COUNTY: KAUFMAN HIGHWAY: IH 20 LENGTH: 12.1280MI CONTROL NUMBER: 0495-01-074 DBE GOAL: 1.5 % PROJECT NUMBER: NH 1702(759) TYPE: MILL,FDR,BR JTS REPAIR,OL,PVMT MRKS TIME FOR COMPLETION: 120 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 12, 2017*EST.COST: 10,416,958.79 BIDS WILL BE OPENED: 1:00 PM JULY 12, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJEFF BUSH ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2750 S. WASHINGTON 200 E RIVERSIDEKAUFMAN, TX 75142 AUSTIN TX 78704-1204972/962-3617 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 34 LIMITS TO: VAN ZANDT COUNTY LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6004BACKFILL (TY A OR B)STA 640.3601 164 6066DRILL SEEDING (PERM)(WARM OR COOL)SY 248,292.0002 247 6133FL BS (RDWY DEL) (TY D GR 1-2)TON 638.0003 251 6035REWORK BS MTL (TY C) (6") (DENS CONT)SY 3,355.0004 310 6027PRIME COAT(MC-30 OR AE-P)GAL 671.0005 344 6106SUPERPAVE MIXTURES SP-D PG64-22TON 14,582.0006 344 6168SUPERPAVE MIXTURES SP-D PG64-22(LEV-UP)TON 290.0007 346 6002STONE-MTRX-ASPH SMA-C SAC-A PG76-22TON 67,259.0008 351 6008FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")SY 3,355.0009 354 6045PLANE ASPH CONC PAV (2")SY 98,321.00010 356 6021PAV JT UNDERSEAL (24")LF 3,000.00011 438 6010RESIZING AND SEALING JOINTSLF 3,000.00012 500 6001MOBILIZATIONLS 1.00013 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00014 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 3,000.00015 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 3,000.00016 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 1,200.00017 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,200.00018 533 6001RUMBLE STRIPS (SHOULDER)LF 174,684.00019 540 6001MTL W-BEAM GD FEN (TIM POST)LF 15,881.00020 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 41.00021 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 37.00022 542 6001REMOVE METAL BEAM GUARD FENCELF 15,881.00023 542 6003REMOVE DOWNSTREAM ANCHOR TERMINALEA 37.00024 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 41.00025 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 55.00026 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 55.00027 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 139.00028 658 6064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA 104.00029 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 3,704.00030 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 4,500.00031 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 32,018.00032 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 131,262.00033 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 127,572.00034 672 6007REFL PAV MRKR TY I-CEA 1,653.00035 672 6009REFL PAV MRKR TY II-A-AEA 3,004.00036 130026001MEMBRANE UNDERSEALGAL 103,529.00037 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00038 1A30196001TRACKLESS TACK COATGAL 103,529.00039 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $32,500.00