COUNTY: POTTER HIGHWAY: IH 40 LENGTH: 0MI CONTROL NUMBER: 0275-01-215 SBE GOAL: 0.0 % PROJECT NUMBER: C 275-1-215 TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 383 WORKING DAYSGUARANTY: 89,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 08, 2020*EST.COST: 4,492,234.00 BIDS WILL BE OPENED: 1:00 PM JULY 08, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONROY NEUKAM ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 PO BOX 7368 200 E RIVERSIDEAMARILLO, TX 79114 AUSTIN TX 78704-1204806/934-1122 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: EAST OF WASHINGTON ST LIMITS TO: SOUTH OSAGE ST ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6009PREPARING ROW (TREE) (6" TO 24" DIA)EA 17.0001 104 6021REMOVING CONC (CURB)LF 3,412.0002 104 6023REMOVING CONC (CTB)LF 50.0003 164 6040DRILL SEEDING (PERM) (URBAN) (CLAY)AC 1.3804 164 6053DRILL SEEDING (TEMP)(WARM OR COOL)AC 1.3805 169 6003SOIL RETENTION BLANKETS (CL 1) (TY C)SY 6,680.0006 420 6066CL C CONC (RAIL FOUNDATION)CY 73.0007 427 6002CONCRETE PAINT FINISHSF 121,405.0008 432 6001RIPRAP (CONC)(4 IN)CY 936.0009 432 6045RIPRAP (MOW STRIP)(4 IN)CY 184.00010 450 6027RAIL (TY T80SS)LF 136.00011 496 6035REMOV STR (DRILL SHAFT)EA 4.00012 500 6001MOBILIZATIONLS 1.00013 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 19.00014 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 700.00015 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 700.00016 514 6001PERM CTB (SGL SLOPE) (TY 1) (42 )LF 14,624.00017 514 6013PERM CTB (F-SHAPE) (TY 1)LF 30.00018 514 6041PERM CTB (F-SHAPE)(SPL)LF 20.00019 514 6047PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)LF 490.00020 514 6649PERM CTB (TRAN CTB TO SSTR)(MOD)LF 14.00021 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 675.00022 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 24.00023 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00024 542 6001REMOVE METAL BEAM GUARD FENCELF 14,995.00025 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 10.00026 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 25.00027 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 27.00028 545 6005CRASH CUSH ATTEN (REMOVE)EA 1.00029 545 6007CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)EA 1.00030 610 6101REPLACE LUMINAIRE W/LED (150W EQ)EA 99.00031 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 39.00032 658 6026INSTL DEL ASSM (D-SY)SZ (BRF)CTBEA 39.00033 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 63.00034 658 6064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA 54.00035 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 9,500.00036 666 6038REFL PAV MRK TY I (W)12"(LNDP)(090MIL)LF 1,536.00037 666 6041REFL PAV MRK TY I (W)12"(SLD)(090MIL)LF 7,270.00038 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 9,740.00039 666 6305RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)LF 930.00040 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 9,580.00041 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00042 60196004PREFB PV MK W/WNTY TY B(W)4"(SLD)CNTSTLF 39,650.00043 60196007PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTSTLF 16,470.00044 60196012PREFB PV MK W/WNTY TY B(Y)4"(SLD)CNTSTLF 39,310.00045 60196017PREFB PV MK W/WNTY TY B(W)6"(DOT)CNTSTLF 312.00046 61566006REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)EA 11.00047 61856002TMA (STATIONARY)DAY 300.00048 61856003TMA (MOBILE OPERATION)HR 150.00049 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $45,000.00