COUNTY: VAN ZANDT, ETCHIGHWAY: IH 20, ETCLENGTH: 34.3270MI CONTROL NUMBER: 0495-02-063, ETCDBE GOAL: 0.0 % PROJECT NUMBER: STP 1702(381)HES, ETC TYPE: UPGRD MBGF, SGT, MOW STRIP TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 41,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 06, 2017 EST.COST: 2,092,608.20 BIDS WILL BE OPENED: 1:00 PM JUNE 06, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONPAUL SCHNEIDER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 205 N. EAST SL 564 200 E RIVERSIDEMINEOLA, TX 75773 AUSTIN TX 78704-1204903/569-2349 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ VAN ZANDT0495-02-063KAUFMAN C/L, E IH 20STP 1702(381)HESSH 19 IN CANTON LENGTH: 13.8180 MILES SMITH0495-04-071VAN ZANDT C/L, E IH 20STP 1702(382)HES0.826 MI E OF US 69 IN LINDALE LENGTH: 13.1430 MILES SMITH0495-05-0520.826 MI E OF US 69 IN LINDALE, E IH 20STP 1702(383)HES1.1 MI E OF US69-CR431/JIM HOGG RD LENGTH: 0.2780 MILES HENDERSON0697-02-058FM 2613, E FM 85STP 1702(384)HESSH 274 IN SEVEN POINTS LENGTH: 7.0880 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 368.0001 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 11,619.0002 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 15,748.0003 164 6055BONDED FBR MTRX SEED (TEMP)(WARM)SY 7,876.0004 164 6056BONDED FBR MTRX SEED (TEMP)(COOL)SY 7,876.0005 168 6001VEGETATIVE WATERINGMG 347.0006 432 6045RIPRAP (MOW STRIP)(4 IN)CY 1,268.0007 451 6004RETROFIT RAIL (TY T131RC)LF 484.0008 500 6001MOBILIZATIONLS 1.0009 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 19.00010 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 800.00011 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 800.00012 512 6005PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF 360.00013 512 6029PORT CTB (MOVE)(F-SHAPE)(TY 1)LF 360.00014 512 6041PORT CTB (STKPL)(F-SHAPE)(TY 1)LF 360.00015 540 6001MTL W-BEAM GD FEN (TIM POST)LF 16,037.50016 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 100.00017 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 73.00018 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 31.00019 542 6001REMOVE METAL BEAM GUARD FENCELF 13,012.50020 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 35.00021 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 54.00022 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 102.00023 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 86.00024 545 6001CRASH CUSH ATTEN (INSTL)EA 6.00025 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 6.00026 545 6005CRASH CUSH ATTEN (REMOVE)EA 6.00027 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 189.00028 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 395.00029 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 858.00030 ROAD USER COST 800 6001NO. OF WORKING DAYS$/D 15,000.00031 ** THE NO. OF WORKING DAYS OF 246.000 WILL BE USED ONLY FOR BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST.