COUNTY: MCMULLEN HIGHWAY: SH 72 LENGTH: 15.5630MI CONTROL NUMBER: 0483-02-021 DBE GOAL: 6.5 % PROJECT NUMBER: STP 2018(077) TYPE: GR, BASE, SURF, PVMT MRKINGS TIME FOR COMPLETION: 354 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM SEPTEMBER 06, 2018*EST.COST: 29,509,401.85 BIDS WILL BE OPENED: 1:00 PM SEPTEMBER 06, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRISTEN LONGORIA ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2304 AVENUE E 200 E RIVERSIDEHONDO, TX 78861 AUSTIN TX 78704-1204830/426-2522 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 97 LIMITS TO: SH 16 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 823.0001 110 6001EXCAVATION (ROADWAY)CY 18,822.0002 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 11,264.0003 161 6017COMPOST MANUF TOPSOIL (4")SY 93,072.0004 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 93,072.0005 164 6043DRILL SEEDING (TEMP) (COOL)SY 93,072.0006 166 6001FERTILIZERAC 39.2007 168 6001VEGETATIVE WATERINGMG 2,905.0008 247 6061FL BS (CMP IN PLC)(TYA GR1-2) (6")SY 54,821.0009 310 6027PRIME COAT(MC-30 OR AE-P)GAL 87,217.00010 316 6410ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)GAL 128,057.00011 316 6431AGGR (TY-PB GR-4)CY 4,270.00012 341 6010D-GR HMA TY-B PG70-22TON 237,305.00013 344 6064SUPERPAVE MIXTURES SP-C SAC-B PG76-22TON 46,466.00014 354 6002PLAN & TEXT ASPH CONC PAV(0" TO 2")SY 2,042.00015 354 6071PLAN & TEXT ASPH CONC PAV (8"-12")SY 363,715.00016 400 6005CEM STABIL BKFLCY 1,287.00017 400 6006CUT & RESTORING PAVSY 9,883.00018 401 6001FLOWABLE BACKFILLCY 1,195.00019 402 6001TRENCH EXCAVATION PROTECTIONLF 1,791.00020 403 6001TEMPORARY SPL SHORINGSF 5,860.00021 420 6002CL A CONC (MISC)CY 3.40022 432 6001RIPRAP (CONC)(4 IN)CY 300.00023 432 6045RIPRAP (MOW STRIP)(4 IN)CY 95.00024 438 6005CLEANING AND SEALING JOINTSLF 560.00025 454 6007HEADER TYPE EXPANSION JOINTLF 560.00026 460 6001CMP (GAL STL 12 IN)LF 284.00027 460 6002CMP (GAL STL 18 IN)LF 493.00028 460 6009CMP AR (GAL STL DES 2)LF 319.00029 462 6003CONC BOX CULV (4 FT X 2 FT)LF 1,298.00030 462 6010CONC BOX CULV (6 FT X 3 FT)LF 1,019.00031 462 6019CONC BOX CULV (8 FT X 4 FT)LF 390.00032 464 6003RC PIPE (CL III)(18 IN)LF 202.00033 464 6008RC PIPE (CL III)(36 IN)LF 56.00034 464 6018RC PIPE (CL IV)(24 IN)LF 2,446.00035 466 6005HEADWALL (CH - FW - 0) (DIA= 24 IN)EA 1.00036 466 6009HEADWALL (CH - FW - 0) (DIA= 36 IN)EA 1.00037 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 9.00038 466 6192WINGWALL (PW - 2) (HW=3 FT)EA 16.00039 466 6193WINGWALL (PW - 2) (HW=4 FT)EA 6.00040 466 6194WINGWALL (PW - 2) (HW=5 FT)EA 4.00041 467 6319SET (TY II) (12 IN) (CMP) (6: 1) (P)EA 8.00042 467 6348SET (TY II) (18 IN) (CMP) (6: 1) (P)EA 14.00043 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 6.00044 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 44.00045 467 6450SET (TY II) (36 IN) (RCP) (4: 1) (C)EA 1.00046 467 6525SET (TY II) (DES 2) (CMP) (6: 1) (P)EA 12.00047 496 6016REMOV STR (PIPE)EA 41.00048 500 6001MOBILIZATIONLS 1.00049 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 22.00050 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 4,200.00051 506 6011ROCK FILTER DAMS (REMOVE)LF 4,200.00052 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 1,800.00053 506 6024CONSTRUCTION EXITS (REMOVE)SY 1,800.00054 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 143,626.00055 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 143,626.00056 508 6001CONSTRUCTING DETOURSSY 46,289.00057 510 6002ONE-WAY TRAF CONT (PILOT CAR)HR 2,064.00058 512 6067PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)LF 2,910.00059 512 6069PTB (MOVE)(F SHAPE)(TY 1) OR (STL)LF 15,750.00060 512 6071PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)LF 2,910.00061 530 6004DRIVEWAYS (CONC)SY 1,882.00062 530 6005DRIVEWAYS (ACP)SY 13,158.00063 533 6001RUMBLE STRIPS (SHOULDER)LF 163,751.00064 533 6002RUMBLE STRIPS (CENTERLINE)LF 81,875.00065 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,600.00066 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 12.00067 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 8.00068 540 6017MTL BM GD FEN (LONG SPAN SYSTEM)LF 100.00069 542 6001REMOVE METAL BEAM GUARD FENCELF 2,148.00070 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00071 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 8.00072 545 6001CRASH CUSH ATTEN (INSTL)EA 8.00073 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 58.00074 545 6005CRASH CUSH ATTEN (REMOVE)EA 8.00075 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 5.00076 560 6005MAILBOX INSTALL-D (TWG-POST) TY 2EA 1.00077 560 6006MAILBOX INSTALL-M (TWG-POST) TY 2EA 1.00078 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 19.00079 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 39.00080 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 6.00081 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 2.00082 644 6034IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)EA 1.00083 644 6037IN SM RD SN SUP&AM TYS80(1)SA(U-WC)EA 4.00084 644 6042IN SM RD SN SUP&AM TYS80(1)SB(T)EA 1.00085 644 6076REMOVE SM RD SN SUP&AMEA 72.00086 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 18.00087 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 50.00088 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 114.00089 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 108.00090 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 125,400.00091 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 125,400.00092 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 3,879.00093 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 184,680.00094 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 184,680.00095 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 16,464.00096 666 6178REFL PAV MRK TY II (W) 8" (SLD)LF 1,030.00097 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 148.00098 666 6184REFL PAV MRK TY II (W) (ARROW)EA 4.00099 666 6192REFL PAV MRK TY II (W) (WORD)EA 4.000100 666 6214REFL PAV MRK TY II (Y) 24" (SLD)LF 12.000101 666 6217REFL PAV MRK TY II (Y) (MED NOSE)EA 1.000102 666 6224PAVEMENT SEALER 4"LF 305,876.000103 666 6226PAVEMENT SEALER 8"LF 1,030.000104 666 6230PAVEMENT SEALER 24"LF 160.000105 666 6231PAVEMENT SEALER (ARROW)EA 4.000106 666 6232PAVEMENT SEALER (WORD)EA 4.000107 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 8,370.000108 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 163,782.000109 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 6,430.000110 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 127,294.000111 672 6007REFL PAV MRKR TY I-CEA 470.000112 672 6009REFL PAV MRKR TY II-A-AEA 2,230.000113 677 6028ELIM EXT PV MRK & MRKS (RUMBLE STRIP)LF 288.000114 678 6001PAV SURF PREP FOR MRK (4")LF 305,876.000115 678 6004PAV SURF PREP FOR MRK (8")LF 1,030.000116 678 6008PAV SURF PREP FOR MRK (24")LF 160.000117 678 6009PAV SURF PREP FOR MRK (ARROW)EA 4.000118 678 6016PAV SURF PREP FOR MRK (WORD)EA 4.000119 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 2,736.000120 60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF 288.000121 61856002TMA (STATIONARY)DAY 502.000122 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $220,000.00