COUNTY: DONLEY HIGHWAY: SH 70 LENGTH: 0MI CONTROL NUMBER: 0310-01-043 DBE GOAL: 0.0 % PROJECT NUMBER: BR 2021(054) TYPE: BRIDGE MAINTENANCE TIME FOR COMPLETION: 108 WORKING DAYSGUARANTY: 21,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 03, 2020*EST.COST: 1,046,839.00 BIDS WILL BE OPENED: 1:00 PM DECEMBER 03, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMATTHEW HERBSTRITT ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 7599 US 287 200 E RIVERSIDECHILDRESS, TX 792010900 AUSTIN TX 78704-1204940/937-7283 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: @ SALT FORK RED RIVER LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 340 6108D-GR HMA(SQ) TY-D SAC-B PG64-28TON 39.0001 422 6001REINF CONC SLABSF 2,940.0002 422 6015APPROACH SLABCY 67.4003 432 6045RIPRAP (MOW STRIP)(4 IN)CY 32.0004 450 6006RAIL (TY T223)LF 220.0005 454 6018SEALED EXPANSION JOINT (4 IN) (SEJ - M)LF 76.0006 496 6013REMOV STR (BRIDGE SLAB)EA 1.0007 496 6025REMOV STR (APPROACH SLAB)EA 2.0008 496 6099REMOVE STR (RAIL)LF 180.0009 500 6001MOBILIZATIONLS 1.00010 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00011 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 200.00012 510 6003ONE-WAY TRAF CONT (PORT TRAF SIG)MO 6.00013 512 6001PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)LF 420.00014 512 6025PORT CTB (MOVE)(SGL SLP)(TY 1)LF 420.00015 512 6049PORT CTB (REMOVE)(SGL SLP)(TY 1)LF 420.00016 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 500.00017 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00018 542 6001REMOVE METAL BEAM GUARD FENCELF 350.00019 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 4.00020 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00021 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00022 545 6002CRASH CUSH ATTEN (DES SOURCE)EA 2.00023 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 2.00024 545 6005CRASH CUSH ATTEN (REMOVE)EA 2.00025 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 6.00026 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 12.00027 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 24.00028 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 1,000.00029 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 1,000.00030 672 6012TRAFFIC BUTTON TY I-CEA 150.00031 672 6013TRAFFIC BUTTON TY II-A-AEA 350.00032 672 6016TRAFFIC BUTTON TY WEA 750.00033 672 6017TRAFFIC BUTTON TY YEA 2,160.00034 677 6001ELIM EXT PAV MRK & MRKS (4")LF 2,000.00035 678 6001PAV SURF PREP FOR MRK (4")LF 360.00036 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00037 61856002TMA (STATIONARY)DAY 30.00038 61856003TMA (MOBILE OPERATION)HR 30.00039 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $12,000.00