SA(P)EA 6.00099 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 1.000100 650 6035INS OH SN SUP(35 FT BAL TEE)EA 1.000101 658 6002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA 71.000102 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 5.000103 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 35.000104 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 60.000105 658 6053INSTL OM ASSM (OM-3L)(TWT)GNDEA 2.000106 658 6057INSTL OM ASSM (OM-3R)(TWT)GNDEA 2.000107 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 1,805.000108 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 100,282.000109 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 43.000110 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 96,250.000111 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 42,168.000112 666 6006REFL PAV MRK TY I (W)4"(DOT)(100MIL)LF 2,355.000113 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 1,620.000114 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 77.000115 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 275.000116 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 2.000117 666 6072REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)EA 14.000118 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 2.000119 666 6102REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)EA 10.000120 666 6147REFL PAV MRK TY I (Y)24"(SLD)(100MIL)LF 397.000121 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 11,330.000122 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 139,507.000123 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 140,663.000124 672 6007REFL PAV MRKR TY I-CEA 607.000125 672 6009REFL PAV MRKR TY II-A-AEA 1,852.000126 682 6003VEH SIG SEC (12")LED(YEL)EA 12.000127 685 6004INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)EA 6.000128 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 16.000129 60106002CCTV FIELD EQUIPMENT (DIGITAL)EA 4.000130 60106004CCTV MOUNT (POLE)EA 4.000131 60286001INSTALL DMS (POLE MTD CABINET)EA 1.000132 60646055ITS POLE (60 FT)(90 MPH)EA 4.000133 60646092ITS POLE MNT CAB (TY 3)(CONF 2)EA 4.000134 61856002TMA (STATIONARY)DAY 136.000135 61856005TMA (MOBILE OPERATION)DAY 160.000136 61866002ITS GND BOX(PCAST) TY 1 (243636)W/APRNEA 1.000137 63046002ITS RVSD (DATA COLLECT & WWA) SYSEA 6.000138 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: MATERIAL FURNISHED BY THE STATE (PART) $75,000.00 CONTRACTOR FORCE ACCOUNT WORK (PART) $150,000.00 CONTRACTOR FORCE ACCOUNT WORK (PART) $165,000.00